Welcome Customer !

Membership

Jiangsu China-Electric Pump Valve Manufacturing Co., Ltd.
Free Member ·1YRS
,
Other

Main Products: 泵

Xwboo>Products

Jiangsu China-Electric Pump Valve Manufacturing Co., Ltd.Free·1YRS

  • E-mail

    ce@cepvm.com

  • Phone

    0523-81167566

  • Address

    8 Yanjiang Road, Xinqiao Town, Jingjiang City, Jiangsu Province

Contact Now

CYG series cabinet air conditioning unit

Model
Nature of the Manufacturer
Other
Product Category
Refrigeration series
Place of Origin
City, Province
Overview
CYG series cabinet air conditioning unit
Product Details

Features

Box

The box is made of high-sealing profile frame and the combination of low thermal resistance wall plate made of color steel plate. Frame for the aluminum alloy skeleton; wall for the overall foam, the thermal conductivity: λ = 0.022w / m. Can also use high-frequency polyethylene wall panels or glass wool panels. The structure of rust-proof corrosion, beautiful and durable, the box leakage rate is small.

Fan

The use of low noise and high efficiency external rotor centrifugal fan, the fan by precision dynamic balance correction, to ensure smooth operation of the unit, so that it has a low noise and high pressure characteristics.

Surface cooler

The main body of the surface cooler is made of high quality seamless copper tube and high purity aluminum foil. The advanced mechanical or hydraulic pipetting process makes it close and tested by the 2.8MPa pressure seal leak test. The performance conforms to the American ARI standard and ensures the superior product Performance and reliable quality.

Dry condensate pan

Well-designed condensate pan and extra-thick lined insulation ensure that the unit is dripping without condensation during harsh environmental conditions. Condensate pan slightly tilted to install, is conducive to condensate discharge. At the same time condensate pipe according to non-full flow state calculation, the discharge capacity for the normal operation of the unit emissions more than 5 times. The timely discharge of condensate reduces the "water" time of the condensate pan, which is beneficial to alleviate the corrosion of the condensate pan and avoid the growth of the condensate tray to ensure the indoor air quality.

air filter

Specially designed special plate filter can be arbitrarily from the unit around, up and down to facilitate the extraction, it is particularly suitable for the maintenance of space compact cleaning. Filter material can be used nylon convex or non-woven material.

 

Horizontal (W), stand cabinet (L) unit main performance parameters:

 

CYG ceiling unit (D) The main performance parameters:

 

Note:

1, return air conditions: cold air into the dry air temperature 27 ℃, wet bulb temperature 19.5 ℃, water temperature 7 ℃, out of water temperature difference 5 ℃.

Heating air into the dry bulb temperature 15 ℃, hot water inlet temperature 60 ~ C.

2, the new wind conditions: cold air into the dry air temperature of 34 ℃, wet bulb temperature of 28 ℃, water temperature of 7 ℃, the temperature difference between access to water 5 ℃.

Heating air into the dry bulb temperature -4 ℃, hot water inlet temperature 60 ℃.

 

Horizontal structure of sleeper air conditioning unit

 

Design of cabinet type air conditioning unit

 

Horizontal (W), cubicle (L) Unit size table:

 

CYG ceiling unit (D) outline

 

CYG ceiling air conditioning unit size table

 

Note: In the figure, G: the surface cooler is 4 in row 4 and 165 in the row.

Installation, use and maintenance of air conditioning units:

1, lying, vertical units to be placed in the height of ≥ 160mm on the basis of concrete or steel, to ensure that the level of placement. The installation of the lifting unit should ensure that the unit is tilted and the condensate is spilled.

2, the unit should be around the maintenance of more than 0 8 meters spacing for the filter out and unit maintenance.

3, the unit's lowest water pipe for the condensate discharge pipe, drain pipe should be set to trap, to ensure the smooth discharge of condensate.

4, the internal piping must be cleaned before the unit connected with the heat exchanger, so as not to damage the heat exchanger or the heat exchanger blocked.

