Welcome Customer !

Membership

Shanghai DaDa Electric Co., Ltd.
Free Member ·1YRS
,ShangHai
Manufacturer

Main Products: Circuit Breakers

Xwboo>Products
Product Categories

Shanghai DaDa Electric Co., Ltd.Free·1YRS

  • E-mail

    charlotte.weng@cdada.com

  • Phone

    0086-15167477792

  • Address

    71 Yezhuang Road, Zhuanghang, Fengxian, Shanghai, China

Contact Now

MCB Under Voltage Release

Model
Nature of the Manufacturer
Manufacturer
Product Category
MCCB Accessory
Place of Origin
City, Province
Overview
Under voltage releaseThe rated voltage is 230V and 400V respectively. The release will break the circuit breaker when the actual voltage is between 70%Ue-35%Ue; the release will prevent the circuit breaker from closing when the actual voltage is below 35%Ue; the release will close the circuit breaker when the actual voltage is between 85%Ue-110%Ue.
Product Details

Installation And Use

1. This series of circuit breaker accessories are specially designed for use in conjnction with DAB7 (63 frame) circuit breakers and are not intended to be used alone.

The circuit breaker has the following accessories
Circuit breaker + auxiliary contact;
circuit breaker + auxiliary alarm contact;
circuit breaker +shunt trip;
circuit breaker + shunt trip + auxiliary contact;
circuit breaker + shunt trip + auxiliary alarm contact;
circuit breaker + undervoltage trip.

2. The four accessories are installed on the left side of DAB7-63 miniature circuit breakers, the DAB7-OF, DAB7-FB, DAB7-QY are fixed with screws, the DAB7-FL is fixed to both sides with tape, and at the same time can be installed with the guide rail.

3. The mechanical connection between the circuit breaker and DAB7-, DAB7- FB, DAB7- FL, DAB7-QY transmission shaft should be flexible and compatible with the rest of the equipment.

4. After DAB7-QY circuit breaker has been installed, it can only be closed when press the test button. And installer should shut off the circuit breaker and release the test button immediately, thus ensure the installation safely and correctly. Besides, the rated voltage should pass through the undervoltage trip at same time.

Similar Product Recommend