Q44FStainless steel three-way flange ball valve can be divided into L-shaped and T-shaped. L-shaped (q44f) three-way ball valve is used for medium flow direction switching, which can connect two vertical channels; T-shaped (q45f) three-way ball valve is used for medium diversion, confluence and flow direction switching. T-shaped tee can connect three channels or two of them. Three way ball valve generally adopts two seat structure, or four seat structure according to user's requirements.
Product overview
Q44FStainless steel three-way flange ball valve can be divided into L-shaped and T-shaped. L-shaped (q44f) three-way ball valve is used for medium flow direction switching, which can connect two vertical channels; T-shaped (q45f) three-way ball valve is used for medium diversion, confluence and flow direction switching. T-shaped tee can connect three channels or two of them. Three way ball valve generally adopts two seat structure, or four seat structure according to user's requirements.
performance parameter
performance parameter
Q44FMain performance parameters of stainless steel three way flange ball valve| 试验压力 | Nominal pressure(Mpa) |
| Mpa | 1.6 | 2.5 | 4.0 | CL150 | JIS10K |
| strength test | | 3.8 | 6.0 | 3.2 | 2.4 |
| Sealing test | 1.8 | 2.8 | 4.4 | 2.2 | 1.5 |
| Air tightness test | 0.5-0.7 |
| working temperature | PTFE≤150℃ PTL≤300℃ |
| Applicable temperature | C:Water, oil and gas; P: nitric acid; R: acetic acid |
Parts material
Q44FMain parts materials of stainless steel three way flange ball valve| Stainless steel three-way flange ball valve main parts material body and cover | WCB、CF8 |
| sphere | WCB+Hcr、CF8 |
| Stem | 2Cr13、CF8 |
| valve seat | PTFE |
| filler | PTFE |
Dimensions
Q44FMain dimensions of stainless steel three way flange ball valve| Nominal pressure | Nominal diameter | L | L1 | H | W | weight(kg) |
| Mpa | mm | in | mm | mm | mm | mm | 1.6 | 2.5 | 4.0 | CL150 | JIS10K |
1.6 2.5 4.0 CL150 JIS10K | 15 | 1/2 | 130 | 65 | 62 | 100 | 2.5 | 3.0 | 3.5 | 2.5 | 2.5 |
| 20 | 3/4 | 150 | 75 | 68 | 160 | 3.0 | 3.5 | 4.5 | 3.0 | 3.6 |
| 25 | 1 | 160 | 80 | 75 | 160 | 4.8 | 5.0 | 6 | 5.0 | 5.0 |
| 32 | 1 1/4 | 180 | 90 | 85 | 200 | 6.5 | 7 | 8.5 | 7 | 7 |
| 40 | 1 1/2 | 200 | 100 | 95 | 200 | 8.5 | 9 | 10.5 | 9 | 9 |
| 50 | 2 | 230 | 115 | 110 | 250 | 11 | 12 | 14 | 12 | 11 |
| 65 | 2 1/2 | 290 | 145 | 130 | 300 | 15 | 17 | 20 | 16 | 16 |
| 80 | 3 | 310 | 155 | 155 | 400 | 21 | 22 | 32 | 21 | 22 |
| 100 | 4 | 350 | 175 | 180 | 500 | 33 | 36 | 50 | 36 | 36 |
| 125 | 5 | 400 | 200 | 250 | 600 | 65 | 70 | 80 | 68 | 70 |
| 150 | 6 | 480 | 240 | 275 | 800 | 103 | 110 | 120 | 105 | 105 |
| 200 | 8 | 580 | 290 | 325 | 1000 | 152 | 168 | 180 | 160 | 160 |
matters needing attention
1. Be careful in installation and construction, and do not hit the valve.
2. Before installation, the ball valve should be inspected to check the specification and model, and identify whether there is damage, especially for the valve stem. Turn it a few times to see if it is skewed, because Zui is prone to bump the stem during transportation. Also remove the debris in the valve.
3. When lifting the ball valve, the rope should not be tied to the hand wheel or the valve stem to avoid damage to these parts, but should be tied to the valve body.
4. The pipeline connected to the ball valve must be cleaned. Compressed air can be used to blow away iron oxide chips, mud and sand, welding slag and other impurities. These debris, not only easy to scratch the sealing surface of the ball valve, in which large particles of debris (such as welding slag), but also block the small valve, so that its failure.
5. The position of valve handle rotation should be reserved during installation. 6. The ball valve cannot be used as throttling. 7. The ball valve with transmission mechanism shall be installed vertically.