Welcome Customer !

Membership

Zhangjiagang City New Crown Machinery Co., Ltd.
Free Member ·1YRS
ZhangJiaGang,JiangSu
Manufacturer

Main Products: Filling Machine|Labeling Machine

Xwboo>Products

CIP Cleaning System

Model
Nature of the Manufacturer
Manufacturer
Product Category
Juice Filling Machine
Place of Origin
City, Province
Overview
CIP Cleaning System
Product Details
CIP Cleaning System
CIP Cleaning System
CIP Cleaning System
CIP Cleaning System
CIP Cleaning System
CIP Cleaning System
CIP Cleaning System
CIP Cleaning System
CIP Cleaning System
CIP Cleaning System
CIP Cleaning System
CIP Cleaning System

Features

  • CIP cleaning system is used for items in-place cleaning of pipes, valves and vessels, can also apply to the brewery, beverage plants, and general food production materials of pipes and equipment cleaning. Normally it mainly contains three tanks, hot acid water tank, hot alkali water tank and hot water tank separately.

Product Description

CIP Cleaning System

Product Description:

CIP cleaning system is used for items in-place cleaning of pipes, valves and vessels, can also apply to the brewery, beverage plants, and general food production materials of pipes and equipment cleaning. Normally it mainly contains three tanks, hot acid water tank, hot alkali water tank and hot water tank separately.

A beverage pump which can bear hot temperature is used in CIP to convey cleaning liquid into material pipe and equipment, circulate to equipment circularly. Therefore, the equipment utilization can be improved without the disintegration of the equipment and the pipeline, and reduce labor intensity of workers. Therefore, this product is an advanced of cleaning process equipment.


Advantages:

A beverage pump in CIP cleaning system which can bear hot temperature is used in CIP to convey cleaning liquid into material pipe and equipment, circulate to equipment circularly. Therefore, the equipment utilization can be improved without the disintegration of the equipment and the pipeline, and reduce labor intensity of workers. Therefore, this product is an advanced of cleaning process equipment.

Working principle

A water cleaning

When the material is finished, use water to clean immediately to eliminate residual material, at the same time it is more advantageous to the next step of liquid water cleaning. water can stop when the equipment flow of water out of clearing.

B Alkali-cleaning

The NaOH makes up to 2% concentration alkaline twist in the holding tank, heated to 80 ℃, then cycling about 30minutes. The alkali can dissolve protein, butterfat and make the fouling loose foam. If the scale is more serious, it can increase the concentration of the solution.

C Water cleaning

Use water to flush about 15 minutes after remove the alkali.

D Acid-cleaning

Make the HNO3 into the concentration of 2% acidic detergent, then heat to 80℃, cycling about 30minutes.

E Water cleaning

Use water to flush about 15 minutes after remove the acid, in case of the materials are polluted during reproduction.

Technical Parameter:

Capacity

1000LPH

Material

Stainless steel 304

Working pressure

Normal pressure in tank, in steam pipe 0.3-0.7Mpa

Working temperature

A: In acid, alkaline and water tank 0-85℃

B: Water pipe normal pressure

Material name

Acid and alkaline liquid tank 2% tric acid solution .2% caustic liquid

Total volume

Acid and alkaline liquid tank; 2×1Ma

Filling coefficient

80%

Capacity categories

Atmospheric Tank

Each cleaning time

Free

The order of cleaning fluid

Hot water – hot acid water – hot water – hot alkaline water – hot water

Maximal centrifugal pressure head

24m

Motor power

2.2kw

Weight

700kg

Size

5000*1500*2500mm

Tank size

Tank diameter: 1250mm

Total height: 2000mm

Outside layer thickness: 2mm

Inside layer thicknedd: 2mm

Insulation layer: 50mm

Material: stainless steel 304

Dosing pump: 60w * 2pcs = 120w

Beverage pump power: 3kw

Application:

CIP cleaning system is used for items in-place cleaning of pipes, valves and vessels, can also apply to the brewery, beverage plants, and general food production materials of pipes and equipment cleaning.


Packaging & Delivery:

All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.


FAQ:
1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .

2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT

4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON

Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.


Video: