Welcome Customer !

Membership

Situated in Ningbo, Zhejiang, Ningbo Huadong Machinery Co., Ltd
Free Member ·1YRS
,
Other

Main Products: 食品机械

Xwboo>Products

Situated in Ningbo, Zhejiang, Ningbo Huadong Machinery Co., LtdFree·1YRS

  • E-mail

    cali@huadongcn.com

  • Phone

    +86-13429390286

  • Address

    No.658 Mozhi(N) Rd, Dongqian lake industry developing zone.

Contact Now

Mylikes Production Line Tech

Model
Nature of the Manufacturer
Other
Product Category
Starch Mogul LINE
Place of Origin
City, Province
Overview
Mylikes Production Line Tech
Product Details

1.Firstly put hot water into Mylikes mixing tank and then manually put material into Mylikes mixing tank ( hot water pipe with metering pump to control hot water amount automatically) 
Rule No. 1: hot water temperature should around 75-80℃, in winter to make it a little higher, in summer make it a little lower (for example, in China, the room temperature in winter is around 10-15, then fty use around 85℃, in summer use 78℃ for hot water, pls consider your country’s room temperature in different season.)
Rule No. 2: Put hot water first and then put material inside 
Rule No. 3: After mixing hot water with material, the temperature of liquid temperature is around 40-50℃ 
Rule No. 4: Mixing time: around 2 min (Judgement based on if the material is completely dissolved or not)
Rule No. 5: About material putting sequence: put big material firstly(like: refined powder / non-dairy creamer ), mixing after around half mixing time then put small material(like NAHCO / NH4HCO3) 
2.After dissolving all material with hot water, then pump the liquid from mixing tank to storage tank
Rule No. 6: Shorter storage time better effect
Rule No.7: The capacity between production material and storage material should be 10-20% is best. This means if your production for depositing need 100kg each time, then the material keep in storage is better to be 110-120kg. 
3.After storage tank, use pump to send the material from storage tank directly to depositing hopper. 
4.After depositing, move all tray with material into Dry room
Rule No. 8: drying has two different process:
first process: dry room temperature should be around 120-125℃ to dry for around 1 hour, this one hour is used to let mylikes center material to be fermentation, judgement based on if mylikes center is favoses or not? If not, make time a little longer. Then after mylikes center looks like honeycomb then reduce the steam amount of dry room, to let dry room temperature go down to be around 80℃
Second process: after dry room temperature decreased to 80℃, then keep it around 10 hours, this 10 hours is used to remove the moisture inside mylikes center, judgement based on mylikes center’s moisture if reach 2% -3% or not, if no, dry a little time more. 