Membership
Help
WENZHOU HUACHU MACHINERY CO., LTD.
WENZHOU HUACHU MACHINERY CO., LTD.
Sample bag picture

PRODUCT INFORMATION
ABA three layer blown film machine Performance and Characteristics:
The machinge body is channel steel frame traction frequency friction,with single rolling friction,lift up and down which is suitable for blowing high-low pressure polyethylene industral fiml and agricultural film.
ABA co-extrusion film blowing machine enjoys advantages in producing HDPE, LDPE and LLDPE material. The strength of plastic film is improved by co-extrusion. Besides, with only two extrusion units, this model achieves function of three layer film blowing machine. One unit deals with inner&outer layer, while the other deals with inner stuffing layer. In this way, costs are reduced and energy is saved. Meanwhile, to enhance market competitiveness of customers, it's possible to add recycled material and CACO3 into inner puffing layer at the rate of 70% of full amount.
Model | HC-ABA1000A | HC-ABA1300A |
Screw diameter | φ45×50 | φ50×55 |
Width of film (mm) | 300-900 | 300-1200 |
Thickness of film (mm) | HDPE 0.008-0.06 LDPE 0.02-0.15 | HDPE 0.008-0.06 LDPE 0.02-0.15 |
Die size | HDPE ABA φ80/100 | HDPE ABA φ100/120 |
Max output (kg/h) | 120kg | 150kg |
Screw L/D length | 30 :1 | 30 :1 |
Screw and cylinder material | Bimetallic | Bimetallic |
Main motor | 18kw×22kw | 18.5 kw×30 kw |
Gearbox model | 146×146 | 180×180 |
Take up motor (kw) | 1.5 kw | 2.2 kw |
Blower (kw) | 5.5 kw | 5.5 kw |
Weight (T) | 4.5 T | 4.5 T |

FAQ
Q1:IS OVERSEAS INSTALLATION AVAILABLE?
A: If you need help setting up the machinery, we will be able to send an experienced technician to your company and assist with the assembly.
Installation, Training and Maintenance for one week period:
The buyer should pay round trip ticket, visa application fee, local transportation and accommodation.
The buyer should pay USD 200 per day (base on 8 hours/daily) per engineer from the date of departing till the date arrived the seller's base.
Q2: WHAT IS THE WARRANTY POLICY?
A: Mechanic parts will be guaranteed for 12 months from the shipping date, which is showed on the Bill of Landing.
Electronic and consumption parts are not in the warranty range.
Q3: WHAT IS THE LEAD TIME OF THE MACHINE?
A:Depending on the size of the extruder, it usually takes about 45-60 days to complete. We will inform our clients when the order is ready for shipment.