Place of Origin: Shandong ChinaBrand Name: CH MachineryModel Number : SLG-65,SLG-70,SLG-85Output: 100-150kg/hour,200-240kg/h,300-400kg/hVoltage: Make based on customers’ factory voltageDimension(L*W*H):20*1.5*2.2m Certification: CE, ISO9001Warranty: 1year After-salesService Provided: Field installation, commissioning and training Layout: Auto CAD format according to client's workshop
Product Details
Jinan FLD company dog food machine are equipped with the latest process technology, the core of which is the extrusion system with the extruder and the process control system. In the production process, the raw materials undergo the process steps of weighing, fine grinding, mixing, extrusion, drying, vacuum coating, cooling and packaging.
Dog Food Production Machine Flow chart:
Mixing system---Extrusion system----Drying system----Flavoring system--Packing system
Products of Dog Food Production Machine:
Different shapes are made by adjusting the dies from extruder,You can use this Dog food making machine to produce different size pellet by change the extruder dies easily.
Dog Food Production Machine Parameter:
Name
full production line Dog Food Production Machine
Material
Stainless steel
Whole line Size:
About 30.0*10.0*15.0m (Free workshop design drawing)
weight:
4000-5000kg
working Power
380v 50HZ three phase (Customized)
Packing way
Woodcase or plastic film
Payment
T/T or L/C at sight
Shipment date
in about 25-30 days
Company Information
JINAN Jinan FLD EXTRUSION MACHINERY Co., Ltd is an industry and trade integrated enterprise.
FAQ
Q: Are you a trade company or a manufacturer? A: we are a manufacturer, welcome to visit our factory and check the machines.
Q: How long is your delivery time? A: Generally it is 5-10 days if the goods are in stock. or it is 20-35 days if the goods are not in stock, we could discuss before contract.
Q: Could you supply all the parameters about the machines? A: Yes, we will supply all the parameters, price, layout drawing, factory design etc.
Q: What is your terms of payment? A: 30% T/T in advance, 70% balance before shipment after inspection.
Q: How about the after-service? A: We will send 1 engineer to the buyer's factory for 7-14 days period installation and training to the operators.
Q: Do you supply any formula to buyer? A: Yes, we supply formulas to buyer.