Welcome Customer !

Membership

XwbooInstrumentationTesting MachineTransformer Testing MachineThree Phase AC Hipot Tester
  • $item.Title
  • $item.Title

Three Phase AC Hipot Tester

Wuhan Goldhome Hipot Electrical Co., Ltd.

Model
Nature of the Manufacturer
Manufacturer
Product Category
Transformer Testing Machine
Place of Origin
HuBei, WuHan
The structure of the three Phase AC hipot tester is a divided structure, which consists of two parts: a console and a testing transformer. This three Phase AC hipot tester can realize measuring, monitoring and operating functions through connecting the HV output terminal of the testing...

I. Overview


The structure of the three Phase AC hipot tester is a divided structure, which consists of two

parts: a console and a testing transformer.

This three Phase AC hipot tester can realize measuring, monitoring and operating functions through

connecting the HV output terminal of the testing transformer to the testing object.


II. Main Components and Parameters


(Take the three Phase AC hipot tester of 10kVA/50kV specification as an example, other

specifications can be customized)

1.Oil-filled Testing transformer

--Model No.: HM-YDJ-10kVA/50kV

Input voltage:0~400V/Three phase

Input current:0~14.4A

Rated capacity:10kVA

Output voltage:0~50kV/line voltage

Output current:0~0.11A

CT:HL1-20A/5A

Duty time:≤5mins

Cooling method:oil circulation


2.Manual console

--Model No.: HM-XC-10kVA

Input voltage:380V/Three phase

Rated capacity:10kVA

Input current:15 A

Output voltage:0~400V

Output current:14.4A

Current output indicator:14.4A(it equals low voltage side input current)

High voltage voltage output indicator:50kV(It equals the testing transformer high voltage output)

Meter accuracy:1.5 class

Over-current setting:0~20A(To protect low voltage input of three-phase test transformer)

Overcurrent bounce release time:7mS

Timer Range :0~999S、M、H can be switched to

Cooling method:Natural cooling


details-


Expand knowledge



What is the purpose of the insulation withstand voltage test?


Withstand voltage test refers to the


test of the withstand voltage capability of various electrical devices, insulating materials and


insulating structures. Without damaging the performance of the insulating material, the process of


applying a high voltage to the insulating material or insulating structure is called a withstand


voltage test. Generally speaking, the primary purpose of the withstand voltage test is to check


the insulation's ability to withstand working voltage or overvoltage, and then check whether the


insulation performance of the product equipment meets the safety regulations.


The basic principle


of the withstand voltage test: apply a higher voltage than the normal working voltage to the


insulator of the device under test, and continue for a regular moment. If the insulation in


between is good enough, the voltage applied to it will only be small Leakage current. If an


insulator of a device under test maintains its leakage current within a regular range at a regular


time, it can be determined that the device under test can operate safely under normal operating


conditions. When the withstand voltage test is performed, the test product has different technical


specifications, and the measurement specifications are also different. For general tested


equipment, the withstand voltage test is to measure the leakage current value between the live


wire and the case. The basic rule is: double the working voltage of the tested object plus 1000V


as the test standard voltage. The test voltage of some products may be higher than this rule


value. According to the rules of IEC61010, the test voltage must gradually rise to the required


test voltage value (such as 5kV, etc.) within 5s to ensure that the test voltage value is stably


applied to the tested insulator for no less than 5s, and the leakage current of the tested circuit


at this moment Comparing the value with the leakage current threshold of the specification rules,


it can be judged whether the insulation performance of the tested product meets the specification.


After the test is over, the test voltage must gradually drop to zero within a regular time.


Why is it necessary to insulate after withstand voltage? The difference between withstand voltage


and insulation


focus on

It should be insulated first, and then withstand voltage. Because the


withstand voltage is a destructive test, you must first ensure that there is no problem with the


equipment insulation, and then hit the withstand voltage to prevent unnecessary burning of the


electrical equipment.


The difference between withstand voltage and insulation:


1. Different


definitions


Withstand voltage: The puncture test is one of the main methods for testing electrical


appliances, electrical equipment, electrical installations, electrical circuits, and electrical


safety appliances, etc., to withstand overvoltage.


Insulation: During operation, electrical


equipment is always under the influence of various external factors, and its performance will


continue to change. These external factors mainly include external electric field, environment,


high voltage, corrosion and machinery, etc.


