(1) It is mainly used to drill blast holes for tunneling constructions in mining, metallurgy, water and electricity, railway, highway engineering;
(2) Use all hydraulic drive, with high efficiency and speed which can be 0.8-2.5 m/min.
(3) It has advanced hydraulically controlled drilling system, which is safe and simple to operate, incorporates the auto stop and anti-jamming function, auto-stop at end-point, auto wash.
(4) This jumbo has a small body, runs with the wheels, can reach a speed of 20km/h Working with electric motor can improve the working environment, reduces noise, dust and energy consumption.
Configuration And Technical Parameters
Item
Parameter
Body
Overall size (L×W×H)
8240×1290×2450 mm
Hole diameter
Φ33 ~Φ102 mm
Drill pipe length
3050 mm
Hole depth
2.7 m
Drilling speed
0.8~2 m/min
Section (W×H)
2.5×2.5~5.5×4.5 m
Climbing capability (smooth-riding surface)
25%
Total weight
≈8500 kg
Walking aids
Engine power
30 KW
Running speed
2.5 km/h
Min. turning radius
4.5 m
Boom
Up and down
up55°, down16°
Swing boom
inner14°, outer47°
Compensation
1500 mm
Rotation
positive180°, negative180°
Thruster
Pitching
down105°, up15°
Swing angle
inner45°, outer45°
Total length
4150 mm
Distance
2700 mm
Max. Propulsion
9000 N
Impacting oil pressure
30~45 L/min
Impacting flow
14~16 Mpa
Torque
60~260 N·m
Impacting energy
100~200 J
Impacting frequency
34~67 Hz
Hydraulic system
Impacting loop pressure
16Mpa
Drill pipe rotation loop pressure
15Mpa
Compensation loop pressure
10Mpa
Boom loop pressure
20Mpa
Propulsion loop pressure
11Mpa
Leg extension loop pressure
21Mpa
Running loop pressure
20Mpa
Air system
Drop tank air pressure
0.03 Mpa
Blowing hole air pressure
0.7 Mpa
Rock drill air pressure
0.4 Mpa
Water system
Rock drill water pressure
(≥) 1.2Mpa
Colder water pressure
(≤) 0.6Mpa
Electric system
Supply voltage
380 V
Electric motor rotation speed
1470 r/min
Main Features
Product Qualification
Other Underground Mining Machines We Supply
Latest News - FOCOR Skillfully Applied new jumbo to Make Tunneling Easily Drive Anchor Rods
The customers of our company consider the actual cost of mining environment and plan to purchase a tunneling jumbo with double purposes to fulfill the double tasks of excavation and anchoring rod in metal mines. The customers failed to acquire satisfactory solutions after consulting several manufacturers, and they eventually consulted FOCOR! With the strong technical strength we have accumulated for many years, we helped customers to skillfully solve the problem of "double purpose" in small-section underground mines by applying the double-layer boosters on the excavating jumbo, thus not only carrying out highly-efficient excavation and saving a lot of manpower, materials and time, but also driving anchor rods firmly and safely. What a low-cost and highly-efficient combination!
The advantage of creative double-layer boosters: the boosting beam has an upper level and a lower level, and is extendable; therefore, the drilling depth can be adjusted, and a deeper hole can be drilled at the time of excavation. When anchor rods are driven, the boosting bean can be retracted, and the length of the boosting bean can be reduced. A shorter boosting bean can rotate in the lane. The adjusting means is oil cylinder and mechanic stop-motion mechanism (safe and reliable).
According to the previous mining process, customers need to additionally purchase an anchor rod jumbo to carry out anchor-rod operation. The unique design of our double-layer booster excavating jumbo can complete the work of two machine units, thus saving a lot of cost for customers. Customers sign a high praise for the technical strength of our company.