-
E-mail
online@cntianyan.com
- Phone
-
Address
Chengjiang industrial zone,Huanyan district,Taizhou city,Zhejiang province.
Membership
Help
ZHEJINAG TIANYAN HOLDING CO ., LTDFree·1YRS
online@cntianyan.com
Chengjiang industrial zone,Huanyan district,Taizhou city,Zhejiang province.
PVC Elbow 1/4 Bend
Specification of PVC Elbow 1/4 Bend
Descripetion | PVC Elbow 1/4 Bend (HUB x HUB) |
Head Code | Round |
Shape | Equal |
Connection | Female |
Type | Elbow |
Technics | Injection |
Material | PVC |
Standard | ASTM D2675 |
Certification | CE, ISO |
End Type | Hub |
Connection Method | PVC Glue, PVC Solvent Cement |
Size | 4'' |
Color | White, Grey, etc. |
Application | PVC-U Drain Waste Vent System |
Place of Origin | Zhejiang China (Mainland) |
Brand | TY |
OEM | Accept |
Model Number | C310 |
Features
Anti Ultraviolet
Low Thermal Expansion Coefficient
Flame Retardant
Advantage
We had passed inspections of CE, NSF, SGS and get the certifications of ISO 9001, ISO 14001, OHSAS 18001, and WRAS and so on.
There are more than 20 series, including PVC-U, PPR, CPVC, and PP piping system, totally more than 20000 pieces products.
More than 30% market sales in Africa and South America.
Application Field
Piping networks for piping system in water treament plant.
Piping networks for irrigation, normal drainage for industry.
Piping networks for daily life drainage.
R&D STRENGTH
R&D STRENGTH 01 | R&D STRENGTH 02 | R&D STRENGTH 03 |
RFQ
Where is your factory located?
Our factory address is : Chengjiang Industrial Zone, Chengjiang Town, Huangyan District, Taizhou, Zhejiang, China (Mainland).
If i will need to stay in your place for few days, is that possible to book the hotel for me?
It’s always my pleasure, hotel booking service is available.
What is the delivery time of pipes fittings?
In general, the delivery time is about 40 days, customized products will be delivered as the negotiation with our clients.