5, the unit installation and positioning of external piping connection process, should avoid the unit of the water pipe joints too much force, so as not to damage the unit related parts.

6, the unit into the outlet and the wind between the application of soft connection. The weight of ducts and pipes connected to the unit shall not be carried by the crew.

7, the unit power supply for the 380V, 50Hz. Should first check the power supply voltage, meet the requirements before the motor can be connected. After starting the first start the motor, check the fan steering is normal, such as turning to the contrary, should stop the power phase sequence changes, and then the power is properly connected.

8, the unit duct is not connected to the load operation, the outlet should be blocked 3/4. Or so, to prevent burning bad motor.

9, the winter unit boot, you should first start the pump, and then open the new air valve; shutdown should first close the new air valve, and then close the pump.

10, the winter unit temporary or prolonged downtime, should close the new air valve; for a long time downtime, the heat exchanger should be allowed to run out of water to prevent freeze heat exchanger.

11, the air filter must be regularly cleaned, the two cleaning time interval depending on the use of the environment may be.

12, the unit should be 2 to 3 years after the full maintenance. The chemical method to remove the scale within the heat exchanger, with compressed air or water; in the wash heat exchanger fins.

13, the unit should be hand management, operation should be regularly check the operation of the unit, found abnormal should be promptly excluded.

Horizontal (W), stand cabinet (L) unit main performance parameters:

CYG吊顶机组(D)主要性能参数:
注:
1、回风工况:供冷进风干球温度27℃、湿球温度19.5℃,进水温度7℃,进出水温差5℃。供热进风干球温度15℃、热水进水温度60~C。
2、新风工况:供冷进风干球温度34℃、湿球温度28℃,进水温度7℃,进出水温差5℃。供热进风干球温度-4℃、热水进水温度60℃。

卧柜式空调机组外形示意图

立柜式空调机组外形示意图

卧式(W)、立柜式(L)机组尺寸表:

CYG吊顶机组(D)外形示意图

CYG吊顶空调机组尺寸表

Note: In the figure, G: the surface cooler is 4 in row 4 and 165 in the row.
Installation, use and maintenance of air conditioning units:
1, lying, vertical units to be placed in the height of ≥ 160mm on the basis of concrete or steel, to ensure that the level of placement. The installation of the lifting unit should ensure that the unit is tilted and the condensate is spilled.
2, the unit should be around the maintenance of more than 0 8 meters spacing for the filter out and unit maintenance.
3, the unit's lowest water pipe for the condensate discharge pipe, drain pipe should be set to trap, to ensure the smooth discharge of condensate.
4, the internal piping must be cleaned before the unit connected with the heat exchanger, so as not to damage the heat exchanger or the heat exchanger blocked.
5, the unit installation and positioning of external piping connection process, should avoid the unit of the water pipe joints too much force, so as not to damage the unit related parts.
6, the unit into the outlet and the wind between the application of soft connection. The weight of ducts and pipes connected to the unit shall not be carried by the crew.
7, the unit power supply for the 380V, 50Hz. Should first check the power supply voltage, meet the requirements before the motor can be connected. After starting the first start the motor, check the fan steering is normal, such as turning to the contrary, should stop the power phase sequence changes, and then the power is properly connected.
8, the unit duct is not connected to the load operation, the outlet should be blocked 3/4. Or so, to prevent burning bad motor.
9, the winter unit boot, you should first start the pump, and then open the new air valve; shutdown should first close the new air valve, and then close the pump.
10, the winter unit temporary or prolonged downtime, should close the new air valve; for a long time downtime, the heat exchanger should be allowed to run out of water to prevent freeze heat exchanger.
11, the air filter must be regularly cleaned, the two cleaning time interval depending on the use of the environment may be.
12, the unit should be 2 to 3 years after the full maintenance. The chemical method to remove the scale within the heat exchanger, with compressed air or water; in the wash heat exchanger fins.
13, the unit should be hand management, operation should be regularly check the operation of the unit, found abnormal should be promptly excluded.
Similar Product Recommend