Welcome Customer !

Membership

Huazheng Electric Manufacturing (Baoding) Co., Ltd.
Free Member ·1YRS
BaoDing,HeBei
Manufacturer

Main Products: Other High Voltage Electrical Appliances|Battery Tester|Electric Energy Meter Verification Device

Xwboo>Products
Product Categories

Huazheng Electric Manufacturing (Baoding) Co., Ltd.Free·1YRS

  • E-mail

    sales09@bdhuazheng.com,sales@bdhuazheng.com

  • Phone

    86-312-6775511

  • Address

    Electric Valley Technology Center, No. 3088 Lekai North Street, Baoding city, Hebei China

Contact Now

Transformer Oil Filter Transformer Vacuum System Oil Filter Machine Transformer Oil Regeneration ...

Model
Nature of the Manufacturer
Manufacturer
Product Category
Oil Filter
Place of Origin
City, Province
Overview
Transformer Oil Filter Transformer Vacuum System Oil Filter Machine Transformer Oil Regeneration Equipment
Product Details

1. Product technical parameters

Model: HZLY-100A

Nominal flow: 6000L/h

Net oil capacity: 100L/min

Pumping rate: 540M³/h

Ultimate vacuum degree: ≤5Pa

Working pressure: ≤0.5Mpa

Working oil temperature: 20~80℃

Working power supply: 50Hz380V three-phase three-wire

Heating power: 60KW (separately controlled in two groups)

Total power: 67KW

Operating noise: ≤75dB(A)

Inlet/outlet flange: DN40

Vacuum interface flange: DN40

Dimensions: 175×155×190cm

Equipment weight: 820Kg

Continuous working time: ≥200 hours

Average trouble-free working time: ≥5000 hours


2. Product net oil index

oil to be treated

Breakdown voltage: >30kV (ball pole);

Water content: ≤50ppm;

Air content: ≤10% (volume ratio);

after a process

Breakdown voltage: >60kV (ball pole);

Water content: ≤10ppm;

Air content: ≤0.2% (volume ratio);

After three-four processes

Breakdown voltage: >70kV (ball);

Water content: ≤5ppm;

Air content: ≤0.1% (volume ratio);

Acetylene content: 0


3. Product function introduction

◇Remove moisture from oil.

◇Remove gas dissolved in oil.

◇Remove solid particles in oil.

◇On-site oil treatment of transformers and vacuum drying of electrical equipment.

◇On-site hot oil circulation drying is performed on the transformer.

◇After the oil is treated, the 20-60m3 transformer can be oiled under vacuum conditions.


Similar Product Recommend