FKWJ-3 Underground Mining Scoop is mainly used in underground mines,
Main Features
(1) Main parts are imported top brand, like Deutz Engine, DANA torque converter, transmission, axle Parker pump and valves etc.;
(2) Tailor made size and optional parts for customers to choose: remote control, Centralized lubrication system, Closed Cabin with air conditioner, ejector bucket etc.
Related Videos
Main Configuration
Diesel Engine
Brand: DEUTZ
Model: F8L413FW
Type: Air cooling
Rated Power: 136KW/2300rpm
Torque
Converter
Brand: DANA
Model: C270
Shift Transmission
Brand: DANA
Model: R32000
Axle
Brand: DANA
Model: 16D
Hydraulic pump
Parker
Rexroth
DANA
Hydraulic valve
Parker
Wabco
Mico
WILLIAMS
Bucket
Material: Manganese steel
Ejector Bucket: Optional
Driver cabin
Side-seat layout: YES
Closed Cabin: Optional
Air conditioner: Optional
Technical Parameters
Rated capacity
6000kg
Bucket volume
3 m3 (4 yd)
Weight
19740 kg
25740 kg (Load weight)
Min. Ground clearance
280mm
Length
8650mm
Departure angle
15°
Width
2120mm
Steering angle
left/ right 40°
Height
2170mm
Rear axle swing
±10°
Traveling performance
4.2-20 km/h
Gradeability
25% (load)
Deliver, Shipping And Serving
Product Qualification
All Underground Mining Scoop We Supply
FAQ
(1) Are you factory or trade company?
We are manufacturer, we also supply trade service.
(2) Will you provide some wearing parts of the machines?
Yes, of course. We ship them with machine, spare parts in wood case.
(3) How is the quality of your products?
We have been approved of ISO, CE and always produce our products strictly according to national and intertnational standards. We do strict inspection in every production stage, all the machines we sell are under warranty.
(4) What about your price?
We always supply our products with low price, because we believe this is the way to build long-term business and earn good reputation.
(5) What payments term do you accept?
We accept L/C,T/T and other ways, T/T goes with 30% advanced payment after signing contract or order confirmation.
(6) What about the order lead time?
We have two factories and big productivity, the order lead time is only 15-30 days.