Insulation piercing multi-core connectors is specially designed for simple and reliable installation while ensuring maximum safety during life line work. Are applicable for high current main line of low voltage aerial bundled conductor (LV ABC) lines to branch without stripping of insulation of main conductor, and could branch four tap lines simultaneously.
1. Product Description
With the rapid economic deve Iopment, in this rapidly changing era, electricity is responsible for the most important energy supply. Therefore, the large disconnection caused by electricity construction brings inconven ience to people's work and life. At the same time, there are many types of power distr ibution wires, which bring inconvenience to the operation of the installer, and cannot be instal led and used efficiently and easi ly. In actual operation, it is also sub ject to the restrictions of terrain conditions and working space.
According to market research, it is found that four-core wires are useful on low-vo Itage Iines. There are many types of such wires, and there are very few piercing clamps that can be matched. Not only that, a four-core wire needs to consume 4 piercing clamps of the same speci fication for cont inuous use. This is a waste of resources and greatly increases the difficulty of construction work. Therefore, the four-core puncture cord clamp is designed to meet these needs.
This product is suitable for voltages of 1kV and below, four-core sector conductor 90° four-core roundconductor.
2. Product Features
1、 Contact performance: the wire clamp has good contact performance with the wire, and the product has little damage to the wire;
2、Electrical conductivity: the product has good electrical conductivity;
3、 Thermal cycle performance: good thermal cycle performance, in line with relevant national standards;
4、Instal lation: easy installation and disassembly, recyclable;
5、The main body is made of high-strength special a luminum al loy, which is anti-corrosion and anti-oxidation.
3. Product structure overview
4. Installation Notes
Analysis of instal lation steps:
steps1: Strip 150mm to 200mm of the cable sheath, and then use a splitter to install the partition into the wire. Figure 1
steps2: Install the product on the wire according to the required wire diameter. Use an Al len wrench to alternately turn the Al len bolts until the product is tightened to stop. As shown in Figure 2
steps3: Strip the end of the branch line to a length of 18mm-25mm, insert it into the branch line hole, and tighten it with an Allen key. As shown in Figure 3
steps4: After instal lation, put the product into the bur ied cable insulation waterproof box. As shown in Figure 4
(Note: The product instal lation is equipped with plastic partitions according to the actual situation, and it is not recommended to install the partitions for large cross-section wires.)