1. Introduction to Screw Conveyor Press
The screw conveying press is mainly composed of a compacted body, a support, a receiving hopper, a conveying shell, a spiral blade, a driving mechanism, a drain hopper, and a drain pipe. The scope of application is relatively wide, such as: grid slag treatment in urban sewage treatment plants, sewage pretreatment devices in residential quarters, municipal rain/sewage pumping stations, and water plants.
2.the characteristics of screw conveyor press
1. The drive device adopts a shaft-mounted parallel shaft helical gear reducer motor with compact structure, stable and safe operation.
2. The U-shaped groove is equipped with inner lining, which has strong wear resistance and long service life.
3. It adopts the structure of shaftless spiral blades and pressure-type door panel at the outlet, which integrates conveying, pressing and dewatering.
3. Working principle of screw conveyor press
The equipment adopts a shaftless screw type. When the material enters from the feed hopper of the conveying press, it relies on the rotation of the screw blades to push the material to the compaction zone along the U-shaped conveying groove. Under the reverse spring pressure, the grid slag is squeezed and dewatered, and the dewatered grid slag is forced to open the pressure plate and fall to the garbage trolley for transportation, and the squeezed seepage water flows into the grid well through the return pipe.
4.the use of screw conveyor press
The screw conveyor press is suitable for the treatment of grid slag in urban sewage treatment plants, sewage pretreatment devices in residential quarters, municipal rain/sewage pumping stations and water plants. It is mainly used with grids and other equipment to transport and squeeze the grid slag And dehydration.
5. Requirements for the safe use of screw conveyor presses
1. The screw conveyor press should be started when there is no load, so as to avoid forced start, so as not to damage the conveyor.
2. Before the screw conveyor press is started, it must be carefully checked to determine whether there are any problems, and each problem must be included. The jog test can only be performed after checking that there is no problem. After the test runs, there is no problem before the official drive.
3. If a failure occurs, please stop immediately and follow the shutdown management rules and regulations.
4. After the screw conveyor is stopped, a warning sign should be hung at the switch as a warning.
5. The rotating part of the screw conveyor press should be equipped with a protective fence or protective cover. A guard plate should be installed at the tail of the conveyor, and a pedestrian bridge should be installed to ensure that it can operate.
6. The screw conveyor press should be stopped under no-load conditions.