Welcome Customer !

Membership

Wuhan Goldhome Hipot Electrical Co., Ltd.
Free Member ·1YRS
WuHan,HuBei
Manufacturer

Main Products: High Voltage Tester|Automobile Exhaust Gas Analyzer

Xwboo>Products

Partial Discharge Measurement

Model
Nature of the Manufacturer
Manufacturer
Product Category
Pd Tester
Place of Origin
City, Province
Overview
PC amount: ≤5PC,at rated 60%voltage,≤3PCOutput voltage:0~100kV(Can be customized)Rated capacity:10kVA(Can be customized)Waveform deviation factor:≤3%
Product Details
Introduction


Partial discharge measuring equipment is one higher requirement for hipot testers.

With the progress of basic scientific research , the application of new materials and new processes has pushed the new medium SF6 gas testing transformer to the application field of electric equipment.

Sf6 gas testing transformer is widely used as a new insulating medium because of its excellent insulation performance, arc extinguishing performance and non-combustibility.

After years of efforts, our company has successfully developed SF6 gas PD test transformer hipot tester.

Hot tags: Inflatable gas testing transformer, sf6 gas pd testing transformer, sf6 gas partial dischagre hipot testers,SF6 insulated HV with PD tester


Wire diagram of sf6 pd hipot tester


1 (1)


Sf6 insulated hv with pD tester parameter for 10kvA/100kV


1.Gas testing transformer specifictaion

Model No.: HM-YDQW-10kVA/100kV

Phase :single phase

Frequency:50Hz

Rated capacity:10kVA

Input voltage:0.2kV

Input current:50A

Output voltage:0~100kV

Output current: 0.1A

Waveform deviation factor:≤3%

Measurement winding voltage ratio:1000:1

PC amount: ≤5PC,at rated 60%voltage,≤3PC

2.Manual console specification

Model No.:HMTC-100

Phase:single phase

Frequency:50Hz

Rated capacity:10kVA

Input voltage:0.2kV

Input current:50A

Output voltage:0~200V

Output current:50A

Waveform deviation factor:≤3%

Insulation level: low voltage input terminal to ground power frequency voltage withstand level 5kV/1min

Insulation level:<0.3%

Noise: ≤60dB

PC amount: ≤5PC,at rated 60%voltage,≤3PC

3.Coupling capacitor specification

Mode: HM-TRF-100-0.01

Rated frequency: 50Hz

Capacity: 500PF10%

Rated voltage : 100kV

Divider ratio: 1000:1

Dielectric loss:<0.5%

Precision: 1.5

Partial discharge: ≤5PC,at rated 60%voltage,≤3PC

4.Isolation transformer technical parameter

Mode: HM-GLB-LNF-100

Rated capacity:10kVA

Input voltage:220V

Output voltage:220V

Output current:50A

Rated frequency: 50~60Hz

Number of line:2 line

Quality factor of filter reactor:>70

Partial discharge: ≤5PC,at rated 60%voltage,≤3PC


Different specifications can be customized.


1 (2)

Product Features

1.Filled with high-insulation strength SF6 gas as the insulating medium;

2.Small size, light weight, high-grade craftsmanship, beautiful appearance and convenient handling;

3.Due to the arc extinguishing performance of SF6 gas and its special process structure, its partial discharge is small, and the partial discharge under rated voltage is less than or equal to 3PC;

4.The test process is simple and intuitive, and the operator is cheap;

5.Can effectively eliminate the clutter interference in the power supply;

6.Automatic control technology can be used, with high degree of automation and strong anti-interference ability.

Precautions for use


1. The test personnel should do a good job division of responsibilities and set the safety distance of the test site.

2. Carefully check the grounding conditions of the tested object and the test transformer, and have a dedicated person to monitor safety and observe the status of the tested object .

3. The main parts of the tested object should be clear and clean, and kept absolutely dry, so as not to damage the tested object and cause the error of the test value.

4. For the test of large equipment, the no-load test of the test transformer should generally be carried out first, that is, the test power supply is raised when the test product is not connected, so that the indicating accuracy of the instrument can be checked.

5. During the test, if the following abnormal conditions are found:

The indicator needle of voltage and ammeter swings greatly;

The test object makes an abnormal noise;

Found that the insulation is scorched or smoked,

The voltage should be reduced immediately, the power supply should be cut off, the test should be stopped and the cause should be found out.


After-sale service


1.First-use responsibility system

After the product is delivered, the technician can guide the operation at site if the client requires, and be responsible for the first use of each part

2.One year warranty

All products warranty is 1year, life-time maintenance .

During the warranty period, if any defects or damaged because of product’s quality, maintenance or replacement can be provided with free charge in order to let our client’s satisfied !

3.Troubleshooting

If the troubleshooting is not difficult, and client can handle with it by themselves, we can offer the call-on line guide within 1 hour!

If the troubleshooting is difficult to handle with for client, we can promise that the best solution can be provided within 24 hours!

1 (3)

Similar Product Recommend