Welcome Customer !

Membership

XwbooInstrumentationTesting MachineTransformer Testing MachineAC High Voltage Tester
  • $item.Title
  • $item.Title

AC High Voltage Tester

Wuhan Goldhome Hipot Electrical Co., Ltd.

Model
Nature of the Manufacturer
Manufacturer
Product Category
Transformer Testing Machine
Place of Origin
HuBei, WuHan
● Rated capacity: 600kVA● Low voltage current: 0~1578.9A● Low voltage: 0~380V● High voltage: 0~600kVVoltage, current, time, status information and prompt information and other data are displayed on a 10-inch large-screen LCD, with clear and intuitive readings;

HMYDJ-600kVA/600kV AC high voltage tester

I. Product structure:


This series is composed of an insulated cylindrical high-voltage test transformer, a voltage divider, a fully automatic intelligent console, a compensation voltage regulator, an isolation step-up transformer, and a current-limiting resistor.

Lead the test product from the high-voltage output terminal block of the insulated cylindrical high-voltage test transformer, through the current transformer on the electric voltage regulator and the meter on the insulated cylindrical high-voltage test transformer, output to the ammeter, voltmeter, indicator light, and button on the console To measure, monitor and operate.

It is widely used in power system users to test the insulation performance of various high-voltage electrical equipment on site. Especially suitable for large-scale enterprises and research departments for project research and use.

DETAILS

II.Whole set of equipment


1. Intelligent electric console:

● Rated capacity: 600kVA

● Low voltage current: 0~1578.9A

● Low voltage: 0~380V

● High voltage: 0~600kV

● High voltage current: 0~1A

● Instrument voltage: 0~100V

● Accuracy of voltage measuring meter: 0.5%FS ±3 digits

● Current measuring head accuracy: 0.5%FS ±3 words

● Overall accuracy: 1.5%

● Timing length: 0 ~ 999.9 S (special mode can be used for long time work)

● Power supply voltage: AC220V ±10%; 50Hz±2 Hz

● Use environment: ambient temperature 0~50 ℃ relative humidity ≤85%RH

2. Electric compensation voltage regulator: rated capacity 600kVA

Input voltage 380V / single phase

Input current 1578.9A

Output voltage 0~600V/single phase

Output current 1000A

Structure: dry

Cooling method: fan cooling

Running time: ≤10 minutes

Dimensions 1200×1300×1800

Quality 2000kg

3. Isolation step-up transformer: rated capacity 600kVA

Input voltage 0-600V / single phase

Input current 1000A

Output voltage 0~2000V/single phase

Output current 300A

Structure: dry

Cooling method: fan cooling

Running time: ≤10 minutes

Dimensions 900×1200×1500

Quality 2000kg


4. Series excitation test transformer

Rated capacity: 600kVA

Rated input current: 300A

Input voltage: 0~2000V/single phase

High voltage output voltage: AC0~300kV

Output high voltage current: 0~2A

Series output capacity: 300kVA

Series excitation output voltage: AC0~2000V

Series excitation output current: 150A

No-load loss: ≤4%

Load loss: ≤9%

Input, output, and measurement ratio accuracy: <1.5%

Insulation medium: 25 transformer oil

Cooling method: oil circulation cooling

Structure: Cylindrical insulation barrel package

Running time: ≤10 minutes


4. Test transformer

Rated capacity: 300kVA

Rated input current: 150A

Input voltage: 0~2000V/single phase

High voltage output voltage: AC0~300kV

Output high voltage current: 0~1A

No-load loss: ≤4%

Load loss: ≤9%

Input, output, and measurement ratio accuracy: <1.5%

Insulation medium: 25 transformer oil

Cooling method: oil circulation cooling

Structure: Cylindrical insulation barrel package

Running time: ≤10 minutes


5. AC voltage divider

Rated voltage: AC600kV

Measurement feedback ratio: 3000:1

High voltage measurement voltage feedback display (digital meter)