Under the influence of these unfavorable factors, power


equipment is more prone to unpredictable failures, and in serious cases, power operation will be


interrupted. Therefore, the high-voltage electrical equipment in the power system should be


insulated in advance before it is put into operation to ensure the safe and stable operation of


the power system.


2. Different test methods


Pressure resistance: hydraulic test, pneumatic test.


Insulation: According to the voltage level during the test, the insulation test is divided into


insulation characteristic test and insulation withstand voltage test. For equipment to perform


diagnosis and testing in the event of a power failure, the above-mentioned non-destructive test


and withstand voltage AC test can be used, and the destructive test can only be implemented after


the non-destructive test is completed.




3. Different voltages


Withstand voltage: The insulation


resistance is measured with an insulation resistance tester (below 10000V) or an insulation shaker


(below 2500V). Because the test voltage is relatively low, many insulation defects are not easy to


be found.


Insulation: With a high test voltage in the withstand voltage test, it is easy to find


insulation defects in high-voltage equipment.


During the withstand voltage test, the possible reasons for the unqualified insulation of the


power equipment are:

(1) The insulation performance deteriorates. If the transformer oil enters


moisture, the solid insulation is damp, and the insulation is aging, it will cause the insulation


performance to decline, and it will fail in the withstand voltage test.

(2) The test method and


voltage measurement method are incorrect. For example, in the transformer test, the non-tested


winding end is not grounded, and the non-tested winding may discharge to the ground, which is


misjudged as unqualified. In addition, when testing large-capacity samples, the voltage is still


measured on the low-voltage side. Due to the uplift effect, the voltage actually loaded on the


test product exceeds the test voltage, which causes the test product to breakdown and is misjudged


as unqualified.

(3) The atmospheric conditions that affect the insulation characteristics are not


properly considered. Since air pressure, temperature and humidity have a certain influence on


spark discharge voltage and breakdown voltage, if these factors are not considered, it may lead to


the conclusion that the equipment is unqualified.

Article link: Chemical Instrument Network




What is a converter station,

A converter station refers to a site established in a high-voltage direct current transmission system to complete the conversion of alternating current to direct current or to convert direct current to alternating current, and to meet the power system's requirements for safety, stability and power quality.


The main equipment or facilities that should be included in the converter station are: converter valves, converter transformers, smoothing reactors, AC switchgear, AC filters and AC reactive power compensation devices, DC switchgear, DC filters, control and Protective devices, grounding electrodes outside the station, and remote communication systems, etc.



The main function of the inverter is to perform AC-DC conversion. With the development from the initial mercury arc valve to the current electronic and light-controlled thyristor valve, the unit capacity of the inverter is increasing.

The converter transformer is the key equipment for AC/DC conversion in the converter station. Its grid side is connected to the AC field, and the valve side is connected to the converter. Therefore, the valve side windings need to bear the combined stress of AC and DC. Since the operation of a converter transformer is closely related to the non-linearity caused by the commutation of the converter, it has different characteristics from ordinary power transformers in terms of leakage reactance, insulation, harmonics, DC bias, on-load voltage regulation and testing.

The AC and DC filters provide ground return channels for the characteristic harmonics generated during the operation of the converter. During the operation of the converter, a large number of harmonics will be generated, and 40%-60% of the reactive power of the converter capacity will be consumed. Of course, the AC filter also provides reactive power while filtering. When the reactive power provided by the AC filter is not enough, special reactive power compensation equipment is required.

The smoothing reactor is also called a DC reactor. It is generally connected in series between the DC output end of each pole and the DC line to prevent the current from being interrupted during the operation of the converter to assist in commutation; at the same time, it prevents lightning and lightning on the DC side. Steep waves enter the valve hall, so that the converter valve is free from the stress of these overvoltages; it can smooth the ripples in the DC current. In addition, in the case of a DC short circuit, the smoothing reactor can also reduce the probability of commutation failure by limiting the rapid change of the current.

DC field equipment is mainly used to realize the conversion of DC operation mode, fault removal and maintenance isolation. The basic commutation unit is a commutation system that allows independent operation and commutation in a converter station. It mainly includes a converter transformer, a converter, corresponding AC and DC filters, and control and protection devices.


