Welcome Customer !

Membership

Dongguan Xin Bao Instrument Co., Ltd.
Free Member ·1YRS
DongGuan,GuangDong
Manufacturer

Main Products: Environmental Test Chamber

Xwboo>Products
Product Categories

Dongguan Xin Bao Instrument Co., Ltd.Free·1YRS

  • E-mail

    info@otschina.com.cn

  • Phone

    860769-33365786

  • Address

    Jingshan 3rd industrial area,Chashantown,Dongguan City,Guangdong Province

Contact Now

Rapid Change Rate Temp Chamber

Model
Nature of the Manufacturer
Manufacturer
Product Category
Place of Origin
City, Province
Overview
Rapid Change Rate Temp Chamber
Product Details
Heng3

Introduction:

Rapid Rate Change Temperature Test Chamber is widely applied for quality inspection for all types of electric products, electric appliance, and products from communication, instrument, auto, plastic, metal, food, chemical, building materials, medical and aerospace industries by constant high low temperature change, damp heat etc environment simulation reliability test.

Applications:

  • Battery
  • Vehicles
  • Chemical
  • Aerospace
  • Metal Parts
  • Electronics
  • Car Spare Parts
  • Building Materials
  • Communication Equipment
  • Plastic Rubber Products

Specification:

ModelXB-OTS-80XB-OTS-150XB-OTS-225XB-OTS-408XB-OTS-800XB-OTS-1000
Inner Chamber Size W*H*D(cm)40*50*4050*60*5060*75*5080*85*60100*100*80100*100*100
External Chamber Size W*H*D(cm)62*158*14672*168*15582*183*155100*193*165122*208*185122*208*205
Inner Chamber Volume(L)801502254088001000
Temperature Range-70°C~+150°C(180°C
(A:-20℃ B:-40℃ C:-60°℃ D:-70℃) (Optional)
Humidity Range20%~98%R.H.(10%~98%R.H/ 5%~98%R.H)
Temp Rate of
Change( ºC/Min)
3-20ºC/Min

Features:

1.Has the USB download function, with RS232 interface, the curve of the software, do notneed recorder
2.With vacuum glass observation window, direct observation of the function more effectively
3.The refrigerant servo control valve flow calculation. Save electricity 30%, dormancy in flow time, energy savingmore than 50%
4.Preventing electromagnetic interference by SGS certification controller;At least 32 digital soft path matching with The Times development and software upgrade function
5.Defrost cycle (800 cycle defrost time, defrosting guarantee within 2 hours each time, integration test reach 25% of the energy saving province electricity)