Measurement accuracy: 1.5 level

High voltage capacity: 300 pF

Dielectric loss of the measuring device body: ≤0.5%

Running time: ≤10 minutes

Cooling method: oil circulation cooling


6. Current limiting resistor

Rated voltage: AC600kV

Rated current: 1A

Running time: ≤10 minutes


III. Product features

● Voltage, current, time, status information and prompt information and other data are displayed on a 10-inch large-screen LCD, with clear and intuitive readings;

● simple and clear operation, can be adapted to a variety of applications;

● Touch operation, all functions can be preset in advance, which improves the safety and reliability of the product;

● Status reminder function, full Chinese guided operation;

● Alarm function, closing alarm, 5 seconds buzzer alarm prompt; abnormal voltage signal collection, buzzer alarm;

● Emergency stop function, under automatic control, this function can realize the emergency stop of boosting or depressing at any point;

● Automatic timing function. In automatic control, when the voltage automatically rises to the set value, the device automatically starts timing, and when the timing expires, the device automatically drops the voltage and automatically returns to zero;

● Manual control mode, this mode is similar to the traditional electric boost/decrease mode, the up/down is controlled by the touch key, the device automatically judges the upper/lower limit, high-voltage over-voltage, low-voltage current protection, high-voltage over-current protection;

● Using a combination of hardware and software anti-interference technology, stable performance and strong anti-interference.


IV. Safety precautions


(1) The insulation resistance should be measured before and after each test, and the insulation condition should be checked.

(2) This product is forbidden to be stored and used for a long time at a temperature higher than 45°C.

(3) This product must not exceed the rated parameters. Except as necessary for testing, it is never allowed to energize or de-energize at full voltage.

(4) When doing a test with a larger capacity sample, the boost must be slow to prevent excessive charging current of the sample from damaging the equipment, and a DC test must be fully discharged.

(5) This product should be placed in a ventilated, dry place without direct sunlight when it is not used for a long time.

(6) This product must not be hit or pressed heavily during transportation, and it must not be tilted or placed upside down.

(7) The oil-immersed insulated cylindrical high-voltage test transformer needs to stand still before it can be energized after transportation.

(8) The use of this product for high-voltage tests must be performed by professionals. In addition to being familiar with this manual, the relevant national standards and operating procedures must be strictly implemented. Refer to GB/T16972-1997 "Insulation coordination of high-voltage transmission and transformation equipment, high-voltage test technology", "Preventive test procedures for electrical equipment", etc.

(9) Set up the venue in accordance with relevant regulations and connect the equipment connections. In areas where conditions permit, there should be personnel responsible for safety on-site for guidance. Connect the ground terminal of the console to the ground grid, and connect the ground terminal of the transformer to the ground grid to ensure that the two ground terminals are reliably connected to the same ground grid.

(10) Connect the power cord, turn on the power switch, and press the "Emergency Stop" button if you need to approach the test transformer, the tested product and other equipment linked to it.

(11) After connecting. If it is not in the zero position, the system will automatically return to the zero position.

(12) Irrelevant items are not allowed to be stacked on and around the equipment panel during the test.

(13) Please check the power supply voltage before starting up.

(14) When replacing the fuse and accessories, please use the same model as this instrument.

(15) This instrument should be protected from moisture and oil.

(16) During the test, please confirm that the device under test has been powered off and disconnected from other live devices.


V. Conditions of Use


Ambient temperature: -10--40°C

Altitude: <1000M

Relative humidity: <85%

There should be no gas, steam, chemical dust, and other explosive and corrosive media that seriously affect the insulation.


