Overview
SFYC series permanent magnet elevator
Product Details
Operation and use
1. The transportation of the lifting permanent magnets are in position to demagnetization, namely red triangle logo is in horizontal, middle bracket vertically, just put the rings when used to hang on the hook of lifting equipment, by suction of center of gravity position, horizontal support, let continue to decline enabling jib whereabouts to the suction cups on the roof of a ratchet pawl automatically to skip a tooth, then ascension hook, jib with hook up and running, ratchet drive ratchet wheel rotate to the corresponding position, make the sucker of the magnetic field is completely subsided, sucked off by excitation-loss and bracket vertically, red triangle logo is in horizontal, put down the hook, the entire process automatic cycle The ring completes a transfer.
2. YC2 series equipments have two pawl and ratchet, RON should pay attention to when the two jib to suction cups on the roof at the same time, the pawl on both sides to skip a tooth. At the same time rises pawl driven ratchet operation to chuck with magnetic or demagnetization, so synchronization problems in use process should pay attention to the main shaft, spindle on the triangle for synchronous flag, each Angle can simultaneously upward or downward at the same time, if not synchronous please use hand move a pawl lifting once, to use symbol synchronization, synchronization marks without synchronization, cannot use.