Welcome Customer !

Membership

Jinan Bright Machinery Co., Ltd.
Free Member ·1YRS
,
Other

Main Products: 食品挤出机械

Xwboo>Products

Jinan Bright Machinery Co., Ltd.Free·1YRS

  • E-mail

    info@brtbrightmachine.com

  • Phone

  • Address

    Wande Industrial Park, Changqing District, Jinan City , Shandong Province, China

Contact Now

Wholesale Doritos Corn Flakes Manufacturing Machine Company

Model
Nature of the Manufacturer
Other
Product Category
Fried Food Production Line
Place of Origin
City, Province
Overview
Wholesale Doritos Corn Flakes Manufacturing Machine Company
Product Details
1.Product Description

Wholesale Doritos Nacho Corn Chips Making Machine

Doritos,Tortilla,Nachos, Corn chips‘ main raw material are using corn powder, the mixture is heated under pressure, and then extruded through a die, then use the shaper to make it, the texture of the snack is formed as a result of contact with hot air, causing steam in the mixture to expand and creating its characteristic texture. After frying, the product is then tumbled with the desired flavor components.

Flow chart :

grinding→mixing→extruding→cutting→frying→flavoring→cooling→packaging

Doritos corn flakes manufacturing machine

Flow chart diagram:

Our engineer could design the layout drawing according to your dimension of the factory for the fish feed machines

Machine parameters:

ModleInstalled Power(kw)Power Consumption(kw)

Output

(kg/h)

Dimension(m)
65 Processing Line4530150~20018x4.5x3.4
75 Processing Line8050250~35026x5x3.5

Sample of snack food :

Doritos corn flakes manufacturing machine company

2.FAQ

Q: Are you a trade company or a manufacturer?
A: we are a manufacturer, welcome to visit and check the machine to my factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 20-35 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: 30% T/T in advance ,balance before shippment.
Q: How about the after-service?
A: We will send 1 engineer to the buyer's factory for a 10-day period installation and training to the operators.
Q:do you supply any formula to buyer?
A:yes, we supply formula to buyer,


Similar Product Recommend