Product description
ZW20 series circuit breaker is the intelligent power distribution equipment which to solve the problems listed below:
1.Failures in T branch of overhead line cause the whole distribution off
2.Short circuits in the user end cause the whole distribution line off Working with our CMS-4000 distribution automation system to switch off the short circuit failures and earthing failures automatically. They can monitor the line status, realize remote control, telemeter, remote signal and remote regulating, and are the ideal intelligent distribution automation circuit breaker.
1.Altitude: ≤3000 Meters
2.Enviroment temperature: outdoor -40ºC ~ +40ºC the daily temperature difference is 25ºC
3.Wind speed: ≤35m/s
4. Location is without inflammable substances, explusives, rustry chemicals and strenuous vibaration
| NO. | Item | Unit | Numeric | ||
| 1 | Nominal Voltage | KV | 12 | ||
| 2 | Rated Frequency | HZ | 50 | ||
| 3 | Rated Current | A | 630 | ||
| 4 | Rated Short-circuit Breaking Current | KA | 20 | ||
| 5 | Dynamic Stability rated current | KA | 50 | ||
| 6 | RMS/Rated the rmal stabilization | KA/S | 20/4 | ||
| 7 | Mechanism life | Times | 10000 | ||
| 8 | Rated short-circuit closing breaking Number | Times | 30 | ||
| 9 | Rated operating sequence | O-0.3s-CO-180s-CO | |||
| 10 | Rated breaking current number | Tmes | 10000 | ||
| 11 | Rated short-circuit close-open current | KA | 50 | ||
| 12 | Rated insulation level | KV | Short Power-frequency withstand | Thunder shocking | |
| PE | 42/34 | 75 | |||
| PP | 42/34 | 75 | |||
| Fracture | 48/34 | 85 | |||
| Assist | 2 | ||||
| 13 | SF6 rated pressure (20 spend pressure) | MPa | 0.01 | ||
| 14 | Rated short-circuit closing breaking Number | T | 30 | ||
| 15 | Rated short-circuit cut-off current's DC component | %dc | 51.3 | ||
our service
1.Pre sale service
a. make technical solution
b. send quotation, technical data sheet and drawing
c. prepare power transmission plan, testing plan and shipment plan
2. In sale service
a. supervise the manufacturing schedule totally in accordance with the plan
b. send photos to customer during every manufacturing process(hold point)
c. inform the customer one week before testing.
3. After sale service
a. installation and commissioning, training the workers
b. quick response within 12 hours any time