-
E-mail
trustar@trustar-pharma.com
- Phone
-
Address
Room 3001, Unit 5, Xinhu Mansion, Binjiang Avenue, Yuhai Street, Ruian, Wenzhou, Zhejiang
Membership
Help
Ruian Trustar Pharma & Packing Equipment Co., Ltd.Free·1YRS
trustar@trustar-pharma.com
Room 3001, Unit 5, Xinhu Mansion, Binjiang Avenue, Yuhai Street, Ruian, Wenzhou, Zhejiang
1.Product Description
Powder Capsule Filling Machine The whole machine supports modular design.conforms to the concept of quick cleaning and replacement of molds, and is equipped with a leading industrial computer operation interface; it also has a fast and convenient modular filling and compacting mechanism; simple and clear cleaning station with brush blowing; The capsule closing mechanism can be adjusted quickly and without dead ends, which is simple and portable without damaging the capsule.



2.Video Introduction
3.Powder Capsule Filling Machine Parameters
| Model | NJP-1200 |
| Working Capacity | 1200 capsules/min |
| Suitable Capsule Size | 000#, 00#, 0L#, 0#, l#, 2#, 3#, 4#, 5# |
| Filling Error | ±2.5% — ±3.5% |
| Noise | <75DB (A) |
| Dust | 20Kpa 210m3/h |
| Vacuum | 48m3/h -0.03~-0.05Mpa |
| No. of Segment Bores | 9 holes |
| Motor Power | 380V/220V 50Hz 5.6kw |
| Machine Dimensions | 870(+339)*940(+339)3K2000mm |
| Machine Weight | 1100kg |
4.Product Features
1.The powder capsule filling machine has fine workmanship and easy operation by the staff
2.Our designer specially integrates the measuring board and the injection seat into one.which improves the accuracy of the filling and prolongs the service life.
3.The powder capsule filling machine can recover the medicines in defective capsules during the filling process and automatically screen the capsules.
4.The fuel rod gong cap is replaced by stainless steel material, which is convenient for cleaning and avoids cracking.



5.Work Flow Chart
The following is the entire production flow chart of capsule production-filling-packaging. According to your needs, professional business personnel will plan and recommend for you

6.Certificate

7.Packaging And Delivery
1.Price terms: FOB China Main Seaport By Sea
2. Payment terms: T/T, 30% by advance payment and 70% before machine delivery
3. Delivery time: 35 working days after receiving the payment and confirming the mold drawing
