As the core equipment of the temporary rental substation, 110kV transformer should not only meet the vehicle transportation performance of the whole machineunder various road conditions, but also meet the live operation requirements of the rental substation for several months or even one to two years, which is basically consistent with the operation characteristics of 110kV substation.As it is a leased substation, after the lease expires, it has to meet the requirements of multiple hoisting and transportation to other projects to continue the lease.
The main design innovations are as follows:
1. The innovative design scheme of combination of octagonal oil tank and 110kV triangle shaped bushing atthe end is adopted;
2. Innovative design scheme of adopting 110kV bushing lifting seat triangle shape without opening observationhole
3. Design scheme of adopting special installation mode of 66 kV neutral point bushing
4. On board installation scheme of octagonal oil conservator is adopted
5. Innovative design scheme of combination of welded butterfly valve and manifold is adopted
6. The design scheme of adopting 110kV three-phase outgoing line at the same end
7. Special body positioning scheme of 110kV on board transformer is adopted
8. Special measures for transportation protection of 110kV on board transformer capacitive bushing are adopted