Welcome Customer !

Membership

Qingdao Yosion Intelligent Technology Co.,Ltd.
Free Member ·1YRS
QingDao,ShanDong
Manufacturer

Main Products: Laboratory equipments

Xwboo>Products
Product Categories

Qingdao Yosion Intelligent Technology Co.,Ltd.Free·1YRS

  • E-mail

    inquiry@yosionlab.com

  • Phone

    86-532-85166126

  • Address

    No. 4198, Sansha Road, Huangdao District, Qingdao, Shandong, China

Contact Now

Mill Support Spring 0035-0010

Model
Nature of the Manufacturer
Manufacturer
Product Category
Place of Origin
City, Province
Overview
Mill Support Spring 0035-0010 The springs are used to support Mill platform. Check the platform springs for any broken ones and the spigot bushes for any splitting and correct seating of the springs. Replacing Platform Springs Spring Spigot Bushes Follow the steps and refer to the Figure...
Product Details

Mill Support Spring 0035-0010

The springs are used to support Mill platform.

Check the platform springs for any broken ones and the spigot bushes for any splitting and correct seating of the springs.


Replacing Platform Springs & Spring Spigot Bushes

Follow the steps and refer to the Figure below, for replacing the platform springs and/or spring spigot bushes.

 

Note: If any springs need replacement, always replace all six (6) springs with new ones. And if any spring spigot bushes need replacement, always replace all twelve(12) bushes with new ones.

 

Step 1

To replace the springs and bushes, remove the cabinet from the Mill to gain full access to the Mill head assembly.

 

Step 2

Undo the locknuts and grub screws of the bottom universal joint to release the universal shaft from the driven shaft and using appropriate lifting equipment, lift the entire Mill head platform high enough to enable the removal of all the springs and spigot bushes.

 

Step 3

The polyurethane spigot bushes have a slight interference fit and need to be prised off with the aid of a screwdriver or similar tool to remove them.

 

Step 4

Replace the bushes by tapping the new bushes into place with a soft mallet or similar tool.

 

Step 5

Install the new springs onto the new lower bushes first, then lower the Mill head back into position on the springs and re-attach the universal shaft to the driven shaft. Replace the cabinet over the Mill and re-connect all services.


4