Welcome Customer !

Membership

Zhangjiagang Tech Machinery Co., Ltd
Free Member ·1YRS
,
Other

Main Products: 真空脱气机

Xwboo>Products

Zhangjiagang Tech Machinery Co., LtdFree·1YRS

  • E-mail

    Jameshuang998@aliyun.com

  • Phone

    0086-512-58631557

  • Address

    Leyu Town, Zhangjiagang City, Jiangsu Province, China.

Contact Now

Edible Oil Filling Machine

Model
Nature of the Manufacturer
Other
Product Category
Glass Bottle Filling Machine
Place of Origin
City, Province
Overview
The air conveyor is directly connected with starwheel. The starwheel has the bottle separation function and bottle neck holding device.
Product Details

Description

Equipment Brief Introduction:

This Edible oil filling line can realize fill and cap automatically . It is suitable for all kinds of edible oil, juice, seasoning etc. This Edible oil filling machinery apply electronic measuring mode and special liquid component to realize low foam volumetric filling and can realize non-contact filling under all temperature condition. Adopt ALCOA capping technology to realize full direction COP cleaning.

Main Features

The air conveyor is directly connected with starwheel. The starwheel has the bottle separation function and bottle neck holding device. When the bottle size is changed, only few parts of spares need to be changed.

The machine must be designed with corrosion resistance, long life, no lubrication, so as to decrease the cost.

The bottle-out starwheel is of screw down shape. When bottle size is changed, there is no need to adjust the transferring chain's height, just change some arc and starwheel which will only take 10 minutes.

Special design filling valve for edible oil, fast filling speed, no drip leakage.


FAQ

Q: What is your term of payment?

A: 30% down payment before producing and 70% balance payment before shipping.

Q: When can I get my machines after I paid?

A: Normally production time is around 30-60 days, the exactly depend on what kind of machine you order.

The shipping time is based on your destination port.

Q: How to install my machines when it arrives? How about the cost?

A: We will send our engineer to your factory to install the machines and train your staff how to operate and maintain the machines.

Customer pay air tickets go and back, accommodation and USD 100/day/person.

Q: How long time for installation?

A: According your machine order, we will send one or two engineers to your factory; it will take about 10 days to 25 days for installation.

Q: How about the spare parts?

A: We will send two year enough easy broken spare parts together with the machines, shipping together.

During the warranty time, we will supply the spare parts for free including the delivery fees.

Q: What’s your guarantee or the warranty of the quality if we buy your machines?

A: We offer you high quality machines with 2 year guarantee and supply life-long technical support.


Similar Product Recommend