Membership
Help
Shanghai Yiying Crane Machinery Co., Ltd.
Shanghai Yiying Crane Machinery Co., Ltd.
product description

The permanent magnetic lifters are mainly used for lifting the steel plate and round steel, because of the light weight, ease of operation and powerful suction,
magnetic lifters are widely applied in ship engineering, warehouse, transportation and machinery manufacturing.
product parameters
| Model | Rated capacity(Ton) | Max tension(kg) | Size(mm) | Net weight(kg) | |||
|---|---|---|---|---|---|---|---|
| L | B | H | R | ||||
| YS-100 | 100 | 300 | 90 | 63 | 68 | 145 | 3 |
| YS-400 | 400 | 1200 | 160 | 95 | 180 | 160 | 11 |
| YS-600 | 600 | 1800 | 220 | 115 | 125 | 230 | 20 |
| YS-1000 | 1000 | 3000 | 260 | 145 | 145 | 280 | 40 |
| YS-1500 | 1500 | 3750 | 310 | 145 | 145 | 280 | 48 |
| YS-2000 | 2000 | 5000 | 340 | 160 | 165 | 410 | 60 |
| YS-3000 | 3000 | 7500 | 420 | 185 | 185 | 510 | 90 |
| YS-4000 | 4000 | 10500 | 480 | 200 | 200 | 510 | 120 |
| YS-5000 | 5000 | 15000 | 580 | 300 | 300 | 650 | 400 |
product advantages
1. Permanent magnetic lifter is widely used as lifting tools in factory terminals and warehouse.
2. Safe and reliable, easy to operate, can be used single or combined with other machines to move long and big magnetic iron steels.
3. Using high-performance permanent magnet, ensure the power and high safety.
4. With a "V" style design at the bottom of lifter, can lift both round steel and steel plate.
5. Maintain constant and reliable magnetism without electricity, residual magnetism approach naught.
6. The maximum pull-off force as 3.5 times as rated lifting force which contribute to improve the working conditions of loading operation and labor productivity.
7. The lifting have high resistance to demagnetization, the lifting value will keep constant and stable.



advantage of Shanghai Ying Crane
1, We get more than 3000 orders per month, some of them bought by the end user, we know what they care , quality is frist
2,every product we do test before shipment.It is 99%
3,we can finish one container within 5-7days
4,we have 3 facories in different city, near the sea port