(1) It is mainly used to drill blast holes for tunneling constructions in mining, metallurgy, water and electricity, railway, highway engineering;
(2) It has advanced hydraulically controlled drilling system, which is safe and simple to operate, incorporates the auto stop and anti-jamming function, auto-stop at end-point, auto wash.
(3) This jumbo has a small body, runs with the wheels, can reach a speed of 20km/h Working with electric motor can improve the working environment, reduces noise, dust and energy consumption.
(4) The jumbo can not only drill blast hole, according to the the basis of section, it also can drill bolt hole conveniently with our patent impeller.
Configuration And Technical Parameters
Item
Parameter
Body
Overall size (L×W×H)
8300×1350×2650 mm
Hole diameter
φ33~φ102
Drill pipe length
3050 mm
Hole depth
2.7 m
Drilling speed
0.8~2 m/min
Section (W×H)
2×2~3.5×3.5 m
Climbing capability
14%
Total weight
≈7000 kg
Bottom
Min. turning radius
2500 m
Running speed
≤20 km/h
Climbing capability
8°
Joint
inner35°, outer35°
Up and down
up55°, down16°
Rotation angle
positive180°, negative180°
Pitching
down105°, up15°
Compensation
1500 mm
Thruster
Pitching
down105°, up15°
Swing angle
inner45°, outer45°
Total length
4150 mm
Hole depth
2700 mm
Max. Propulsion
9000 N
Impact oil pressure
14~16 MPa
Impact flow
30~45 L/min
Torque
60~260 N·m
Impact energy
100~200 J
Impact frequency
34~67 Hz
Rotating speed
200~400 r/min
Hydraulic system
Impacting loop pressure
16 MPa
Drill pipe rotation loop pressure
15 MPa
Compensation loop pressure
10 MPa
Boom loop pressure
20 MPa
Propulsion loop pressure
16 MPa
Leg extension loop pressure
21 MPa
Running loop pressure
20 MPa
Air system
Tank air pressure
0.03 MPa
Rock drill air pressure
0.4 MPa
Water system
Rock drill water pressure
(≥)1.2 MPa
Colder water pressure
(≤)0.6 MPa
Electric system
Installed power
42.5 KW
Supply voltage
380 V
Electric motor rotation speed
1470 r/min
Main Features
Product Qualification
Other Underground Mining Machines We Supply
Latest News - Attentions of Single boom jumbo for underground mining
1. Receive instruction and the machine certificate when buying the jumbo.
2. The driver must read the instructions carefully before operation, then operation, adjustment and maintenance as request.
3. The hydraulic system of the machine is not allowed to adjust the pressure at will.
4. The warranty period of the walking chassis is three months from the date of purchase, warranty for quality problems due to manufacturing. No product certification, warranty card, electrical parts, wearing parts and failure caused by improper used is not within the scope of the warranty.
5. If the jumbo has a mechanical failure, users should inform our company the model, factory number and purchase date.
Important Note
6. In any case, the fuel tank should not be injected into the fuel without filtration, which will cause injector needle wearing and blocking.
7. New jumbo must start normal working after running-in as required.
3. High speed is strictly prohibited when turning or running on the slope.
4. Forbid to travel on a ramp greater than 14°
5. Turning must be on the horizontal ground.
6. The drilling boom should be put on transport station and as low as possible.
7. When passing slope, the drilling boon cannot be swung to one side when passing slope, and no turning. When the slope greater than 5°, the jumbo cannot pass.
8. Strictly forbid more than 1800rmin, it will injure the jumbo!
9. Maintenance or adjustment is strictly prohibited when the jumbo is working.
10. Do not use non-label fuel oil, gear oil or hydraulic oil. Hydraulic oil, engine gear oil, diesel filter element, oil filter element and air filter element must be replaced after the new jumbo working 80-120h.
Precautions
The diesel engine must be used in well ventilated mine and tunnel, to prevent poisonous gases from causing damage to our bodies.