Welcome Customer !

Membership

XwbooInstrumentationEnvironmental Test ChamberXenon Lamp Weather Resistance Test Chamber, Xenon Lamp Aging Test ChamberInsulation Resistance Meter
  • $item.Title
  • $item.Title

Insulation Resistance Meter

Wuhan Goldhome Hipot Electrical Co., Ltd.

Model
Nature of the Manufacturer
Manufacturer
Product Category
Xenon Lamp Weather Resistance Test Chamber, Xenon Lamp Aging Test Chamber
Place of Origin
HuBei, WuHan
I. Technical specifications safety specifications IEC 61010-1 CAT.IV 600V pollution level 2 IEC 61326 EMC specifications: electrical equipment for testing, control and inspection IEC60529 IP64 (box closed) The safety performance of insulation resistance meter conforms to iec61010-1:2001. This...


I. Technical specifications

safety specifications

IEC 61010-1 CAT.IV 600V pollution level 2

IEC 61326 EMC specifications: electrical equipment for testing, control and inspection

IEC60529 IP64 (box closed)

The safety performance of insulation resistance meter conforms to iec61010-1:2001.

This instrument complies with standard Q/WKD10.

Insulation resistance: 50M (between measuring line and housing)

2.withstand voltage: AC 10kV 50Hz 1min (between measuring line and housing)

3.operating temperature and humidity: -10℃ ~ +50℃ 85%RH

4.storage temperature and humidity: -15℃ ~ +55℃ 90%RH

5.charging power supply: 230V, 50/60 HZ

6.battery power supply: 16V lithium ion rechargeable battery 2600mAH or measurement while charging, does not affect the test accuracy.

7.size: 27 ×22 ×15cm

8.weight: 3kg

9.test voltage accuracy: 99% to 110% of nominal value

10.voltage measurement accuracy: 5%+10V

11.short circuit current: 7-10ma.

12.display mode: digital and analog pointer dual display.


details


II. Technical indicators

Features

Set voltage

Measuring range

Precision

Resolution

Insulation resistance value

250V

1 MΩ~10MΩ

±10%rdg±5dgt

0.01MΩ

10 MΩ~1000MΩ

±10%rdg±5dgt0.1MΩ

1GΩ~5GΩ

±20%rdg±5dgt0.01GΩ

500V

1 MΩ~10MΩ

±10%rdg±5dgt

0.01MΩ

10 MΩ~1000MΩ

±10%rdg±5dgt0.1MΩ

1GΩ~10GΩ

±20%rdg±5dgt0.01GΩ

1kV

1MΩ~10MΩ

±10%rdg±5dgt

0.01MΩ

10 MΩ~1000MΩ

±10%rdg±5dgt0.1MΩ

1GΩ~10GΩ

±10%rdg±5dgt0.01GΩ

10GΩ~100GΩ

±20%rdg±5dgt0.1GΩ

2.5kV

1 MΩ~10MΩ

±10%rdg±5dgt

0.01MΩ

10 MΩ~1000MΩ

±10%rdg±5dgt0.1MΩ

1 GΩ~10GΩ

±10%rdg±5dgt0.01GΩ

10 GΩ~200GΩ

±20%rdg±5dgt0.1GΩ

5kV

1 MΩ~10MΩ

±10%rdg±5dgt

0.01MΩ

10 MΩ~1000MΩ

±10%rdg±5dgt0.1MΩ

1 GΩ~10GΩ

±10%rdg±5dgt0.01GΩ

10 GΩ~500GΩ

±20%rdg±5dgt0.1GΩ

Set voltage

Open circuit/load voltage range

250v

-5%-+20%

500

-5%-+20%

1kV

-5%-+20%

2.5kV

-5%-+20%

5kV

-5%-+20%

Short circuit current

≥5mA

DAR、PI

0.01 ~9999.99±(1%RDG+1d)

Live monitoring

Cannot exceed AC 3kV


III. Instrument introduction

panel introduction

detail

Introduction to key and measurement status:

key and function description

"Power on and off" button: press the power button 2s instrument is in the power state (figure 2-1) :

At this time, the test line should be connected according to the instructions according to the requirements of the subject. The device "is self-checking" flashing, and the flashing stops the completion of self-checking (the device cannot start the measurement during self-checking). At this time, if the induced voltage of the tested equipment shows >2000v, the equipment cannot be started either. At this time, the measurement can only be started after cooperating with the "anti-interference insulation resistance suppression device" of the company's independent intellectual property rights.

