Industrial Stainless Steel 2D Mixer For Dry Powder Granule Operating procedures double cone mixer ①Check before driving: a. The heat source inlet of Industrial stainless steel 2D mixer for dry powder granule must use a solenoid valve. b. Turn on the vacuum pump to check whether the pipeline connection and stuffing box are leaking, whether the sealing of...
Product Details
Description
Operating procedures
double cone mixer
①Check before driving:
a. The heat source inlet of Industrial stainless steel 2D mixer for dry powder granule must use a solenoid valve.
b. Turn on the vacuum pump to check whether the pipeline connection and stuffing box are leaking, whether the sealing of the inlet and outlet is good, and whether the response of the vacuum gauge is sensitive.
c. Open the cooling water valve to check the connection of the heat-carrying pipe, whether the stuffing box leaks, and whether the pressure gauge is sensitive.
d. Check whether the instruments, buttons and indicators of the electric control cabinet are normal, check whether the grounding wire is in good condition, whether there is leakage or short circuit.
e. Fill up the grease in each oil cup, run the starter motor empty, and listen to whether the noise is normal. If it is not normal, check the source of the noise and eliminate it.
②Put the dry materials into the container of Industrial stainless steel 2D mixer for dry powder granule (powder, fine granular and slurry materials are fed by vacuum), and then close the feed hole cover.
③ After closing the vacuum valve, turn on the vacuum pump to make the inside of the drying container have a negative pressure (600 – 755 mmHg).
④Turn on the power switch, start the motor, press the work button, and the dryer starts to rotate.
Product Features
⑤Open the heating medium valve, let the heating medium enter the interlayer of the drying container, and test it according to the process requirements.
⑥ After the drying of the material is completed, first close the heating medium valve, and then inject cooling water into the interlayer. After the material is cooled to normal temperature, stop vacuuming. Open the vacuum exhaust valve, turn off the power supply, stop the rotation of the dryer, and open the hole cover to discharge the material.
⑦ After the material is emptied, the water in the interlayer must be emptied.