Main features of FK10-1BCDL jumbo mining equipment :
(1) It is mainly used to drill blast holes for tunneling constructions in mining, metallurgy, water and electricity, railway, highway engineering;
(2) It has advanced hydraulically controlled drilling system, which is safe and simple to operate, incorporates the auto stop and anti-jamming function, auto-stop at end-point, auto wash.
(3) This jumbo has a small body, runs with the wheels, can reach a speed of 20km/h Working with electric motor can improve the working environment, reduces noise, dust and energy consumption.
(4) The jumbo can not only drill blast hole,according to the the basis of section, it also can drill bolt hole conveniently with our patent impeller.
Configuration And Technical Parameters
Item
Parameter
Body
Overall size (L×W×H)
8300×1350×2650 mm
Hole diameter
φ33~φ102
Drill pipe length
3050 mm
Hole depth
2.7 m
Drilling speed
0.8~2 m/min
Section (W×H)
2×2~3.5×3.5 m
Climbing capability
14%
Total weight
≈7000 kg
Bottom
Min. turning radius
2500 m
Running speed
≤20 km/h
Climbing capability
8°
Joint
inner35°, outer35°
Up and down
up55°, down16°
Rotation angle
positive180°, negative180°
Pitching
down105°, up15°
Compensation
1500 mm
Thruster
Pitching
down105°, up15°
Swing angle
inner45°, outer45°
Total length
4150 mm
Hole depth
2700 mm
Max. Propulsion
9000 N
Impact oil pressure
14~16 MPa
Impact flow
30~45 L/min
Torque
60~260 N·m
Impact energy
100~200 J
Impact frequency
34~67 Hz
Rotating speed
200~400 r/min
Hydraulic system
Impacting loop pressure
16 MPa
Drill pipe rotation loop pressure
15 MPa
Compensation loop pressure
10 MPa
Boom loop pressure
20 MPa
Propulsion loop pressure
16 MPa
Leg extension loop pressure
21 MPa
Running loop pressure
20 MPa
Air system
Tank air pressure
0.03 MPa
Rock drill air pressure
0.4 MPa
Water system
Rock drill water pressure
(≥)1.2 MPa
Colder water pressure
(≤)0.6 MPa
Electric system
Installed power
42.5 KW
Supply voltage
380 V
Electric motor rotation speed
1470 r/min
Main Features
Product Qualification
Other Underground Mining Machines We Supply
Latest News - Safety warning
7.1 The driver of the drilling jumbo should has received professional training and gained qualification and operation should be carried out by designated person.
7.2 Signal should be issued before start the machine, the machine can be started only after ensured that no person in the danger area surrounding the machine.
7.3 When the machine is forward or retreat, safety of people surround the machine and the driver himself should be guaranteed, at the same time, take care and prevent crashing electric cable.
7.4 During operation or when power on of the machine, person staying in front of the machine or within the range of the moving of the drill boom is strictly prohibited.
7.5 When change operation position of the drill truck, it should draw everybody’s attention to safety within the working area in advance.
7.6 Before start the machine, it should ensure that all tubes and pipelines are tightly connected without seepage and leakage and, all handles are at original position.
7.7 Turning must be on the horizontal ground.
7.8 When working of the machine, seepage or leakage of hydraulic system should not occur, otherwise, immediately stop the machine, conduct checking or change the damaged part and burry the leaked oil in time.
7.8 The drilling device has to be put back in place after stretching and passing through the narrow passage.
7.9 It should guarantee reliable action of various safety valves and not exceed the pressure stipulated in the instruction manual, willfully regulating pressure of various pressure regulating valves on the machine is strictly forbidden.
7.10 It should guarantee that when the machine is walking, the drill boom and thruster should retreat and parallel to the axis of the machine, retreat the supporting leg to prevent side falling. When the machine is walking, designated person should pay attention to electric cable, air pipe and water pipeline to prevent damaging.
7.11 When passing slope, the drilling boon cannot be swung to one side when passing slope, and no turning. When the slope greater than 5°, the jumbo cannot pass.
7.12 Before operate drill boom, it should guarantee to tightly set the supporting leg, and in addition, it should not change the leg state during whole rock drilling.
7.13 During drilling, it should pay special attention to surrounding person and environment, operating of boom should not hurt person.
7.14 When start drilling, first open drill hole by rotation, after the drill bit fully enters into the rock and ensure there is no longer of skew, then push the gradually drilling valve handle to the end and enters into normal drilling operation.
7.15 When drill rod is blocking, retreat drill rod by retreating the machine is strictly prohibited.
7.16 Ensure sufficient lubricating oil is in the oil atomizer, drilling is not permitted when oil mist not come out.
7.17 Touching rotating drill rod by hand is strictly prohibited.
7.18 When drilling is completed, it should recover the drill boom and thruster to the position parallel to machine axis, recover the supporting leg and put the machine to rational place, prevent damaging of the machine, especially prevent cracking piston of oil cylinder.
7.19 Once emergency occurs, it should immediately cut off electric power source.
7.20 Before cut off electric power source, driver should not arbitrarily leave the machine.
7.21 When the machine stop working, it should cut off the disconnecting switch
7.22 During checking and repair operation, it should prevent danger of false operation of the machine.
7.23 Failure braking is adopted for the machine, normally-closed type hydraulic braking mechanism is adopted, for this reason, moving is strictly prohibited before open the brake and traction moving is also not permitted.
7.24 Do not willfully dismantle high pressure oil pipeline and bi-direction hydraulic lock to prevent hurt person due to failure of mechanism out of control or pressure oil blowout.
7.25 If need to change rubber pipe or hydraulic element, please find good place and conduct dismantle after fixed the related mechanism, and it should also pay attention to internal clearness of hydraulic system.
7.26 The accumulator should be tightly and reliably connected and, filling work can only be implemented by designated person. Only nitrogen can be filled and, filling of other combustible gas is strictly forbidden, otherwise, it can explode.
7.27 Mineral oil should be selected according to the requirement in the instruction manual, and conduct lubri cation and maintenance on time.
7.28 Electric power source should be first gut off during maintenance of the machine, prevent water and other liquids enter into the switch box to ensure that electrical equipment is not affected with damp.
7.29 In the whole working procedure, the surface temperature of the drill truck should not exceed 75℃.
7.30 When lifting out of underground mine or store on ground for long time, it should completely drain water from the water system to prevent frozen and damaging of cooler, water pump or pipeline. If oil temperature is lower than 10℃, it should increase oil temperature.
7.31 Check the oil level of oil tank, ensure it between the highest and lowest marks.
7.32 Confirm that the hand throttle is in idle position, start the engine, see if the parameters are normal, rotate the hand throttle clockwise slowly, control the engine speed at about 1500rmin.
7.33 Strictly forbid more than 1800rmin, it will injure the jumbo!
7.34 Turning must be on the horizontal ground, high-speed turning is strictly prohibited.
7.35 High-speed running is strictly prohibited when on slopes, and it cannot running on the ramp of more than 25%.
7.36 The drilling boom should be put on transport station and as low as possible.
7.37 Maintenance or adjustment is strictly prohibited when the jumbo is working. The diesel engine must be used in well ventilated mine and tunnel, to prevent poisonous gases from causing damage to our bodies.