Select the appropriate voltage by pressing the "voltage selection" button, such as the selected voltage 5000v (FIG. 4); Then press "start stop" (press once to start the work, and then press once to stop the work) button to start the work of the instrument, at this time there is high voltage output, pay attention to safety!

"Out v": The device under test is energized for other reasons before it is tested.

When the insulation resistance is connected to the test wire, if the test object is electrified or the induced voltage is caused by mutual inductance coupling, the Insulation Resistance Tester will alert the danger of electrification and indicate the electrification voltage, which can prevent the accident from happening Better ensure the safety of operators.

1. Due to not pay attention to the fault of the live equipment is considered as a power outage equipment.

2. In large substations above 110 kv, especially in 500 kv substations, the induced voltage is present in the power-off equipment due to mutual inductance and coupling.

3. For overhead lines, because of the increasing density of overhead line corridors, the coupling between lines can also produce fatal induced voltage. For lines with induced voltage, the test of insulation resistance is very important.

details 1

Method of use

1. use of G terminal (protective ring)

For basic insulation tests, where there is little surface leakage affecting measurements, it is not necessary to use shielding terminals. That is, insulators are clean and free of adverse current channels. However, during the cable test, there may be a surface leakage channel through the insulator due to moisture and dirt between the exposed cable and the skin. In this case the effects of this leakage need to be eliminated, especially under high pressure test. A bare wire may be tightly wound around the insulation and connected to shield terminal G through a third test wire.

2 battery level check

● built-in large capacity battery 2600mAH, when prompted battery voltage down, please timely charge, also can charge while measuring, do not affect the measurement accuracy.

● it takes about 8 hours for the internal battery of the instrument to be fully sufficient. When the battery voltage is about 13V, the battery power is insufficient. When the battery voltage is <13V, the instrument will display "battery voltage <13V", which needs to be charged immediately.

● in order to extend the life of the battery, the company develops intelligent battery management, which displays the battery voltage and peak voltage and charging time when the battery is fully charged.

3 display insulation parameters during test

In the test, the LCD display screen displays the current resistance value, test time, R15S, R60S, R10min insulation resistance and absorption ratio (R60S/R15S) and polarization index value (R10min/R1min) in chronological order. (note: when the high pressure is turned on, the previous group of data will be cleared and new data will be recorded.)

4 show test voltage

At the end of the test, the meter will automatically display the voltage value between L end and E end during the test, and observe the drop voltage value with load in real time according to the procedure.

5 leakage current detection function.

Real-time detection of leakage current changes with load visually reflects the insulation of test products. When the voltage rises to the required test voltage, the leakage current stays the same and decreases. Then the insulation is qualified. Otherwise, the insulation has problems.

6 automatic discharge function

Try to adopt advanced technology of high voltage discharge of capacitive rapid discharge, discharge the real-time measurement of discharge voltage (try test voltage to 0 v), for example: the sample (s) test voltage 5000 v, so when to stop testing discharge by discharge to 0 v, 5000 v (real-time visual display) real-time monitoring of discharge voltage, when the "charged" disappear, the operator can remove the operation.

7 display the capacitance value of the subject.



