Welcome Customer !

Membership

Zhangjiagang City New Crown Machinery Co., Ltd.
Free Member ·1YRS
ZhangJiaGang,JiangSu
Manufacturer

Main Products: Filling Machine|Labeling Machine

Xwboo>Products

Double Layer Insulated Pastuerizing Tunnel Machine

Model
Nature of the Manufacturer
Manufacturer
Product Category
Beer Filling Machine
Place of Origin
City, Province
Overview
Double Layer Insulated Pastuerizing Tunnel Machine
Product Details
Double Layer Insulated Pastuerizing Tunnel  Machine
Double Layer Insulated Pastuerizing Tunnel  Machine
Double Layer Insulated Pastuerizing Tunnel  Machine
Double Layer Insulated Pastuerizing Tunnel  Machine
Double Layer Insulated Pastuerizing Tunnel  Machine
Double Layer Insulated Pastuerizing Tunnel  Machine
Double Layer Insulated Pastuerizing Tunnel  Machine
Double Layer Insulated Pastuerizing Tunnel  Machine
Double Layer Insulated Pastuerizing Tunnel  Machine
Double Layer Insulated Pastuerizing Tunnel  Machine

Features

  • soft drink/Beer pasteurizer tunnel is used for bottled/canned beer and soft drink pasteurizing.

Product Description

Beer pasteurizer tunnel

Advantage
1, It can be used for various of bottle shapes and volumes;

2, Easy construction for easy maintenance;

3, Speed adjustable;

4, Transparent glass window at entrance and end will make clear of view if any problem happening inside tunnel and open able top will help for easy problem solving;

5, the recycle water system will help for reducing water consumption;

6, engineering plastic chain can be both cold and heat resistant; it can prolong machine life time. Conveyor is by high intensity plastic chain belt, is with high intensity, acid resistant, rot resistant and abrasion resistant.

7, Spray angel can be 360°adjustable; spray to every position of bottles averagely, it will make full use of spray water and it will increase spray area. Spraying nozzles is from Spraying systems-USA,spray averagely;

8, Main motor is with overload protection, can protect conveyor and conveying devices safely. Main driver adopts stepless motor, conveyor speed is changed freely.

Parameter:

Capacity:5000-6000 CPH

Can inlet temp :5 deg C

Can outlet temp :25-30 deg C

Suggested temp zone qty:6

Motor Consumption:2.2KW

Pump consumption: 3KW*2 sets

2.2KW*4 set

Heat exchanger area:6m2*2 sets

Working area:15.98m2

Belt length:9.4m

Belt width:1.7m

Weight:1500kg

Steam consumption:350KG/H

Dimension:10000×2000×1700mm

Main components

Water pump

NANFANG

Temp sensor

JUMO

Steam control valve

Spirax DN40

PLC

Siemens

Approach switch

Autonics

photoelectric

Autonics

PLC

Siemens S7-1500 with temperature control, water pump flow rate control

Drawing concept

Zone 1

Zone 2

Zone 3

Zone 4

Zone 5

Zone 6

1.3m,6.6min/22℃

1.3m,6.6min/38℃

2m,10min/67.5℃

2.2m,11min/63℃

1.3m,6.6min/37℃

1.3m,6.6min/21℃

water flow 25t/h, lift 18m

water flow 25t/h, lift 18m

water flow 50t/h, lift 18m

water flow 50t/h, lift 18m

water flow 25t/h, lift 18m

water flow 25t/h, lift 18m


Advantages:

The principle is: Conveyor brings bottles/cans into the cooling tunnel, there will be hot/cold water generated from side holding tanks to spray by spray nozzles on the top of tunnel onto passing bottles.

With heat exchange principle, the bottles/cans temperature will be bring up to high temperature to pasteurize the virus inside vessel, the bring down again by cold water to normal room temperature to keep longer shelf life.

Application:

Beer pasteurizer tunnel is used for bottled/canned beer pasteurizing.


Packaging & Delivery:

All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.

FAQ:

1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .


2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT


4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON


Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.


Video: