-
E-mail
info@flygoo-ozone.com
- Phone
-
Address
Building C, Xiqi Industrial Park, Yagang, Shijing, Baiyun District, Guangzhou, Guangdong Province, China
Membership
Help
Flygoo Eco-Technologies (Guangzhou) Co., LtdFree·1YRS
info@flygoo-ozone.com
Building C, Xiqi Industrial Park, Yagang, Shijing, Baiyun District, Guangzhou, Guangdong Province, China
1.Product Introduction
Our 20G Ozone Disinfection Machine uses our patented High Voltage, High Frequency Corona Discharge technology for ozone production. It is built on a Hailea air pump that provide dry and clean air to feed the ozone generator to generate ozone. This ozone generator can use for many air and water disinfection procedures thereby increasing the overall efficiency and life.
2.Product Specification
Item | Unit | FG-AF |
Ozone Output | g/hr | 20 |
Power | w | 300 |
Electric | VAC/Hz | 220~240/50~60 110/50~60 |
Concentration | g/m3 | Oxygen supply:20~80 ; Air supply:5~15 |
Size(L*W*H) | Mm/Inch | 350*250*620 (13.78*9.84*24.40) |
Weight | kg | 15 |
Cooling System | / | Air Cooled |
Gas Feed | / | Oxygen or dry clean air |
Inner Air Compressor | Yes/No | Yes |
3.Feature
1. Corona Discharge quartz ozone tube
2. Air cooled electrodes
3. Flygoo IOT WiFi Smart Control
4. IR remote control operation
5. Ozone amount continuous adjustable (20~99%)
6. Built in Hailea air pump
7. External oxygen feed is available
8. CE, ROHS certification
4. Application
The ozone application fields cover water disinfection, air disinfection, disinfection in various occasions, family life, food, storage and transportation, medical treatment, beverage processing, etc., Moreover, the application fields under research or small-scale experiments include industry, agriculture, and aquaculture.
5. Features





4. FAQ
- Are you a Manufacturer or a Trading Company?
We are manufacturing ozone generator.
- Can we make our own brand o3 ozone generator?
Yes,we supply the OEM/ODM o3 ozone generator service.
- Terms of sale and delivery time?
EXW, FOB, CNF and CIF Term; Generally, it will take 3-5 days after receiving your advance
payment.The specific delivery time is depends on the quantity of your order.
- What is your terms of payment?
T/T 50% as deposit, and 50% T/T before delivery.