Welcome Customer !

Membership

Zhangjiagang King Machine Co., Ltd.
Free Member ·1YRS
,
Other

Main Products: 饮料灌装设备

Xwboo>Products
Product Categories

Zhangjiagang King Machine Co., Ltd.Free·1YRS

  • E-mail

    edison@king-machine.com

  • Phone

  • Address

    NO.32 East Seven Road Donglai Town, Zhangjiagang City, Jiangsu Province, China

Contact Now

Drop Type Carton Packing Machine

Model
Nature of the Manufacturer
Other
Product Category
Drop Type Carton Packing Machine
Place of Origin
City, Province
Overview
Drop Type Carton Packing Machine
Product Details

(1)Mechanical parts made of chrome plated steel, stainless steel, and the anti-corrosion aluminum.

(2)The main drive with adjustable speed reducer, stepless speed regulation, automatic correction function.

(3)The bottle feeding conveyer belt is made of high molecular material chain plate low coefficient of friction, continuous bottle feed, Lane guidance.

(4)For the product position and automatic speed regulation into the bottle detection.

(5)Inverted bottle, bottle feeding at the lack of detection, alarm for shortage of box.

(6)the main electric cabinet is on the machine.

(7)Airtac pneumatic components

(8 )Autonics  photoelectric control system

 ( 9 ) the process controller based on PLC Siemens with console, and color LCD touch screen component, directly modify machine parameters;

Overall size(L/W/H) 3650*1000*1910(mm)
Capacity 10-15packages/min
Power 5KW
Voltage AC3-380V/50HZ+G+E
Working temperature -10℃~40℃
Auxiliary power supply  24VDC
Air pressure 0.4~0.6Mpa
Air comsumption 1500L/Min
Weight 600KG

Main components:

PLC & touch screen Siemens
Contactor & relays Schneider
Frequency Siemens
Gear motor Taiwan
Bearing TR
Chain Plastic
Production line set multiple fault protection and alarm and fault alarm device. All the fault alarm with content in touch screen highlights, prompted the need to solve the main content and measures.

Q:How about the spare parts?
A:We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we will supply the spare parts with our cost including the delivery fees.
          
Q:How long time for installation?
A:According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.
          
Q:How to install my machines when it arrives?how much the cost?
A:We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation and USD80/day/person.
          
Q:When can I get my machine after I paid?
A:Normally production time is around 30-60days,the exactly depend on what kind of machine you order.The shipping time is based on your destination port.
          
Q:What’s your guarantee or the warranty of the quality if we buy your machines?
A:We offer you high quality machines with 1 year guarantee and supply life-long technical support.
          
Q:Are you a trading company or a manufacturer?
A:We are an Original Equipment Manufacturer so that we can provide you high quality machines in raeasonable price, Welcome to visit us.

Similar Product Recommend