Product Description
Fruit juice filling machine
Product Description:
Fruit juice filling machine preparation system includes: Steam boiler (prepared by customer), hot water system, jacket high shear emulsification tank (high speed), jacket beverage mixing tank (medium speed), double filter, high pressure homogenizer, plate sterilizer, insulation balance tank, drink pump, CIP system, electric control system, connection pipe, cable bridge etc.
Material: stainless steel 304, touching part stainless steel 316. Material offer by ZPSS;
Features:
- Hot water system is applied in whole line for saving energy. The steam boiler only heat the water, which will be pumped into another mixing tank for better mixing and melting;
- There is independent electric control system for whole line, controlled by PLC;
- NOTE the touch screen will be apply “Pro-Face", it can be remote control under internet condition; Once machine program down, we can modify in our factory;
- Inside treatment of tank are well polished without any line and scracth;
- We will connect all the pipes and cable connection in our factory and having whole system running;
- CIP cleaning ball will be add into all the tanks for better cleaning;
Technical Parameter:
Production capacity | Total power | Steam consumption |
(LPH) | Kw | Kg |
1000 | 20.1 | 500 |
1500 | 66.25 | 600 |
2000 | 68 | 600 |
3000 | 82.75 | 600 |
3500 | 82.75 | 650 |
5000 | 93.75 | 1750 |
(NOTE: Above data is summarized by client’s requirements.)
Application:
Fruit juice filling machine preparation system is used for making juice from juice concentrate which can be sold in the market.
Packaging & Delivery:
All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.

FAQ:
1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .
2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT
4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON
Installation and maintenance:
The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.
Video: