Membership
Help
Wenzhou Tessior Technology Co., Ltd.
Wenzhou Tessior Technology Co., Ltd.
| Packaging Details | Package 1pcs/carton Net weight 31 kg Gross weight 33kg Dimension 360*29*360 |
|---|---|
| Delivery Time | Usually 7-10 working days |
APPLICATIONN
Application: 1. Mainly applicable to the tanker matching. 2. Other gas-liquid mixture of measurement.
Applicable medium: suitable for liquefied petroleum gas, kerosene, diesel, gasoline and mixed fuel of the filling and refueling metering services.
TXR-LPGFM85 folw metter is in construction of stainless steel bush and four-piston positive displacement with check valve bulit in,with advantage of high reliability,good wearability,hiqh-precision measure,and long life.
SPECIFICATION
| Max working pressure | 1.8 Mpa |
| Flow meter | 5-35L |
| Discharge rate per revolution | 0.5L |
| Adjustable Min.Volume | 0.04% |
| Accuracy | ±0.3% |
| Repeatable Tolerance | ≤0.15% |
| Package | 1pcs/carton |
| Net weight | 31kg |
| Gross weight | 33kg |
| Dimension | 360*29*360mm |
Pump will be sent to the flow of liquefied gas flow, the use of inlet and outlet pressure difference push
moving piston, driven by live rod, connecting rod crankshaft, crank belt moving distribution valve. Through the transfer of the valve, so that the piston to continue re-movement, and the oil discharged to the flow meter outlet. Four pistons per circulate once (ie crankshaft or movable disc rotation for one week), drain 0.5 Liter liquefied gas. The outer rotor assembly is driven by the dispensing valve and is mounted on the outer rotor group, The magnet on the magnet drives the inner rotor magnet under the driving force of the magnetic field so that the inner rotor assembly rotates together.
Problem: Leakage
Reason 1:Check the leakage of parts of the seal is damaged, aging and so on
Solved 1 :Replacement of rubber parts
Reason 2:Check for defects such as trachoma, stomata or cracks in the cast parts of the leak
Solved 2:Replace defective castings
Reason 3:The fastening screws are uneven or not tightened
Solved 3:Uniform screw tightening
Problem: Metering is not accurate
Reason 1:Whether the skin wrist damage
Solved 1 :Replace the skin wrist (Note: before the replacement of the cylinder liner to clean the surface)
Reason 2:Dispense valve or distribution seat wear
Solved 2:Replace the dispensing valve or disassemble the valve seat
Reason 3:Check if the single bearing is damaged
Solved 3:Replace single bearing
Problem: The oil is not counting
Reason 1:Check if the flowmeter is reversed
Solved 1 :Replace the distribution valve assembly opening direction
Reason 2:Check whether the drive pins are broken
Solved 2:Replace the drive pin
Reason 3:Check whether the inner rotor assembly is frozen and frozen replace the drive pin
Solved 3: After the ice can be re-assembled
Wenzhou Tessior Technology Co., Ltd. is a professional development of oil, liquefied petroleum
gas, natural gas pumps, flow meters, valves and other products and accessories integrated
business.The company has number of professional and technical and management personnel.The company developed products for liquefied petroleum gas, natural gas, oil, processing, refueling stations and other industr
We do our best solved your question, on line 24 hours, professional technology support.
Wenzhou Tessior Technology Co., Ltd. since its inception, "to meet customer needs" as a fundamental, depending on "product quality" for life.For this purpose , we are proactive, and constantly develop, develop new product technology applications and continuous improvement of product performance, technology and so on.
Packing :1pcs/carton, carton or wooden case, that's depend on shipway and your detail inquire.
Shipping: 7-30 days after of shipping ,that's depend on ship way.