Partial discharge tester is widely used in insulation testing of high voltage, big capacity electrical equipment,partial discharge testing system and GIS transformer accuracy testing.
Product Details
Introduction
Partial discharge tester is widely used in insulation testing of high voltage, big capacity electrical equipment,partial discharge testing system and GIS transformer accuracy testing. All of the high voltage components are encapsulated in airtight space with high safe performance , the partial discharge is less than 2 pC. What is more, the whole system will be installed in the measuring car and the device can be adjustable according to the testing object’s height, angle,achieving direct mouth-mouth connection with the testing object like GIS, we name it as GTU series. Now it become more convenient on-site.
Hot tags: partial discharge testing system, partial discharge tester supplier,partial discharge measurement, ac voltage tester
Complete unit wiring schematic for PD tester
PD test system main compositions
Basic system components
1.Column voltage regulator (GIS voltage transformer system adopts frequency conversion power supply module)
2.GLB power isolating transformer
3.BCL compensating reactor
4.GTU PD test transformer
5.High voltage divider (capacitor type)
6.A basic test interface
7.Digital operation console
8.Coupling capacitor
Optional for users
1.Portable Partial discharge detector
2.SF6 high voltage bushing and isolating switch
3. Interfaces and disconnecting switches for different types of test items
4.Universal adjustment docking platform for GIS switch test
5.Standard voltage transformer (for testing system of GIS voltage transformer only)
6.Three phase test change-over switch
7.Insulator test tank
8.Partial discharge standard injection port
9.Peak voltmeter
Main parameters for main components
1.SF6-insulated testing transformer with PD
GTU high-voltage partial discharge testing transformer is the key of the test system, it is placed in an insulated container designed specifically for SF6 in the high voltage side isolated from other loop through high pressure disc insulator, low voltage terminal all placed in the junction box.
The low voltage side of transformer winding and an excitation winding and measuring winding (measuring winding only for system testing), for large capacity transformer (500kVA) compensation compensation winding independent, to better play the test pressure and load flexibility, improve the efficiency of compensation.
The transformer tank is equipped with an inflatable / vacuum quick joint, a pressure monitoring meter, an over pressure release valve and a temperature and pressure sensor for the operation of the console to carry out remote monitoring.
Voltage (KV)
Current (A)
PD under rated volt(Pc)
Short circuit resistance
Regulator kVA
Temp rising (60mins at rated current)
250
0.5--5
≤3Pc
≤8%
50--200
≤65K(Power frequency)
350
400
500
0.5--4
550
600
800
1.0--3
≤5Pc
1000
1200
2.Column voltage regulator
The voltage regulator adopts an air insulated column voltage regulator, and a smooth voltage output can be obtained. The component is isolated from the power supply, and the transformer and the compensating reactor are arranged in the same frame to facilitate transportation. The input and output of the regulator are equipped with air circuit breaker which is isolated from the power supply of the system, and the drive motor allows slow and fast voltage regulation. Zero start chain enables step-up operation to be guaranteed step by step from zero pressure
Capacity (kVA)
Input (V)
Output (V)
Output (A)
50
380
0--400
125
100
250
150
375
200
500
3.Power isolation transformer
The main function of the power isolation transformer is to reduce the interference from the main power line, so as to ensure that the background of the partial discharge measurement is below 1Pc.
Capacity matching with voltage regulator.
4.High voltage measurement
High voltage measurement signal from the installation of built-in system pipeline divider, with peak voltage meter can display the peak voltage of 2 V / and effective value.
-Measuring accuracy + 1% measurement value (10%--99% rated voltage)
-Measuring ratio 10000:1
-Rated voltage: matching maximum voltage of system
-Rated capacitance 50pF
-Partial discharge ≤2pc
5.Coupling capacitor
The coupling capacitor is mounted on a specially designed SF6 insulated tank, high voltage electrode disk insulator is connected with the high voltage end through the main system. Since the capacitor is mounted in a fully enclosed metal tank, it is free from any other stray capacitance and ensures high sensitivity to partial discharge measurements. The low voltage electrode of the coupling capacitor is directly drawn to the terminal seat of the tank through the shielding lead wire, and is connected with the measuring impedance.
-Rated voltage matches the maximum voltage of the system
-Rated capacitance: 100pF
-Partial discharge quantity ≤2pc
6.Compensation Reactor
The compensation reactor is used to compensate the capacitive current of the tested product. The reactor consists of two coils, and through the tap of the coil, a combination of a plurality of compensating powers can be formed. The combination can be switched by hand, and the remote operation can be realized on the operation console
Technical parameters of compensation reactor (partial model)
Model
Capacity ( kVA)
Voltage V
BCL-100
100
400
BCL-200
200
400
BCL-500
500
1000
BCL-1000
1000
2000
BCL-1500
1500
2000
BCL-2000
2000
3000
7. GTU operation control system
The operation control system provides safe and convenient computer operation for AC high voltage test.
Operation
- High voltage test system shown on the big screen can be easy and intuitive operation
- Main circuit breaker on/off
- on/off operation (high voltage contactor start / stop)
- Automatic zero start
- Preset speed boost (up to 3 speed)
- Preset pressure value required
- Preset time pressure (withsand time after finishing automatic up/down voltage.
- Compensation reactor on/off
- High voltage isolation switch on/off interface
Measure
- First input current and voltage display
- Transformer input current and voltage display
- High voltage display
- Withsand test time display
- Testing system SF6 gas chamber pressure display
- Transformer chamber temperature display SF6
Protection
- Preset value of over voltage protection
- Preset value of overcurrent protection
- Gas chamber pressure / temperature automatic protection
- Lock other operation - Boost
8.Universal adjustable butt joint platform
The platform is specially designed for the GIS switch test system, which can be easily connected with the GIS system flange.
Adjustable range
-Vertical adjustment: ±200mm
-Level adjustment (X): ±100mm
-Level adjustment (Y): ± 100mm
-Angle adjustment : ±5º
Specification can be customized according to client’s requirements.