Using advanced membrane preparation technology and fully automated production line, the reliability and stability of product performance are guaranteed. Water treatment nanofiltration NTF series membranes integrate high water flux, high rejection rate and high durability. It can be used for rolling components of different specifications from domestic 1812 to industrial 8040.
Product Description
Using advanced membrane preparation technology and fully automated production line, the reliability and stability of product performance are guaranteed. Water treatment nanofiltration NTF series membranes integrate high water flux, high rejection rate and high durability. It can be used for rolling components of different specifications from domestic 1812 to industrial 8040.
Product performance
| Model | Stable Water Flux (GFD) | Minimum salt rejection (%) | Features |
| NTF40 | 30 | 97.5 | Low pressure high flux |
| NTF80 | 24 | 98.0 | High calcium and magnesium removal |
| NTF90 | 20 | 98.5 | High monovalent ion removal |
a) Test conditions: 70 psi (0.48 MPa), 2000 ppm MgSO4 solution, temperature 25℃, pH=7.0±0.5, concentrated water flow rate 2 L/min.
b) The produced water was collected after 30 minutes of stable operation; the fluctuation range of water flux was ± 10%.
c) Each roll of film is individually packaged, and the normal film roll length is about 300m, but it may change under certain circumstances.
Storage conditions and warranty period
Storage conditions: Avoid sunlight and ultraviolet radiation, ambient temperature 10-30°C, humidity <60%.
Warranty period: The original packaging is guaranteed for 12 months before unpacking, and it is recommended to use it up within 6 months after receipt.
Notes:
The water yield listed in the table is the average value, and the water yield error of a single membrane element is within ±20%.
The test conditions are not the best conditions for use, please consult our technical staff for details.
The membrane element is equipped with a pressure vessel with a nominal inner diameter of 2.5/4/8 inches.
Before the NF system starts, the system preprocessing and debugging, membrane element filling, instrument calibration and other system testing should be completed.
The water inlet of the membrane element should gradually increase the pressure, and the time to increase the pressure to the normal operating state should not be less than 60 seconds.
The newly installed membrane should be rinsed at low pressure for more than two hours, and the NF pure water should be drained.
Be careful to avoid back pressure on the product water side, the pressure on the product water side is not greater than 5PSI of the pressure on the water inlet side.
All membrane elements have been rigorously tested before leaving the factory, and are packaged with dry film technology, and the outer packaging is a reinforced cardboard box.
It is forbidden to add any chemicals that affect the membrane elements during storage and operation. Check the latest version of the technical manual, design guide, or consult a technical expert.
If the customer does not operate according to the standard process, he will not bear all the consequences arising therefrom.
Due to technical improvements and product updates, product information may be changed at any time without prior notice. Please pay attention to the latest product information.
The data and information provided by the company in this material are obtained through long-term experiments. We believe that these data and information are accurate and effective. However, due to the user's use methods, conditions of use and applicable laws It is not responsible for the consequences and losses caused by the use of the data and information of this product and its samples, regardless of whether it is used alone or in conjunction with other products. It is recommended that users conduct their own experiments to determine their safety and whether they are suitable for the user's specific use. Purpose.
Important Information
1. Before the membrane element is installed, the system and pipeline should be thoroughly cleaned to ensure that there is no damage to the membrane caused by any mechanical impurities.
2. Before running the system, it should be ensured that the preprocessing and debugging are completed.
3. During the startup, shutdown, cleaning and other processes of the system, the water inlet should be slow, from low pressure to high pressure, from low flow to large flow, to avoid impact damage to the membrane element due to the instantaneous increase of pressure and flow.
4. Membrane element - once water enters, it should always be kept wet.
5. Avoid back pressure on the permeate side at all times.