Welcome Customer !

Membership

SUNSWELL MACHINERY CO., LTD.
Free Member ·1YRS
ZhangJiaGang,JiangSu
Manufacturer

Main Products: Beverage Filling Equipment

Xwboo>Products

Factory Price New arrival aseptic small bottled milk filling machine

Model
Nature of the Manufacturer
Manufacturer
Product Category
Aseptic Filler
Place of Origin
City, Province
Overview
Aseptic Cold Filling Machine:Our Aseptic cold filling line on basis of the advantages of the similiar foreign products. Our Aseptic cold filling line adopts aseptic isolation technology to ensure the aseptic of filling material,packing environment and packaging containers.Reliable sterilizing method is used to sterilize empty bottles and caps.
Product Details

1

Aseptic Cold Filling Machine:
Our Aseptic cold filling line on basis of the advantages of the similiar foreign products. Our Aseptic cold filling line adopts aseptic isolation technology to ensure the aseptic of filling material,packing environment and packaging containers.Reliable sterilizing method is used to sterilize empty bottles and caps.

In addition,the utilization of COP and SOP ensures the asepsis of the equipment inside and outside surface and adoption of aseptic compressed air ensures the positive pressure of filling environment for clean room environment.

Whats's more,CIP cleaning and SIP sterilizing are used to clean and sterilize the material pipeline,which prevents the material sterilized by UHT from being polluted, thus ensuring the asepsis of final products.

Main Features:

1.Our Aseptic cold filling line is modularly constructed for great flexibility.It combines the dumping machine,rinser,filler and capper into one unit,and the part above the table-board is full closed by shielding can.
2.The rinsing machine can wash the inside and outside of the empty bottle by aseptic water.Dripping is also available.
3.The use of non-contact filling valve effectively prevents second pollution.
4.The imported electronic weighing sensor of filling valve ensures high measuring precision and makes it convenient to adjust product variety.
5.Transmisson part of capping plunger chip uses heat shield device to effectively seperate the pollution zone and clean zone.
6.The adoption of magnetic constant torque capping head helps ensure capping quality.
7.Our Aseptic cold filling line is equipped with centralized lubrication system.
8.Automatic control of CIP and SIP operations is realized.
Detailed Images:
主图 (7)

Bottle Inlet

主图 (6)

Rinser

主图 (8)

Filler

4

Capper

Product List


Model
Output
CGF14-12-5
5000BPH (500ml)
CGF16-16-5
7000BPH (500ml)
CGF24-24-6
10000BPH (500ml)
CGF32-32-8
15000BPH (500ml)
CGF40-40-10
18000BPH (500ml)
CGF50-50-12
22000BPH (500ml)
CGF72-72-18
30000BPH (500ml)
CGF84-84-20
36000BPH (500ml)

About Sunswell:

Set up in 2008, Sunswell leads the market in the field of liquid bottling, blow molding, labeling, packaging machinery and process technology for water, tea, juice, carbonated drinks, energy drinks, liquid, beer, edible oil, dairy and daily care products, etc.

Advantage:

(1)A to Z turnkey plant provider (2)Fully automatic or economic solution optional (3)10+ years of global market experience

(4)Serve customers over 50 countries and regions worldwide

45sunswellcn-产品详情页_07sunswellcn-产品详情页_06sunswellcn-产品详情页_03sunswellcn-产品详情页_11


FAQ
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.

Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.

Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.

Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If
needed.Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.

Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.

Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units tosave international courier such as DHL, it is really costly.

Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.

Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.




Similar Product Recommend