Welcome Customer !

Membership

XwbooElectrical & ElectronicsVoltage detectorVoltage detector Partial Discharge Monitor
  • $item.Title
  • $item.Title

Partial Discharge Monitor

Wuhan Goldhome Hipot Electrical Co., Ltd.

Model
Nature of the Manufacturer
Manufacturer
Product Category
Voltage detector
Place of Origin
HuBei, WuHan

Wuhan Goldhome Hipot Electrical Co., Ltd.

Contact

Phone

13720185294

Fax

Related categories
The partial discharge monitor is based on many years of experience in partial discharge detection by our companys technicians, which is suitable for online partial discharge detection and positioning of high-voltage equipment. The system is equipped with composite TEV sensors, ultra-high...
I. Overview


The partial discharge monitor is based on many years of experience in partial discharge detection by our company's technicians, which is suitable for online partial discharge detection and positioning of high-voltage equipment.

The system is equipped with composite TEV sensors, ultra-high frequency sensors, high-frequency current transformers and high-sensitivity ultrasonic sensors to collect partial discharge signals inside high-voltage equipment. The system uses multi-level detection and frequency reduction technology to reduce the frequency of the discharge signal. At the same time, it uses a high-speed AD conversion circuit to complete the digitization of the signal. It also uses digital signal processing, adaptive filtering and other interference signal processing methods to ensure the reliability of the detected data. By collecting different signals generated by internal partial discharges of different high-voltage equipment, the operating status of the equipment can be quickly charged. The instrument can be installed and tested in the operating state of the equipment, and has no impact on the normal operation of the equipment. It is convenient for the staff to evaluate the operating state of the switchgear in time, and greatly improves the reliability, safety and effectiveness of the equipment operation.

The partial discharge monitor consists of the tester host, TEV sensor, ultrasonic sensor, high frequency current transformer, ultra high frequency sensor and connecting wire.


II. Instrument technical indicators


1 Scope of application

It is suitable for on-line detection and positioning of partial discharge of switch cabinets, transformers and GIS.

2 Use environment

Altitude: ≤3000m

Ambient temperature: -20~60℃

Relative humidity: ≤95%

3 Technical parameters

Instrument measurement parameter requirements

(1) TEV measurement

Sensor: capacitive; measuring range: 0~60dBmV;

Resolution: 1dB; Error: ±1dB;

Detection bandwidth: 5~70MHz; Maximum pulse/period: 655;

Threshold adjustment range: 3~57dB.

(2) High frequency current transformer

Detection frequency band: 10kHz~30MHz Signal transmission method: 50Ω coaxial cable

Detection sensitivity: 10pC

(3) Ultrasonic sensor:

Measurement range: -7dBμV~68 dBμV; Resolution: 1dB;

Error: ±1dB; Sensor sensitivity: -65dB (0dB = 1volt/μbar effective value SPL);

Sensor center frequency: 20~50kHz; Sensor diameter: no more than 50mm;

Heterodyne frequency: 38.4kHz.

(4) UHF sensor

Detection frequency band: 300MHz~1.5GHz Signal transmission method: 50Ω coaxial cable

Detection sensitivity: 1dB gain: >65dbm

Hardware requirements

Shell: It has a protective shell, and the protection level should reach or be better than IP53;

Connector: earphone jack, low-voltage DC charger input, external ultrasonic sensor input;

Host weight: not more than 3kg;

Display screen: LED display, and can display battery status.

Power supply requirements

Internal battery: equipped with rechargeable battery, with automatic shutdown function when the battery voltage is low;

Battery continuous working time: more than 6 hours in single-channel mode, more than 3 hours in multi-channel mode;

Battery charging: It can be charged with 220V power frequency power supply, and the charging time is not more than 8 hours;

Battery charger protection level: IP54.


III. Introduction to the host panel


2

partial discharge monitor Host front panel


The front panel of the partial discharge monitor host is divided into several functional areas, which are marked according to the above icons:


1. Waveform display area

2. F1~F5: Menu button

3. Power indicator

4. MEAS: Measurement menu

5. AUTORANGE: Automatic AUTO

6. MENU OFF: Close the menu option

7. MENU: Menu button

8. AUTO: Automatic setting button

9. RUN/STOP: start/stop

10. Arrow keys

11. TRIG: Trigger menu

12. LEVEL: Adjust the trigger level

13. TIME/DIV: Time base

14. POSITION: Adjust the horizontal trigger position

15. HORI: Horizontal Menu

16. VERTICAL: Adjust the vertical position

17. VOLTS: Voltage range

18. Power switch

19. REF: REF menu

20. MATH: MATH function key

21. CH2: Display the CH2 menu

22. CH1: Display the CH1 menu

23. UTILITY: Accessibility

24. SAVE RECALL: save/recall

25. RECORDER: Multimeter trend chart, oscilloscope trend chart, waveform recorder

26. SCOPE/DMM: Function interface switch button, switch to the multimeter signal source interface

27. CURSOR: Cursor measurement


IV.Maintain


1. Daily maintenance

When storing or placing the main unit, do not expose the LCD display to direct sunlight for a long time.

