Welcome Customer !

Membership

Nantong Roke Fluid Equipemnt Co.,Ltd
Free Member ·1YRS
,
Other

Main Products: 阀门

Xwboo>Products

Nantong Roke Fluid Equipemnt Co.,LtdFree·1YRS

  • E-mail

    admin@ntroke.com

  • Phone

    +86-513-85400443

  • Address

    B1108, Jianghai Fortune Building, 817 Jianghai Avenue, Gangzha District, Nantong City, Jiangsu Province.

Contact Now

Split Flange Halves

Model
Nature of the Manufacturer
Other
Product Category
SAE Flange
Place of Origin
City, Province
Overview
Split Flange Halves
Product Details

Stainless Steel SAE-J518 ISO6162.1 Light/Heavy SAE Split Flange Halves 3000psi/6000psi

Description

Name: SAE Split Flange Halves

Model NO: SS-FH

Working pressure: 3000psi - 6000psi

Trademark: ROKE

Port: Shanghai, China

Production Capacity: 1000 Pieces/Week

Type: Welding Flange

Sealing Surface: O-Ring

Working temperature: high temperature

Connection: Welding

Sample: Yes

Material: Stainless Steel

Manufacturing Way: Forging

Structure: Flanges

Specification: 1/2 inch to 5 inch

MOQ: 20pcs

Supply Ability: 1000 Piece per Month


348 Split Flange Halves3(001)


Carbon Steel SAE-J518 ISO6162.2 Light/Heavy SAE Split Flange Halves 3000psi/6000psi

Description

Model NO: CS-FH

Port: Shanghai, China

Material: Carbon Steel

Production Capacity: 1000 Pieces/Week

Payment Terms: L/C, T/T, D/P, Western Union, Paypal, Money Gram

Standard: ANSI, DIN, ISO

Type: Welding Flange

Specification: 1/2 inch to 5 inch

Structure: Flanges

Connection: Clamps

Sealing Surface: O-Ring

Manufacturing Way: Forging

MOQ: 20pcs

Sample: Yes

Supply Ability: 1000 Piece per Month

348 Split Flange Halves4(001)


Packaging Details

Hex Bar Stock Ball Valve:

(1) wooden box----38*27*17CM;

(2) carton----21*16*14CM/31*21*16CM;

(3) as your request and size.

Port: Shanghai port


Lead Time

Quantity (Pieces)

1 - 500

>500

Est. Time (days)

20

To be negotiated


FAQ

1. What materials should be prepared for export tax refund?

Customs declaration pre entry, invoice, packing list, contract.

2. How to control the risk of delivery delay?

Try to make TT 99% of the customer's advance payment, and do a good job of follow-up. The delivery time needs to be actively coordinated with the boss and the factory.


Technical Data

image001


Technology


Similar Product Recommend