Install the hydraulic control on the front hanger roller by using the pan head screw(M5x16) attached.Install it with the door more than half open.(Avoid the locations of the control rack and rear side brake .
Adjust the needle valve of the hydraulic control using a flat-blade screwdriver.Adjustment can be conducted at about 250 mm from the front where the door closes.Adjust the needle valve so that the door closes with an appropriate speed from the fully opened position.Open and close the door a few times to check control of speed
Loosen screw of glass clamp and hanger ,put the slider into glass clamp Embedding glass in glass clampFasten the screw, make sure the glass won't come outslider22Installation of glass doorAdjustment of speed
Fix the hanger directly with fix plate by screwfasten it and make sure the wooden door leaf is well fixed
Cutting
Standard length of track:2.1m*2, over-length track can be customized.The track is installed at the height of DH+23mm from the ground(based on the bottom of the track).
Installation
(1)drill holes in aluminum track.(2)Fix one end of aluminum track , check the level by gradienter, the fix another end of track.(3)Fix the track on to the wall or steel structure firmly.(4)Then check the level again,then fix the aluminum track to steel structure or wall firmly.Caution:Cut the track at the this length L=W=10mm,inside doorpost dimensions is W.
FAQ
1.
Do you support OEM?
Answer:Yes,we support OEM,customer can print on their logo in goods and packing carton;But OEM will requires order quantity;
2.How to become your agency?
Answer:For some models,if we have sole agency in one country,we will not sell to others;If without sole agency,
we support OEM with customer own logo for selling;Also,we support customer selling the product under our own brand DOOREN;