FK10-1BCDL jumbo boomer is mainly used to drill blast holes for tunneling constructions in mining, metallurgy, water and electricity, railway, highway engineering, etc. This series use all hydraulic drive, with high efficiency and speed which can be 0.8-2.5 m/min. The advanced hydraulically controlled drilling system, which is safe and simple to operate, incorporates the auto stop and anti-jamming function, auto-stop at end-point, auto wash. This jumbo has a small body, runs with the wheels, can reach a speed of 20km/h Working with electric motor can improve the working environment a lot, reduces noise, dust and energy consumption. The flexible hydraulic rock drill can work on the section, roof, side and floor. The jumbo can not only drill blast hole,according to the the basis of section, it also can drill bolt hole conveniently with our patent impeller.
Configuration And Technical Parameters
Item
Parameter
Body
Overall size (L×W×H)
8300×1350×2650 mm
Hole diameter
φ33~φ102
Drill pipe length
3050 mm
Hole depth
2.7 m
Drilling speed
0.8~2 m/min
Section (W×H)
2×2~3.5×3.5 m
Climbing capability
14%
Total weight
≈7000 kg
Bottom
Min. turning radius
2500 m
Running speed
≤20 km/h
Climbing capability
8°
Joint
inner35°, outer35°
Up and down
up55°, down16°
Rotation angle
positive180°, negative180°
Pitching
down105°, up15°
Compensation
1500 mm
Thruster
Pitching
down105°, up15°
Swing angle
inner45°, outer45°
Total length
4150 mm
Hole depth
2700 mm
Max. Propulsion
9000 N
Impact oil pressure
14~16 MPa
Impact flow
30~45 L/min
Torque
60~260 N·m
Impact energy
100~200 J
Impact frequency
34~67 Hz
Rotating speed
200~400 r/min
Hydraulic system
Impacting loop pressure
16 MPa
Drill pipe rotation loop pressure
15 MPa
Compensation loop pressure
10 MPa
Boom loop pressure
20 MPa
Propulsion loop pressure
16 MPa
Leg extension loop pressure
21 MPa
Running loop pressure
20 MPa
Air system
Tank air pressure
0.03 MPa
Rock drill air pressure
0.4 MPa
Water system
Rock drill water pressure
(≥)1.2 MPa
Colder water pressure
(≤)0.6 MPa
Electric system
Installed power
42.5 KW
Supply voltage
380 V
Electric motor rotation speed
1470 r/min
Main Features
Product Qualification
Other Underground Mining Machines We Supply
Latest News - Preparation work before start the jumbo
6.2
6.2.1 Whether tightening of various soft pipes, operating handle, electric cable, water tube, connector, crawler, drill rod, drill head bit, screw bolt, screw nut, Whether any blocking, impact and miscellaneous articles of various running position.
6.2.2 Check various parts before start the jumbo
6.2.2.1 Oil level of oil tank (observe oil level line of the oil tank), Oil level of glass cup of the lubrication oil atomizer of the rock drill.
6.2.2.2 Oil level of engine oil (observe oil level line of the oil tank), and the level of engine water tank cannot be lower than the overflow opening.
6.2.2.3 The operation handle is at “0”position.
6.2.2.4 Whether loosing of screw bolt and nut, especially, the fastening bolt of the rock drill jumbo and the screw bolt on the guide body of the drill bit holding device should be fastened.
6.2.2.5 Whether rational of degree of tensioning of steel wire rope of the thruster and travel crawler.
6.2.2.6 Whether clean and normal of component of drive sprocket wheel of travel crawler, slide rail of directive wheel, caterpillar joint, buffer tension spring.
6.2.2.7 Supply power and check whether normal lighting of front and rear truck light.
6.2.2.8 Confirm that the hand throttle is in idle position, start the engine, see if the parameters are normal, rotate the hand throttle slowly, control the engine speed at about 1500rmin (strictly forbid more than 1800rmin, it will injure the jumbo!).
6.2.2.9 Check all pressure gauges.
6.2.2.10 Open water supply switch and observe whether normal of water supply pump, the water pressure is 0.8~1.5MPa and smooth water supply of drill rod and drill bit.
6.2.2.11 Check whether normal of actions of various oil cylinders, whether any blocking occurs.
6.2.2.12 Before operate various actions first support the leg, operate actions after the machine in stable condition.
6.3 Lubricate various running positions of the drilling jumbo
6.3.1 Molybdenum disulphide grease is applied on shank of drilling jumbo, spline impact connection and connection sleeve and drill rod connection.
6.3.2 Molybdenum disulphide grease is applied on slide plate and guide rail of drilling jumbo, soft pipe roller and pallet.
6.3.3 Fully filling lubricating oil to various positions following requirement in instruction manual of drilling jumbo.
Running mechanism of right and left crawler belt are completely two independent structures. The crawler belt running mechanism is composed of crawler belt component and running ground drive mechanism.
The crawler belt parts are composed by crawler belt 10, crawler belt tensioning device 8,thrust wheel 9, guide.
11. Driving parts are composed by a hydraulic brake, a walking motor 5 and driving wheel 6, all of them are fixed on the crawler belt frame 7. The left and right crawler belt frames are welded on the left and right side of the carriage.
The principle of running of crawler belt of the machine is as follows:
The running of machine crawler belt is driven by the ground drive mechanism. When the hydraulic system supplies oil to the ground drive mechanism, the ground drive mechanism provide power to the traction wheel and drive the crawler belt and advance, retreat and turn of the drill jumbo. When the hydraulic system not supplies oil to the ground drive mechanism, the ground drive mechanism lost pressure and stopped.
The degree of loose or tightening of crawler belt is adjusted by the take‐up oil cylinder and, the grease is injected into the nozzle tip by high pressure oil gun. The weight of the jumbo machine is supported by 5 thrust wheels under the crawler belt frame. To prevent loose of crawler belt, chain supporting plate and side guard plate constitute the walking shield, fixed above the hydraulic motor.