Product Overview
The PT260 Displacement Static level meter is a critical ground-level monitoring sensor in engineering settlement monitoring systems; a static level meter measurement system is a precision instrument that measures changes in relative liquid surface height between two or more points. It is primarily used to monitor vertical displacement and tilt in dams, nuclear power plants, wind farms, high-rise buildings, mines, landslides, and bridges. Static level meter systems are generally installed on survey piers (base platforms) at the same elevation as the structure being monitored, or along the elevation lines of the structure’s walls. They typically employ modular automatic measurement units to collect data, which is transmitted to a computer via wired or wireless communication, thereby enabling automated observation.
Composition and Operating Principles of the Monitoring System
1- System Configuration
The static level meter monitoring system consists of a data logger, one reference-point static level gauge, and several monitoring-point static level gauges, as well as mounting brackets for the level gauges, data transmission cables, liquid connecting tubes and mounting hardware, atmospheric vent tubes and mounting hardware, desiccant tubes, and liquid. There are two installation methods: flat mounting on a survey bench and side mounting on a wall. The method is selected based on site conditions and design requirements.

How the System Works
The static level meter monitoring system consists of monitoring point sensors, reference point sensors, a liquid tank, a data logger, and a data processing center. The static level meter monitoring system comprises at least three sensors: one reference point and at least two monitoring points. The data acquisition system collects data from the monitoring points and reference points in real time or at preset intervals and frequencies, transmitting it to the data processing center. The data processing center performs comprehensive analysis and comparison of the collected data across various time periods to derive settlement data for the monitoring points, thereby determining whether the monitored points are in a safe condition. The pressure from all static leveling instruments is connected to the interfaces of the liquid reservoir via piping in either a series or parallel configuration. After the liquid reservoir is filled with liquid, the liquid is transmitted through the liquid pipes to the pressure chambers of each static leveling instrument. Simultaneously, air is purged from the chambers and pipes to minimize the impact of thermal expansion and contraction on sensor accuracy; Once the liquid surface has completely stabilized, the liquid levels in all communicating vessels within the system should be at the same geoid level. At this point, the sensor measures the differential settlement of each vessel’s liquid level. To ensure measurement accuracy and application effectiveness, the distance between monitoring points and their adjacent points should be kept within 30 meters. The specific spacing arrangement is determined by the design unit based on site conditions.
Measurement Principle
Assuming the static level meter’s measurement range is 0–1000 mm H₂O, the height difference between the reference point and the liquid surface in the tank is 800 mm, and the liquid medium is water, with a density of 0.916 g/cm³, the pressure generated by 1000 mm H₂O is 9.8 kPa; Since the reference point remains fixed, the pressure value detected by the reference point sensor corresponding to the liquid level height is 7.84 kPa. The data center converts this to display the liquid level height as 800 mm H₂O. This data serves as the reference value. Monitoring points are arranged in segments relative to the reference point; each monitoring point will inevitably have some installation error. This value does not affect subsequent data analysis and can be ignored; simply substitute the reference value during subsequent data comparisons. Assumption: Monitoring Point #1 displays an actual height of 815 mm after installation; Monitoring Point #2 displays an actual height of 795 mm after installation; Monitoring Point 3 displays an actual height of 815 mm after installation, and Monitoring Point 4 displays an actual height of 802 mm after installation. Using the reference point as the numerical baseline, the differences between the other four monitoring points serve as initial error compensation. After configuration via the software, this becomes the baseline, and real-time settlement monitoring can then begin. Ignoring the daily evaporation of liquid water, if the difference between the height values displayed by the monitoring points and the reference point shows a regular increase in daily data comparisons, it can be determined that there is slow ground settlement; if the difference increases irregularly, there may be safety hazards associated with the ground settlement, requiring a timely response and appropriate measures to prevent such hazards. The figure below illustrates the monitoring principle.

Level Parameters
Product Model: PT124B-226E
Measurement Range: 0–500 mmH₂O; 0–1000 mmH₂O; 0–1500 mmH₂O; 0–2500 mmH₂O
Output Signal: RS485
Accuracy: 0.02% FS
Power Supply: 9–24 V DC
Protection Rating: IP67
Pressure Medium: Water, Antifreeze, Silicone Oil
Electrical Connection: Waterproof 4-pin connector

Installation—Side-Mounted

Monitoring Point Installation—Surface-Mounted Type