Design and installation of gas circuit in laboratory
Laboratory gas path:
refers to the laboratory gas engineering, namely from the cylinder to the instrument between the terminal connection pipeline, JHP general gas switching device - pressure relief device - valve - line - Filter - Alarm - terminal box - regulating valve etc..
Shanghai Huo Tong Experimental Instrument Co. Ltd. according to customer needs and laboratory site conditions, to provide you with laboratory gas, laboratory gas valves, gas installation, laboratory laboratory road engineering, laboratory gas path design, laboratory gas, gas road road reconstruction engineering, pneumatic systems, our company has long been engaged in the design, construction and maintenance laboratory gas path, we according to customer needs and laboratory condition, provide systematic solution for you, quality products, and provide a variety of security protection system, the gas path system comprises a centralized gas supply system and indoor laboratory gas supply system, you can meet the requirements of the different grades of gas safety.
At present, the main gas path arrangement is mainly laboratory centralized gas supply system
Laboratory gas applications:
Gas path system is mainly used in the treatment of high purity gas, or toxic gas and corrosive gas control equipment, is the real gas path system for the laboratory. Mainly used in: laboratory, electronics, petrochemical, solar power plant, nuclear power, analytical instruments, bio pharmaceutical, Quality Supervision Bureau, the school scientific research, atomic absorption spectrometry, gas analysis, food packaging, offshore industry, industrial / medical laser industry and other high-tech fields.
General requirements of laboratory central gas supply system:
-The central gas supply mode used in laboratory gas is imported by the special gas supply area outside the laboratory. In addition to the direct generation of clean air from the air compression system, the remaining gases are supplied by high-pressure cylinders.
-Each gas shall have a main supply and a standby gas supply bottle, and an automatic switch panel shall be installed to control the air supply to ensure uninterrupted air supply. In addition, the main control valve and relief valve should be installed outside the laboratory.
- laboratory gas is made of stainless steel (BA) road transport, generally 1.5 meters and have a bracket fixed on the wall. All piping in the laboratory is installed below the ceiling, and is laid out along the wall. All lines indicate gas to be connected. The gas line shall be clearly marked at intervals of 1.5 meters, indicating the direction of the flow of gas.
-All pressure reducers need to be connected to an exhaust line that passes through the gas storage area. Flammable and oxidizing gas exhaust lines must not be joined together.
-All design and construction must comply with the relevant regulations and requirements, such as: "science laboratory building design code" JGJ 91-93; "hydrogen" technical specification for safety -GB 4962-1985; "field equipment, industrial pipe welding engineering specification for construction and acceptance of" -GB50236-1998.
Gas piping requirements:
All gas lines are made of high quality, fully annealed, seamless stainless steel tubes (class BA). Copper tubes are used only at the ends of the gas lines, where the purity of the gas is not too strict. (such as a fume hood).
Gas pipelines shall not be laid with cables or conductive lines.
Flammable gases, such as acetylene, need to be separately introduced from other gases. If the hydrogen pipe is parallel with other flammable gas pipelines, the spacing shall not be less than 0.5M, and the cross laying time shall not be less than 0.25M. The hydrogen piping shall be located above the layer during laying.
Compressed air has a purification device for filtering impurities and moisture on the pipe. The purifier needs to be connected in parallel and separated by separate valves to facilitate the maintenance of the filter.
• the connection of high purity gas pipeline is seamless welding. Joint fittings are only available when connecting to valve or adjusting device.
Each laboratory shall have separate control valves, relief valves and pressure gauges.
The gas line to the work station shall be provided with a separate control valve. A control valve for uniformly discharging various gases is arranged on the worktable. A gas cleaning device is recommended in front of the helium line.
Every 1.5 meters or so, the gas pipeline needs a support. In addition, according to the radius of the bend of the gas pipeline, the proper position of the bracket is set. All bends must be supported. All the supports in the gas line shall be galvanized and protected.
Other requirements:
- stainless steel pipe fittings in the on-site installation shall be unsealed, after unsealing were higher for 5N pure gas purge to access system. After the installation of the whole system, 5N high purity nitrogen should be used for large flow purging to ensure the cleanliness of the whole system.
After the installation of the gas supply system, relevant strength tests, sealing tests and stability tests shall be carried out as required.
The laboratory "gas engineering" is a complex and rigorous system engineering, which requires professional engineering companies to participate in the overall design plan.