Generator AC Impedance Mesurement Tester

Wuhan Goldhome Hipot Electrical Co., Ltd.

Model
Nature of the Manufacturer
Manufacturer
Product Category
Transformer Testing Machine
Place of Origin
HuBei, WuHan
1. AC impedance: 0~999.9Ω 0.5 grade2. AC voltage: 0~600V 0.5 level3. Alternating current: 0~120A 0.5 level4. Active power: 0~72KW 1.0 level5. Frequency: 45~75Hz 0.2 level
I. Overview


Generator AC Impedance Mesurement Tester is a special instrument for judging whether the generator rotor winding has inter-turn short circuit. It can measure the voltage, current, impedance, power, phase angle and other parameters of the rotor winding automatically and manually (one-way or two-way). This instrument has the following functions and features:

◆ Measure the rotor AC impedance and characteristic curves of various synchronous generators and asynchronous motor windings under static conditions.

◆ Rotate the mouse for more convenient operation.

◆ Two modes of quick automatic measurement and arbitrary manual measurement can be selected.

◆ Large-screen Chinese menu interface, real-time display of test data and curves.

◆ Stored data, built-in micro-printer, real-time and fast printing of test data and characteristic curves.

◆ Automatically adjust the protection action value according to the test parameters to ensure the safety of the equipment.

◆ It can be used as the no-load and short-circuit test of single-phase transformer and the volt-ampere characteristic test of voltage (current) transformer and arc suppression coil.

II. Performance indicators


1. AC impedance: 0~999.9Ω 0.5 grade

2. AC voltage: 0~600V 0.5 level

3. Alternating current: 0~120A 0.5 level

4. Active power: 0~72KW 1.0 level

5. Frequency: 45~75Hz 0.2 level

6. Power supply: AC 220V±10% 50Hz

7. Volume: 415×225×200mm

8. Weight: 5kg


III. Parameter setting


Enter the "Settings" column, and the setting range or content is as follows:

Maximum voltage-its set value is the default overvoltage protection action value; the maximum value of the voltage to be tested in the test must be less than this value, and the range is 0~600V.

Maximum current-the set value is the default overcurrent protection action value; the maximum value of the current to be tested in the test must be less than this value, and the range is 0~120A.

Voltage step-in the automatic collection of voltage data, the size of the voltage interval between each sampling point.

The voltage step size ranges from 5V to 50V, and the adjustment interval is 5V.

Entry mode-select the voltage step length to be automatically recorded according to the step value,

The selected voltage is a manual determination record;

Note: Each test instrument can sample up to 50 points. When the ratio of the maximum voltage to the voltage step is greater than 50, the instrument will judge that the parameter setting is invalid.

IV. Maintenance

1. The instrument should be placed in a dry and ventilated place at ordinary times to prevent damage to internal components due to moisture.

2. The instrument should be handled and placed carefully to avoid violent vibration and falling.

3. Under normal circumstances, it is not allowed to open the case and plug in and out the internal parts to avoid unnecessary losses.

4. This product has a one-year warranty and lifetime maintenance. If quality problems occur within one year, our company will be responsible for free repairs or replacements.

V. Precautions

1. Before using the instrument, read the product manual carefully and master the correct method of use.

2. Wire correctly during the test. Only after checking that the wiring is correct and the connection is reliable can the power be turned on.

3. Before boosting the voltage of the tested equipment, it must be checked that the voltage regulator is indeed at the zero position before it can be turned on to prevent the tested equipment and instruments from being impacted by high voltage and high current.

4. Operate correctly. The voltage regulator should increase the voltage evenly and slowly near the test point during the test to ensure the reliability of data collection.

5. Among the two wires of the test clamp, the thick wire is the current wire (I1, I2), and the thin wire is the voltage wire (U1, U2).

6. The voltage and current are both at 1.1 times the set value and the protection trips. If any one of the voltage and current reaches 1.1 times the protection value, it will trip.

7. If there is a protective action during the test, the test must be found out and the abnormality removed before continuing the test. Do not operate blindly to avoid unnecessary losses.

8. Non-professional maintenance personnel are strictly forbidden to open the case for repair or replacement to avoid electric shock or other accidents.