  Wuhan Goldhome Hi pot Electrical Co.,ltd(short for Goldhome Hi pot) was established in 2008, its predecessor was state-owned third industry enterprises, one of the earliest enterprises specially in develop, design and manufacture high voltage testing equipment in China.In 2016, merged with Wuhan Sang Electric Co., Ltd. , we realize advantageous compartmentalize and resources reorganization.Now it has become a high-tech enterprise integrating R&D, production, marketing installation and commissioning.1.our-historyOur FactoryGoldhome Hi pot is located in Huading Mould Industrial Park, Economic and Technical Development Zone, Wuhan City, Hubei Province, China, working area more than 4000 square meters.As a high-tech enterprise, we are supported by natural advantages from various research universities in Wuhan city. Goldhome Hi pot works closely with professors from State Grid Power Science Research Institute, Electrical Engineering Colleges of Wuhan University and other scientific research institutions, constantly improving technology and updating products . Now Goldhome Hi pot has more than 20 patented technologies, and many software Copyrights!2.our factory-1product and product applicationOur ProductOur advantage products included AC Resonant Test System, PD Free Test System, AC/DC Hi pot Tester, Primary Current Injection, VLF Hi pot Tester, transformer tester,impulse generator,Transformer oil tester,HV Switch gear Tester ,Insulation Tester,ground Resistance Tester,cable fault locator,relay test set,CT PT analyse,arr ester tester and sf6 gas analyzer,etc.Product ApplicationAll the performance indexes of above testing equipment can reach the leading level in China, widely used in power supply bureau, power plant, power construction, railway, petroleum, chemical industry, metallurgy, coal and other industries.In recent years,our factory continues to expand overseas markets, some competitive products are already exported to American and European countries, Africa, Middle East, etc , and well praised by customers.product applicationOur CertificateAll product process is strictly in accordance with international standards and power industry regulations. And the products are through the national, provincial power authorities testing, as well as CE certification! At present,0ur company has received ISO9001:2015 quality management system certification, ISO14001:2018 occupational health and safety management system certification, and ISO14001:2015 environmental management system certification,and also had got SGS certification.We has more than 20 patented technologies,such as The utility model patent of a frequency conversion series resonance test device,The utility model patent of Lightning impulse voltage testing equipment,The utility model patent of DC high voltage generator,The utility model patent of microcomputer relay protection tester,The utility model patent of High voltage switching characteristic tester., etc.4.certificateoverseas market & our serviceOverseas MarketOur products are sold to Europe, Asia, Africa, North and South America and Oceania, Middle East, etc.and are well received by customers.We had won the bids for the purchase of high-voltage no-partial discharge test equipment from the Polish state-owned insulator production plant, the Myanmar National Grid cable fault tester purchase project, and the high-voltage test equipment purchase project of a Russian power installation and test engineering company.We also sell to end customers, and a single device can also be sold. For example, there are power maintenance and installation companies in Indonesia, South Africa, Denmark, and South Korea, and universities and research institutions purchase and use our test equipment.At the same time, our sales targets also include agencies. At present, we already have cooperated with agents in Singapore, Israel, Mauritius , etc.We insist on providing customers with first-class products and first-class services with reliable product quality and perfect service team.5market-1Our service1.Strict factory testAll products will be assembled and test strictly accord with our product process standard. All qualified products will be issued factory release reports and certificate labels.Defect products or non-qualified products won’t be allowed to make deliver.2.Providing technical materialsDuring the product acceptance, we provide the related manual sheets, packing list,qualified certificate labels, factory test reports and other technical documents.3. Support technical guidanceWe also provide the training for the operators. Complete training includes the skilled operations of our equipment, maintenance and troubleshooting . it also ranges the commissioning and test of our products at site!After-sale service1.First-use responsibility systemAfter the product is delivered, the technician can guide the operation at site if the client requires, and be responsible for the first use of each part2.One year warrantyAll products warranty is 1year, life-time maintenance .During the warranty period, if any defects or damaged because of product’s quality, maintenance or replacement can be provided with free charge in order to let our client’s satisfied !3.TroubleshootingIf the troubleshooting is not difficult, and client can handle with it by themselves, we can offer the call-on line guide within 1 hour!If the troubleshooting is difficult to handle with for client, we can promise that the best solution can be provided within 24 hours!
Similar Product Recommend