Membership
Help
Flagsun (Suzhou) New Energy Co.,Ltd
Flagsun (Suzhou) New Energy Co.,Ltd

40W

40W

60W

60W
| light weight | Portable |
| Custom design | 5bb 9bb 10bb 11bb 12bb solar cells 5w-670w solar panels |
| Widely use | Camping,rv,motorhome,traveling,outdoor,street lights |
| Waterproof | Can also be used in harsh outdoor conditions |
| Eco friendly | New green energy,no pollution, emission reduction |
| Business | Hot sell over the world,we can provide factory price We have warehouse in vietem and european |
Combining this topic with practical applications, it is a kind of power generation equipment, which is widely used in field operations and
Provide power for small electrical equipment in the case of city power. The entire design process of solar power generation equipment should be guided by circuit energy-saving and high-efficiency.
Specific design content:
1. The overall plan of the controller: use the structural block diagram to explain the composition of the system and outline the functions of each part.
2. Parameter calculation and selection of solar energy and storage battery
3. The design of the solar panel charging interface: the electric energy is stored in the battery, and the current of the solar panel is relatively large and sometimes small relative to the rated value. It should receive and store as much external energy as possible.
4. DCDC and DCAC conversion circuit design: inverter power 50W.
5. Design of battery charging and discharging protection circuit: to prevent battery overcharging and overdischarging from affecting its service life
6. CPU minimum system design: use single-chip microcomputer or embedded controller for charge and discharge management.
7. Indication circuit: Use LCD screen and a small number of light-emitting diodes to indicate the current and voltage status of battery charging and discharging.
8. Software design: The control flow chart of each part of the system and the compilation of specific programs require modularization of the program. A brief function overview should be made before each part of the flow chart and program.