Welcome Customer !

Membership

XwbooInstrumentationEnvironmental Test ChamberXenon Lamp Weather Resistance Test Chamber, Xenon Lamp Aging Test ChamberMegohmmeter Insulation Test Meter
  • $item.Title
  • $item.Title

Megohmmeter Insulation Test Meter

Wuhan Goldhome Hipot Electrical Co., Ltd.

Model
Nature of the Manufacturer
Manufacturer
Product Category
Xenon Lamp Weather Resistance Test Chamber, Xenon Lamp Aging Test Chamber
Place of Origin
HuBei, WuHan
HM2672 Anti-interference megohmmeter insulation test meter is research and manufacture to solve the evaluation of electrical insulation quality of HV transformers, motors, generators, long-distance high-voltage cables, tubular busbars, etc.
Summary


HM2672 Anti-interference megohmmeter insulation test meter is research and manufacture to solve the evaluation of electrical insulation quality of HV transformers, motors, generators, long-distance high-voltage cables, tubular busbars, etc. under strong interference from high-voltage substations and power plants. It is especially suitable for large-capacity over 110kv Test site with strong sexual interference.

The meter has the function of measuring separately, measuring absorbing ratio and polarization index, and can measure each value at one time. It is a kind of insulation resistance measuring instrument with convenient use, comprehensive function and wide measuring range.


Main technical performance


●Insulation resistance: 50M (between measuring circuit and shell)

●Withstand voltage: AC 10kV 50Hz 1min (between measuring circuit and shell)

●Working temperature and humidity: -10℃ ~ +50℃ 85%RH

●Storage temperature and humidity: -15℃ ~ +55℃ 90%RH

● Charging power supply: 220V±10%, 50/60 HZ

● Battery power supply: 16V Li-ion rechargeable battery, 2600mAH or charging while measuring,without affecting the test accuracy.

● Size:27 ×22 ×15cm

● Weight: 3kg

● Test voltage accuracy: 99% to 110% of the nominal value

● Voltage measurement accuracy: 5%+10V

● Short circuit current: 7-10mA.

●Display mode: digital and analog pointer dual display.


Test range and accuracy


Rated voltage(kV)0.25、 0.5、1、2.5、5(10)(kv)
Measurement voltage(kV)Rated voltage×(1±10%)Load resistance is not less than 1% of range
The minimum error is 10% RDGrange(0.0001~50)GW/5kV
(0.0001~50)GW/2.5kV
(0.0001~50)GW/1kV
(0.0001~20)GW/0.5kV
(0.0001~20)GW/0.25kV
The maximum error is
20% RDG range
(50~4000)GW/5kV
(50~1000)GW/2.5kV
(50~400)GW/1kV
(20~200)GW/0.5kV
(20~100)GW/0.25kV
Output short circuit current≥10mA
Cx0.01-9.99uF 20%±5rgd
Absorption ratio, polarization index
Measuring range
Measurement range: 0.01 ~9999.99
Max error: ±(1%RDG+1d)
Display output voltage error±(3%RDG + 1d)


1




Main feature


● Accordance with IEC standards, output voltage:250v、500v 1000v、2500v、5000v.

● The Anti-interference megohmmeter insulation test meter has an automatic calibration function,automatically calibrate accuracy before test.

●equipped with self-check function can automatically detect if the measured circuit is normal.

●With the function of measuring the live voltage of the actual test goods , can test leakage current,automatic discharge.

● R15S, R60S and R10min values can be automatically measured and saved, automatically display polarization index (PI), inductance absorption ratio (DAR) and test time .

●Superior anti-interference performance,even if the interference current reaches 2mA,The HMV insulation resistance tester still guarantees test accuracy.

●double display with analog pointer and the digital, the number reflects the accuracy of the test object insulation resistance , and the analog pointer can reflect the dynamic change of the insulation resistance during the test.

●Short circuit protection, the test is stopped when the leakage current is large in the short circuit state.


