Welcome Customer !

Membership

Zhangjiagang King Machine Co., Ltd.
Free Member ·1YRS
,
Other

Main Products: 饮料灌装设备

Xwboo>Products
Product Categories

Zhangjiagang King Machine Co., Ltd.Free·1YRS

  • E-mail

    edison@king-machine.com

  • Phone

  • Address

    NO.32 East Seven Road Donglai Town, Zhangjiagang City, Jiangsu Province, China

Contact Now

Aseptic Juice Drinking Bottling Machine 5000BPH RCGF 18-18-6

Model
Nature of the Manufacturer
Other
Product Category
Juice Filling Machine
Place of Origin
City, Province
Overview
Aseptic Juice Drinking Bottling Machine 5000BPH RCGF 18-18-6
Product Details


1). Aseptic juice drinking bottling machine 5000bph rcgf 18-18-6  uses the wind sent access and move wheel in the bottle directly connected technology; canceled screw and conveyor chains, this enable the change the bottle-shaped become easier. 

2). Bottles transmission adopt clip bottleneck technology, bottle-shaped transform not need to adjust the equipment level, only change related the curved plate, wheel and nylon parts is enough.. 

3). The specially designed stainless steel bottle washing machine clip is solid and durable, no touch with the screw location of bottle mouth to avoid secondary pollution. 

4). High-speed large gravity flow valve filling valve, filling fast, filling accurate and no liquid lose. 

5). Spiraling decline when output bottle, transform bottle shape no need to adjust the height of conveyor chains. 

6). Host adopt advanced PLC automatic control technology, the key electrical components from famous company such as Japan/'s Mitsubishi, France Schneider, Siemens.


Containers and specifications

Project Name: Full Automatic Complete Juice 2000-20000bph Production Line

Hot Filling Fruit Juice 

Material

Shape

Filling volume

Filling level(mm)

Neck type

PET Bottle

Square or Round Bottle 

100-2000ml 

Distance from bottle neck 

According request

As request

Adjustable specifications of the bottle type

【Middle Mould Base】Bottle diameter ≤105mm Bottle Height≤335mm

Customers need to buy additional change-over parts for the different bottles.
If using square bottles, then bottle separating system will be added.

Juice Preparation

Fruit , Concentrate, Powder mixing .....

Container Label & Control Mode

Packaging system

Palletizing system

 

Hot Melt Roll-Fed

PVC Shrink Label

Full Label/ Half Label 

Manual / Automatic

Packing system

Min, Spec.

Manual 

Low position gantry palletizer

Robot Palletizer

High position gantry palletizer

Single Arm Palletizer 

Manual Palletizer 

Manual 

Film shrinker

Wrap Around packer 

Robert Packing Machine 

1*2

2*3

3*4

4*6

3*5

User Ambient Conditions

Temperature:10~40℃;Humidity:No dew

User Electrical Supply Specification

Voltage:380V±5%, 3phase; Frequency:50HZ±1%

 

Washing heads.




 

Filling heads.





 

Capping heads.





Model Washing heads Filling heads Capping heads Capacity 500ml(bph) Bottle size (L)
RCGF14-12-4 14 12 4 1500 bph 0.25-2L
CGF16-16-5 16 16 5 3000 bph 0.25-2L

CGF18-18-6

CGF24-24-8

18

24

18

24

6

8

4000-5000 bph

8000-9000 bph

0.25-2L

0.25-2L

CGF32-32-10 32 32 10 10000-12000bph 0.25-2L
CGF-40-40-12 40 40 12 14000-15000 bph 0.25-2L
                                                             You can also customize the juice filling machine size you needed


Aseptic juice drinking bottling machine 5000bph rcgf 18-18-6 is suitable for filling juice and tea beverage. With temperature controller, it can also conduct thermal filling. It is used for all kinds of bottles. The bottle neck hanging technology makes the process of changing bottles easily by only adapting the height of conveyor chain. 



Q: How about the spare parts?
A: We will send one year enough easy broken spare parts together with the machines, shipping together. During the warranty time, we will supply the spare parts with our cost including the delivery fees.
          
Q: How long time for installation?
A: According your machines order, we will send one or two engineers to your plant, it will take about 10 days to 25 days.
          
Q: How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines. Customer pay air tickets go and back, accommodation and USD80/day/person.
          
Q: When can I get my machine after I paid?
A: Normally production time is around 30-60days, the exactly depend on what kind of machine you order. The shipping time is based on your destination port.
          
Q: What's your guarantee or the warranty of the quality if we buy your machines?
A: We offer you high quality machines with 1 year guarantee and supply life-long technical support.
          
Q: Are you a trading company or a manufacturer?
A: We are an Original Equipment Manufacturer so that we can provide you high quality machines in raeasonable price, Welcome to visit us.
Similar Product Recommend