  Wuhan Goldhome Hi pot Electrical Co.,ltd(short for Goldhome Hi pot) was established in 2008, its predecessor was state-owned third industry enterprises, one of the earliest enterprises specially in develop, design and manufacture high voltage testing equipment in China.In 2016, merged with Wuhan Sang Electric Co., Ltd. , we realize advantageous compartmentalize and resources reorganization.Now it has become a high-tech enterprise integrating R&D, production, marketing installation and commissioning.1.our-historyOur FactoryGoldhome Hi pot is located in Huading Mould Industrial Park, Economic and Technical Development Zone, Wuhan City, Hubei Province, China, working area more than 4000 square meters.As a high-tech enterprise, we are supported by natural advantages from various research universities in Wuhan city. Goldhome Hi pot works closely with professors from State Grid Power Science Research Institute, Electrical Engineering Colleges of Wuhan University and other scientific research institutions, constantly improving technology and updating products . Now Goldhome Hi pot has more than 20 patented technologies, and many software Copyrights!2.our factory-1product and product applicationOur ProductOur advantage products included AC Resonant Test System, PD Free Test System, AC/DC Hi pot Tester, Primary Current Injection, VLF Hi pot Tester, transformer tester,impulse generator,Transformer oil tester,HV Switch gear Tester ,Insulation Tester,ground Resistance Tester,cable fault locator,relay test set,CT PT analyse,arr ester tester and sf6 gas analyzer,etc.Product ApplicationAll the performance indexes of above testing equipment can reach the leading level in China, widely used in power supply bureau, power plant, power construction, railway, petroleum, chemical industry, metallurgy, coal and other industries.In recent years,our factory continues to expand overseas markets, some competitive products are already exported to American and European countries, Africa, Middle East, etc , and well praised by customers.product applicationOur CertificateAll product process is strictly in accordance with international standards and power industry regulations. And the products are through the national, provincial power authorities testing, as well as CE certification! At present,0ur company has received ISO9001:2015 quality management system certification, ISO14001:2018 occupational health and safety management system certification, and ISO14001:2015 environmental management system certification,and also had got SGS certification.We has more than 20 patented technologies,such as The utility model patent of a frequency conversion series resonance test device,The utility model patent of Lightning impulse voltage testing equipment,The utility model patent of DC high voltage generator,The utility model patent of microcomputer relay protection tester,The utility model patent of High voltage switching characteristic tester., etc.4.certificateoverseas market & our serviceOverseas MarketOur products are sold to Europe, Asia, Africa, North and South America and Oceania, Middle East, etc.and are well received by customers.We had won the bids for the purchase of high-voltage no-partial discharge test equipment from the Polish state-owned insulator production plant, the Myanmar National Grid cable fault tester purchase project, and the high-voltage test equipment purchase project of a Russian power installation and test engineering company.We also sell to end customers, and a single device can also be sold. For example, there are power maintenance and installation companies in Indonesia, South Africa, Denmark, and South Korea, and universities and research institutions purchase and use our test equipment.At the same time, our sales targets also include agencies. At present, we already have cooperated with agents in Singapore, Israel, Mauritius , etc.We insist on providing customers with first-class products and first-class services with reliable product quality and perfect service team.5market-1Our service1.Strict factory testAll products will be assembled and test strictly accord with our product process standard. All qualified products will be issued factory release reports and certificate labels.Defect products or non-qualified products won’t be allowed to make deliver.2.Providing technical materialsDuring the product acceptance, we provide the related manual sheets, packing list,qualified certificate labels, factory test reports and other technical documents.3. Support technical guidanceWe also provide the training for the operators. Complete training includes the skilled operations of our equipment, maintenance and troubleshooting . it also ranges the commissioning and test of our products at site!After-sale service1.First-use responsibility systemAfter the product is delivered, the technician can guide the operation at site if the client requires, and be responsible for the first use of each part2.One year warrantyAll products warranty is 1year, life-time maintenance .During the warranty period, if any defects or damaged because of product’s quality, maintenance or replacement can be provided with free charge in order to let our client’s satisfied !3.TroubleshootingIf the troubleshooting is not difficult, and client can handle with it by themselves, we can offer the call-on line guide within 1 hour!If the troubleshooting is difficult to handle with for client, we can promise that the best solution can be provided within 24 hours!