Transformer DC Resistance Test Set

Wuhan Goldhome Hipot Electrical Co., Ltd.

Model
Nature of the Manufacturer
Manufacturer
Product Category
Transformer Testing Machine
Place of Origin
HuBei, WuHan
The measurement of DC resistance is a must-test item in the manufacture of inductive coils such as transformers, instrument transformer, reactors, electromagnetic operating mechanisms, etc., for semi-finished products, finished products factory test, installation, handover test, and preventive...
I、Product description


The measurement of DC resistance is a must-test item in the manufacture of inductive coils such as transformers, instrument transformer, reactors, electromagnetic operating mechanisms, etc., for semi-finished products, finished products factory test, installation, handover test, and preventive tests in the power sector. It can effectively discover the selection of inductive coils, Welding, loose joints, missing stocks, wire breaks and other manufacturing defects and hidden dangers after operation. In order to meet the needs of rapid measurement of the DC resistance of inductive coils, our company has developed a transformer DC resistance test set. The 32-bit ARM core is used as the processing core to control the whole machine and automatically complete functions such as self-calibration, steady flow judgment, data processing, resistance value display, etc., and can measure the DC resistance of various types of transformers and transformers. The instrument can directly use the internal battery to work, which greatly facilitates the use of field workers. It is an ideal device for measuring the DC resistance of transformer windings and high-power inductance equipment.

II、Safety measures


1. Be sure to read this manual carefully before using the transformer DC resistance test set.

2. The operator of the transformer DC resistance test set should have common sense in the use of general electrical equipment or instruments.

3. The transformer DC resistance test set can be used both indoors and outdoors, but it should be used in places such as rain, corrosive gas, excessive dust, high temperature, and direct sunlight.

4. The meter should avoid severe vibration.

5. The maintenance, care and adjustment of the instrument should be carried out by professionals.

6. After the test is completed, turn off the power first, and then remove the test wire.

7. When measuring the no-load voltage-regulating transformer, be sure to switch the gear after the discharge indication stops.

8. During the test, it is forbidden to move the test clip and the power supply line.

III、Performance characteristics and technical indicators


1. Output current and measurement:output current:0-10A,measurement:1mW-20KW.

current

measurement

current

measurement

10A

1mW-600mW

0.5A

2W-12W

5A

10mW-1.2W

0.2A

5W-30W

2A

20mW-3W

20mA

25W-300W

Note: Please use the automatic test function if the above range is exceeded.

1. Measurement accuracy: 0.2% Highest resolution: 0.1mW.

2. The instrument uses 65K true color LCD display, Chinese menu prompts, easy to operate.

3. With a large-capacity storage function, it can store 2000 test records.

4. Power supply: AC220V±10﹪,Or internal battery.

5. Operating temperature:﹣10℃~40℃.  

6. Working humidity:environment humidity<80%RH .  

7. Instrument weight:3㎏.


IV、system introduction


1. AC220 power plug,with switch and Safe warehouse  

2. Ground pole:Ground terminal

3. I+ I-:output current terminal

4. V+  V-:Sampling voltage terminal

1. “▲”、“▼”、“3”、“4”Select button,“3”reuse”“save” function.

2. Enter :Confirm the current selection, in the test state, press the confirm key to print the data.

3. Cancel key: Press this key to return the menu to the previous level.

4. Reset button: After the test is completed or the work is interrupted, press this button to return to the initial state.

9."Charge" the internal battery charge indicator of the instrument. When AC220 is plugged in, the "Charge" light will be on, indicating that the instrument battery is charging. The power-on main menu and current selection menu display battery power "Bat: 98%", as shown in Figure 2, Figure 3. When the power is lower than 40%, the number turns red, prompting to charge.


V、Test and operation method


1. Take out the special test lead that comes with the machine. The red and black test pliers are respectively clamped to the two sampling ends of the tested product, and rub the contact points forcefully, and the other end of the test line is connected to the terminal of the instrument. . (Note that the red and black colors correspond, and the thick wire is connected to the current terminal, and the thin wire is connected to the voltage terminal)

2. Turn on the instrument and enter the main menu after self-checking.

1) Select current:Enter the current selection menu.

Press the“▲”、“▼”、“5”、“4” key to cycle to select the output current,When measuring various windings of the same voltage level of the same transformer, the same current should be selected for testing to avoid test errors.After selecting the output current, press the "OK" key to enter the test state; after the value is stable, press the "3" key to save, and press the "OK" key to print the current data.

Note: To test the inductive load, you must wait for the discharge of the instrument before removing the test line or proceeding to the next test.

After the measurement is over, press "Cancel" to return to the previous menu.

2) Parameter setting: select the parameter setting menu

Winding material: After selecting this item, press the "▲" and "▼" keys to select the winding material: copper-aluminum.

Winding temperature: refers to the current temperature of the winding. After selecting this item, press "▲", "▼" to input the winding temperature.

Conversion temperature: After selecting this item, the instrument will automatically convert the test data to the input temperature of this item.

Brightness adjustment: After selecting this option, press "▲", "▼" to adjust the screen brightness to meet the display needs in various environments.

3) Browsing record: select the browsing record menu.

Press the "▲" and "▼" keys to browse the records, and press the "OK" key to print the current data. "003" indicates the total number of data stored, and "001" indicates that the current data is the latest data. The time below indicates the test date and time at that time.

4) Adjust the clock: select this menu.

Press the "3", "4" keys to move the cursor to select the item to be adjusted, and press the "▲", "▼" keys to adjust the current time and date. After the modification is completed, if you need to save, press the "OK" key to exit, if you don't need to save, press "Cancel" to exit.