  Wuhan Goldhome Hi pot Electrical Co.,ltd(short for Goldhome Hi pot) was established in 2008, its predecessor was state-owned third industry enterprises, one of the earliest enterprises specially in develop, design and manufacture high voltage testing equipment in China.In 2016, merged with Wuhan Sang Electric Co., Ltd. , we realize advantageous compartmentalize and resources reorganization.Now it has become a high-tech enterprise integrating R&D, production, marketing installation and commissioning.1.our-historyOur FactoryGoldhome Hi pot is located in Huading Mould Industrial Park, Economic and Technical Development Zone, Wuhan City, Hubei Province, China, working area more than 4000 square meters.As a high-tech enterprise, we are supported by natural advantages from various research universities in Wuhan city. Goldhome Hi pot works closely with professors from State Grid Power Science Research Institute, Electrical Engineering Colleges of Wuhan University and other scientific research institutions, constantly improving technology and updating products . Now Goldhome Hi pot has more than 20 patented technologies, and many software Copyrights!2.our factory-1product and product applicationOur ProductOur advantage products included AC Resonant Test System, PD Free Test System, AC/DC Hi pot Tester, Primary Current Injection, VLF Hi pot Tester, transformer tester,impulse generator,Transformer oil tester,HV Switch gear Tester ,Insulation Tester,ground Resistance Tester,cable fault locator,relay test set,CT PT analyse,arr ester tester and sf6 gas analyzer,etc.Product ApplicationAll the performance indexes of above testing equipment can reach the leading level in China, widely used in power supply bureau, power plant, power construction, railway, petroleum, chemical industry, metallurgy, coal and other industries.In recent years,our factory continues to expand overseas markets, some competitive products are already exported to American and European countries, Africa, Middle East, etc , and well praised by customers.product applicationOur CertificateAll product process is strictly in accordance with international standards and power industry regulations. And the products are through the national, provincial power authorities testing, as well as CE certification! At present,0ur company has received ISO9001:2015 quality management system certification, ISO14001:2018 occupational health and safety management system certification, and ISO14001:2015 environmental management system certification,and also had got SGS certification.We has more than 20 patented technologies,such as The utility model patent of a frequency conversion series resonance test device,The utility model patent of Lightning impulse voltage testing equipment,The utility model patent of DC high voltage generator,The utility model patent of microcomputer relay protection tester,The utility model patent of High voltage switching characteristic tester., etc.4.certificateoverseas market & our serviceOverseas MarketOur products are sold to Europe, Asia, Africa, North and South America and Oceania, Middle East, etc.and are well received by customers.We had won the bids for the purchase of high-voltage no-partial discharge test equipment from the Polish state-owned insulator production plant, the Myanmar National Grid cable fault tester purchase project, and the high-voltage test equipment purchase project of a Russian power installation and test engineering company.We also sell to end customers, and a single device can also be sold. For example, there are power maintenance and installation companies in Indonesia, South Africa, Denmark, and South Korea, and universities and research institutions purchase and use our test equipment.At the same time, our sales targets also include agencies. At present, we already have cooperated with agents in Singapore, Israel, Mauritius , etc.We insist on providing customers with first-class products and first-class services with reliable product quality and perfect service team.5market-1Our service1.Strict factory testAll products will be assembled and test strictly accord with our product process standard. All qualified products will be issued factory release reports and certificate labels.Defect products or non-qualified products won’t be allowed to make deliver.2.Providing technical materialsDuring the product acceptance, we provide the related manual sheets, packing list,qualified certificate labels, factory test reports and other technical documents.3. Support technical guidanceWe also provide the training for the operators. Complete training includes the skilled operations of our equipment, maintenance and troubleshooting . it also ranges the commissioning and test of our products at site!After-sale service1.First-use responsibility systemAfter the product is delivered, the technician can guide the operation at site if the client requires, and be responsible for the first use of each part2.One year warrantyAll products warranty is 1year, life-time maintenance .During the warranty period, if any defects or damaged because of product’s quality, maintenance or replacement can be provided with free charge in order to let our client’s satisfied !3.TroubleshootingIf the troubleshooting is not difficult, and client can handle with it by themselves, we can offer the call-on line guide within 1 hour!If the troubleshooting is difficult to handle with for client, we can promise that the best solution can be provided within 24 hours!
Similar Product Recommend