Note: To avoid damaging the host or sensor, do not place it in mist, liquid or solvent.

2. Clean

According to the requirements of operating conditions, check the host and sensor frequently. Please clean the outer surface of the instrument according to the following steps:

1) Use a lint-free rag to remove the floating dust outside the host and sensor. Please be very careful to avoid scratching the clean filter material of the display.

2) Use a soft cloth dampened with water to clean the host. For more thorough cleaning, use 75% isopropanol in water.

Note: To avoid damaging the surface of the host or sensor, do not use any corrosive reagents or chemical cleaning reagents.


  Wuhan Goldhome Hi pot Electrical Co.,ltd(short for Goldhome Hi pot) was established in 2008, its predecessor was state-owned third industry enterprises, one of the earliest enterprises specially in develop, design and manufacture high voltage testing equipment in China.In 2016, merged with Wuhan Sang Electric Co., Ltd. , we realize advantageous compartmentalize and resources reorganization.Now it has become a high-tech enterprise integrating R&D, production, marketing installation and commissioning.1.our-historyOur FactoryGoldhome Hi pot is located in Huading Mould Industrial Park, Economic and Technical Development Zone, Wuhan City, Hubei Province, China, working area more than 4000 square meters.As a high-tech enterprise, we are supported by natural advantages from various research universities in Wuhan city. Goldhome Hi pot works closely with professors from State Grid Power Science Research Institute, Electrical Engineering Colleges of Wuhan University and other scientific research institutions, constantly improving technology and updating products . Now Goldhome Hi pot has more than 20 patented technologies, and many software Copyrights!2.our factory-1product and product applicationOur ProductOur advantage products included AC Resonant Test System, PD Free Test System, AC/DC Hi pot Tester, Primary Current Injection, VLF Hi pot Tester, transformer tester,impulse generator,Transformer oil tester,HV Switch gear Tester ,Insulation Tester,ground Resistance Tester,cable fault locator,relay test set,CT PT analyse,arr ester tester and sf6 gas analyzer,etc.Product ApplicationAll the performance indexes of above testing equipment can reach the leading level in China, widely used in power supply bureau, power plant, power construction, railway, petroleum, chemical industry, metallurgy, coal and other industries.In recent years,our factory continues to expand overseas markets, some competitive products are already exported to American and European countries, Africa, Middle East, etc , and well praised by customers.product applicationOur CertificateAll product process is strictly in accordance with international standards and power industry regulations. And the products are through the national, provincial power authorities testing, as well as CE certification! At present,0ur company has received ISO9001:2015 quality management system certification, ISO14001:2018 occupational health and safety management system certification, and ISO14001:2015 environmental management system certification,and also had got SGS certification.We has more than 20 patented technologies,such as The utility model patent of a frequency conversion series resonance test device,The utility model patent of Lightning impulse voltage testing equipment,The utility model patent of DC high voltage generator,The utility model patent of microcomputer relay protection tester,The utility model patent of High voltage switching characteristic tester., etc.4.certificateoverseas market & our serviceOverseas MarketOur products are sold to Europe, Asia, Africa, North and South America and Oceania, Middle East, etc.and are well received by customers.We had won the bids for the purchase of high-voltage no-partial discharge test equipment from the Polish state-owned insulator production plant, the Myanmar National Grid cable fault tester purchase project, and the high-voltage test equipment purchase project of a Russian power installation and test engineering company.We also sell to end customers, and a single device can also be sold. For example, there are power maintenance and installation companies in Indonesia, South Africa, Denmark, and South Korea, and universities and research institutions purchase and use our test equipment.At the same time, our sales targets also include agencies. At present, we already have cooperated with agents in Singapore, Israel, Mauritius , etc.We insist on providing customers with first-class products and first-class services with reliable product quality and perfect service team.5market-1Our service1.Strict factory testAll products will be assembled and test strictly accord with our product process standard. All qualified products will be issued factory release reports and certificate labels.Defect products or non-qualified products won’t be allowed to make deliver.2.Providing technical materialsDuring the product acceptance, we provide the related manual sheets, packing list,qualified certificate labels, factory test reports and other technical documents.3. Support technical guidanceWe also provide the training for the operators. Complete training includes the skilled operations of our equipment, maintenance and troubleshooting . it also ranges the commissioning and test of our products at site!After-sale service1.First-use responsibility systemAfter the product is delivered, the technician can guide the operation at site if the client requires, and be responsible for the first use of each part2.One year warrantyAll products warranty is 1year, life-time maintenance .During the warranty period, if any defects or damaged because of product’s quality, maintenance or replacement can be provided with free charge in order to let our client’s satisfied !3.TroubleshootingIf the troubleshooting is not difficult, and client can handle with it by themselves, we can offer the call-on line guide within 1 hour!If the troubleshooting is difficult to handle with for client, we can promise that the best solution can be provided within 24 hours!
Similar Product Recommend