  Wuhan Goldhome Hi pot Electrical Co.,ltd(short for Goldhome Hi pot) was established in 2008, its predecessor was state-owned third industry enterprises, one of the earliest enterprises specially in develop, design and manufacture high voltage testing equipment in China.In 2016, merged with Wuhan Sang Electric Co., Ltd. , we realize advantageous compartmentalize and resources reorganization.Now it has become a high-tech enterprise integrating R&D, production, marketing installation and commissioning.1.our-historyOur FactoryGoldhome Hi pot is located in Huading Mould Industrial Park, Economic and Technical Development Zone, Wuhan City, Hubei Province, China, working area more than 4000 square meters.As a high-tech enterprise, we are supported by natural advantages from various research universities in Wuhan city. Goldhome Hi pot works closely with professors from State Grid Power Science Research Institute, Electrical Engineering Colleges of Wuhan University and other scientific research institutions, constantly improving technology and updating products . Now Goldhome Hi pot has more than 20 patented technologies, and many software Copyrights!2.our factory-1product and product applicationOur ProductOur advantage products included AC Resonant Test System, PD Free Test System, AC/DC Hi pot Tester, Primary Current Injection, VLF Hi pot Tester, transformer tester,impulse generator,Transformer oil tester,HV Switch gear Tester ,Insulation Tester,ground Resistance Tester,cable fault locator,relay test set,CT PT analyse,arr ester tester and sf6 gas analyzer,etc.Product ApplicationAll the performance indexes of above testing equipment can reach the leading level in China, widely used in power supply bureau, power plant, power construction, railway, petroleum, chemical industry, metallurgy, coal and other industries.In recent years,our factory continues to expand overseas markets, some competitive products are already exported to American and European countries, Africa, Middle East, etc , and well praised by customers.product applicationOur CertificateAll product process is strictly in accordance with international standards and power industry regulations. And the products are through the national, provincial power authorities testing, as well as CE certification! At present,0ur company has received ISO9001:2015 quality management system certification, ISO14001:2018 occupational health and safety management system certification, and ISO14001:2015 environmental management system certification,and also had got SGS certification.We has more than 20 patented technologies,such as The utility model patent of a frequency conversion series resonance test device,The utility model patent of Lightning impulse voltage testing equipment,The utility model patent of DC high voltage generator,The utility model patent of microcomputer relay protection tester,The utility model patent of High voltage switching characteristic tester., etc.4.certificateoverseas market & our serviceOverseas MarketOur products are sold to Europe, Asia, Africa, North and South America and Oceania, Middle East, etc.and are well received by customers.We had won the bids for the purchase of high-voltage no-partial discharge test equipment from the Polish state-owned insulator production plant, the Myanmar National Grid cable fault tester purchase project, and the high-voltage test equipment purchase project of a Russian power installation and test engineering company.We also sell to end customers, and a single device can also be sold. For example, there are power maintenance and installation companies in Indonesia, South Africa, Denmark, and South Korea, and universities and research institutions purchase and use our test equipment.At the same time, our sales targets also include agencies. At present, we already have cooperated with agents in Singapore, Israel, Mauritius , etc.We insist on providing customers with first-class products and first-class services with reliable product quality and perfect service team.5market-1Our service1.Strict factory testAll products will be assembled and test strictly accord with our product process standard. All qualified products will be issued factory release reports and certificate labels.Defect products or non-qualified products won’t be allowed to make deliver.2.Providing technical materialsDuring the product acceptance, we provide the related manual sheets, packing list,qualified certificate labels, factory test reports and other technical documents.3. Support technical guidanceWe also provide the training for the operators. Complete training includes the skilled operations of our equipment, maintenance and troubleshooting . it also ranges the commissioning and test of our products at site!After-sale service1.First-use responsibility systemAfter the product is delivered, the technician can guide the operation at site if the client requires, and be responsible for the first use of each part2.One year warrantyAll products warranty is 1year, life-time maintenance .During the warranty period, if any defects or damaged because of product’s quality, maintenance or replacement can be provided with free charge in order to let our client’s satisfied !3.TroubleshootingIf the troubleshooting is not difficult, and client can handle with it by themselves, we can offer the call-on line guide within 1 hour!If the troubleshooting is difficult to handle with for client, we can promise that the best solution can be provided within 24 hours!
Similar Product Recommend