Precautions for use


●Before the test connection, it must be ensured that the test product has been completely discharged and isolated.

●The instrument must be operated by suitably trained personnel.

●When testing, never touch the test circuit.

●Confirm that the tested product is safely grounded, and the tested product does not carry strong current.

●Confirm that the E terminal (grounding terminal) of the meter is grounded.

●Confirm that the battery is sufficiently charged. If the battery is undervoltage, it will not be able to boot.

●Press the on/off button for about 2 seconds, the LCD screen displays the working interface.

●The LCD screen displays "self-checking" and it is in the state of "waiting for measurement" after the self-checking is completed.

●Voltage selection button to select the voltage range, touch the "Start/Stop" button, the high voltage is turned on, the LCD screen displays "Measuring", there is high voltage output at the E and L terminals of the meter, and the buzzer sounds continuously. Please pay attention to safety ! Press the "Start/Stop" button again to stop the measurement and display "Waiting for measurement"

●After the test is completed, touch the "Start/Stop" button, and press the Start/Stop button to stop boosting. When the automatic discharge of the instrument is less than 0v (after the danger of electrification disappears), the wire can be disconnected.


Attention


●The meter should be stored in about 50% charged state of the battery. If the battery is over-discharged and under-voltage, it should be charged in time, otherwise it cannot be turned on.

●In testing and verification, the test line configured with the meter should be used to ensure normal operation.

●Always keep the instrument and test wire clean.

●Don't be exposed to damp, rain, sun or falling.

●After the instrument measures the high-capacity sample, the user must discharge the sample again according to the relevant high-voltage operating regulations.


Faults and phenomena


Frequent phenomenon Description and disposal
There is no display on the LCD screen after power on.Long press the power button
If the battery power is insufficient, plug in AC220V to charge the battery, the power indicator should be flashing, and the power indicator should be on when charging is complete.
No data is displayed during the test.Use a multimeter to check whether the L and E test leads are normal.
After L and E are short-circuited, it will display 0, open circuit display >10T
There may be poor contact between the test line and the tested product.
The insulation resistance value of the tested product exceeds the upper limit of the meter range or is open.
The test data is extremely unstable or has low credibility.Check whether the test product is safely grounded, and confirm that the test product is not live.
Check whether the G terminal (protection ring) is connected reliably and effectively.
(In order to obtain more accurate test data, the battery voltage display has a decimal point display.
The voltage value should not fluctuate too much, otherwise there will be errors in the test, please charge in time)


FAQ


Q1.How long is your delivery time ?

It depends on you product .

Conventional products we have it in stock,it can be delivery within 3-5days.

customized product can be delivery within 10-15days .

Q2. Do you accept OEM order ?

Yes, OEM & ODM are acceptable.

Q3. What's your payment terms?

We accept T/T(50% down payment and 50% paid before delivery), Paypal, Western union, Money Gram and via Alibaba Insurance(Credit card(Visa,Master),E-checking,TT)

Q4. What's the minimum order quantity? How long is the delivery time?

Both MOQ and delivery time need to refer to the specific products. Usually, we have stock for our brand products, please contact our sales for details.

Q5. Do you test all your goods before delivery?

A: Yes, we have 99% test before delivery

Q6. Why I choose you?