VI、Precautions


1 Before use, the ground terminal of the instrument must be well grounded.

2 During the test, if you encounter a sudden external power failure, please do not remove the test line immediately. You can only remove it after the instrument is discharged.

3 For the test of on-load tapping transformer, it can be completed with one power supply. The program design of the instrument allows the tap switch to be reversed to the next tap after the measurement of a tap is completed, and the instrument will enter the measurement of the next tap.

4 For no-load tapping transformers, after a tapping test is completed, you need to press the cancel or reset button to discharge the system. After the discharge is completed, the switch can be reversed and the next measurement can be performed.

5 The internal battery of the instrument should be charged and discharged every three months. To extend battery life.

6 When the test fails to work normally due to insufficient battery, the power should be turned off immediately and recharged.


VII、Common problems and solutions


As shown in the table below

Common malfunctions

Failure analysis

No display at boot

1) The fuse of the power socket is damaged

2) The internal plug-in of the instrument is loose

3) Computer board failure

Display "over range or line not connected"

1) Power failure of the instrument

2) A/D board failure

3) The test line is in poor contact or does not form a loop


VIII、Packing List


Direct resistance meter host

Dedicated test cable

Three-core power cord

Ground wire

printer paper

Fuse

Packing List

Warranty Card

This page

Attach the last page

Operation Manual

Factory report


  Wuhan Goldhome Hi pot Electrical Co.,ltd(short for Goldhome Hi pot) was established in 2008, its predecessor was state-owned third industry enterprises, one of the earliest enterprises specially in develop, design and manufacture high voltage testing equipment in China.In 2016, merged with Wuhan Sang Electric Co., Ltd. , we realize advantageous compartmentalize and resources reorganization.Now it has become a high-tech enterprise integrating R&D, production, marketing installation and commissioning.1.our-historyOur FactoryGoldhome Hi pot is located in Huading Mould Industrial Park, Economic and Technical Development Zone, Wuhan City, Hubei Province, China, working area more than 4000 square meters.As a high-tech enterprise, we are supported by natural advantages from various research universities in Wuhan city. Goldhome Hi pot works closely with professors from State Grid Power Science Research Institute, Electrical Engineering Colleges of Wuhan University and other scientific research institutions, constantly improving technology and updating products . Now Goldhome Hi pot has more than 20 patented technologies, and many software Copyrights!2.our factory-1product and product applicationOur ProductOur advantage products included AC Resonant Test System, PD Free Test System, AC/DC Hi pot Tester, Primary Current Injection, VLF Hi pot Tester, transformer tester,impulse generator,Transformer oil tester,HV Switch gear Tester ,Insulation Tester,ground Resistance Tester,cable fault locator,relay test set,CT PT analyse,arr ester tester and sf6 gas analyzer,etc.Product ApplicationAll the performance indexes of above testing equipment can reach the leading level in China, widely used in power supply bureau, power plant, power construction, railway, petroleum, chemical industry, metallurgy, coal and other industries.In recent years,our factory continues to expand overseas markets, some competitive products are already exported to American and European countries, Africa, Middle East, etc , and well praised by customers.product applicationOur CertificateAll product process is strictly in accordance with international standards and power industry regulations. And the products are through the national, provincial power authorities testing, as well as CE certification! At present,0ur company has received ISO9001:2015 quality management system certification, ISO14001:2018 occupational health and safety management system certification, and ISO14001:2015 environmental management system certification,and also had got SGS certification.We has more than 20 patented technologies,such as The utility model patent of a frequency conversion series resonance test device,The utility model patent of Lightning impulse voltage testing equipment,The utility model patent of DC high voltage generator,The utility model patent of microcomputer relay protection tester,The utility model patent of High voltage switching characteristic tester., etc.4.certificateoverseas market & our serviceOverseas MarketOur products are sold to Europe, Asia, Africa, North and South America and Oceania, Middle East, etc.and are well received by customers.We had won the bids for the purchase of high-voltage no-partial discharge test equipment from the Polish state-owned insulator production plant, the Myanmar National Grid cable fault tester purchase project, and the high-voltage test equipment purchase project of a Russian power installation and test engineering company.We also sell to end customers, and a single device can also be sold. For example, there are power maintenance and installation companies in Indonesia, South Africa, Denmark, and South Korea, and universities and research institutions purchase and use our test equipment.At the same time, our sales targets also include agencies. At present, we already have cooperated with agents in Singapore, Israel, Mauritius , etc.We insist on providing customers with first-class products and first-class services with reliable product quality and perfect service team.5market-1Our service1.Strict factory testAll products will be assembled and test strictly accord with our product process standard. All qualified products will be issued factory release reports and certificate labels.Defect products or non-qualified products won’t be allowed to make deliver.2.Providing technical materialsDuring the product acceptance, we provide the related manual sheets, packing list,qualified certificate labels, factory test reports and other technical documents.3. Support technical guidanceWe also provide the training for the operators. Complete training includes the skilled operations of our equipment, maintenance and troubleshooting . it also ranges the commissioning and test of our products at site!After-sale service1.First-use responsibility systemAfter the product is delivered, the technician can guide the operation at site if the client requires, and be responsible for the first use of each part2.One year warrantyAll products warranty is 1year, life-time maintenance .During the warranty period, if any defects or damaged because of product’s quality, maintenance or replacement can be provided with free charge in order to let our client’s satisfied !3.TroubleshootingIf the troubleshooting is not difficult, and client can handle with it by themselves, we can offer the call-on line guide within 1 hour!If the troubleshooting is difficult to handle with for client, we can promise that the best solution can be provided within 24 hours!
Similar Product Recommend