A. We are manufacturer of kinds of electric test equipment . You can buy what you need here at very reasonable price.

B. With 20years experience in this filed, we have the ability to provide good service and products in low cost.

C. Adequate inventory to make sure that our clients can obtain goods in a short period.

  Wuhan Goldhome Hi pot Electrical Co.,ltd(short for Goldhome Hi pot) was established in 2008, its predecessor was state-owned third industry enterprises, one of the earliest enterprises specially in develop, design and manufacture high voltage testing equipment in China.In 2016, merged with Wuhan Sang Electric Co., Ltd. , we realize advantageous compartmentalize and resources reorganization.Now it has become a high-tech enterprise integrating R&D, production, marketing installation and commissioning.1.our-historyOur FactoryGoldhome Hi pot is located in Huading Mould Industrial Park, Economic and Technical Development Zone, Wuhan City, Hubei Province, China, working area more than 4000 square meters.As a high-tech enterprise, we are supported by natural advantages from various research universities in Wuhan city. Goldhome Hi pot works closely with professors from State Grid Power Science Research Institute, Electrical Engineering Colleges of Wuhan University and other scientific research institutions, constantly improving technology and updating products . Now Goldhome Hi pot has more than 20 patented technologies, and many software Copyrights!2.our factory-1product and product applicationOur ProductOur advantage products included AC Resonant Test System, PD Free Test System, AC/DC Hi pot Tester, Primary Current Injection, VLF Hi pot Tester, transformer tester,impulse generator,Transformer oil tester,HV Switch gear Tester ,Insulation Tester,ground Resistance Tester,cable fault locator,relay test set,CT PT analyse,arr ester tester and sf6 gas analyzer,etc.Product ApplicationAll the performance indexes of above testing equipment can reach the leading level in China, widely used in power supply bureau, power plant, power construction, railway, petroleum, chemical industry, metallurgy, coal and other industries.In recent years,our factory continues to expand overseas markets, some competitive products are already exported to American and European countries, Africa, Middle East, etc , and well praised by customers.product applicationOur CertificateAll product process is strictly in accordance with international standards and power industry regulations. And the products are through the national, provincial power authorities testing, as well as CE certification! At present,0ur company has received ISO9001:2015 quality management system certification, ISO14001:2018 occupational health and safety management system certification, and ISO14001:2015 environmental management system certification,and also had got SGS certification.We has more than 20 patented technologies,such as The utility model patent of a frequency conversion series resonance test device,The utility model patent of Lightning impulse voltage testing equipment,The utility model patent of DC high voltage generator,The utility model patent of microcomputer relay protection tester,The utility model patent of High voltage switching characteristic tester., etc.4.certificateoverseas market & our serviceOverseas MarketOur products are sold to Europe, Asia, Africa, North and South America and Oceania, Middle East, etc.and are well received by customers.We had won the bids for the purchase of high-voltage no-partial discharge test equipment from the Polish state-owned insulator production plant, the Myanmar National Grid cable fault tester purchase project, and the high-voltage test equipment purchase project of a Russian power installation and test engineering company.We also sell to end customers, and a single device can also be sold. For example, there are power maintenance and installation companies in Indonesia, South Africa, Denmark, and South Korea, and universities and research institutions purchase and use our test equipment.At the same time, our sales targets also include agencies. At present, we already have cooperated with agents in Singapore, Israel, Mauritius , etc.We insist on providing customers with first-class products and first-class services with reliable product quality and perfect service team.5market-1Our service1.Strict factory testAll products will be assembled and test strictly accord with our product process standard. All qualified products will be issued factory release reports and certificate labels.Defect products or non-qualified products won’t be allowed to make deliver.2.Providing technical materialsDuring the product acceptance, we provide the related manual sheets, packing list,qualified certificate labels, factory test reports and other technical documents.3. Support technical guidanceWe also provide the training for the operators. Complete training includes the skilled operations of our equipment, maintenance and troubleshooting . it also ranges the commissioning and test of our products at site!After-sale service1.First-use responsibility systemAfter the product is delivered, the technician can guide the operation at site if the client requires, and be responsible for the first use of each part2.One year warrantyAll products warranty is 1year, life-time maintenance .During the warranty period, if any defects or damaged because of product’s quality, maintenance or replacement can be provided with free charge in order to let our client’s satisfied !3.TroubleshootingIf the troubleshooting is not difficult, and client can handle with it by themselves, we can offer the call-on line guide within 1 hour!If the troubleshooting is difficult to handle with for client, we can promise that the best solution can be provided within 24 hours!
Similar Product Recommend