Welcome Customer !

Membership

XwbooInstrumentationTesting MachineTransformer Testing MachineTransformer On Load Tap Switch Tester
  • $item.Title
  • $item.Title

Transformer On Load Tap Switch Tester

Wuhan Goldhome Hipot Electrical Co., Ltd.

Model
Nature of the Manufacturer
Manufacturer
Product Category
Transformer Testing Machine
Place of Origin
HuBei, WuHan
The Transformer On Load Tap Switch Tester can meet the requirements of on-load tap-changer action sequence and measuring switching time. It can realize the accurate measurement of the on-load tap-changers transition time, transition waveform, transition resistance, three-phase consistency...
I. Product description


The Transformer On Load Tap Switch Tester can meet the requirements of on-load tap-changer action sequence and measuring switching time. It can realize the accurate measurement of the on-load tap-changer's transition time, transition waveform, transition resistance, three-phase consistency and other parameters. It is an ideal equipment for testing on-load tap-changers. (The user is an on-load switch that adjusts the capacity, please inform in advance)


II. Main feature


1.Test Y0 Y △ transformer, the resistance value is directly displayed without conversion.

2. Humanized data analysis, which can automatically find out the faults in the middle of the waveform and mark them.

3.The display of the waveform is to automatically adjust the resistance value and the amplitude of the time according to the data sampled back.

4.The △-type transformer can show the three phases of the same period.

5.The instrument automatically judges single resistance and double resistance.

6.It can be tested with or without winding.

7.The four-terminal wiring method provides high-precision resistance measurement without wire compensation.

8.Continuous testing can be performed in the middle of the test, saving the time of transformer power failure.

9.The Transformer On Load Tap Switch Tester can survive word report, which is convenient for data management and query.

10.The Transformer On Load Tap Switch Tester is controlled by a small computer, equipped with 800×480 color LCD touch screen, high-speed printer, support for external mouse, easy to operate;

11.1000 sets of data can be automatically saved inside the instrument, or it can be saved with an external USB flash drive.

III. Technical parameter


1. Three-phase constant current source charging, charging current: 3A/1A gear; 0.6A/0.2A gear

2. The maximum voltage of the port: 24V

3. Maximum range of transition resistance: 100Ω

4. Transition resistance measurement range: 1A range: 0.4Ω~20Ω 0.2A range: 10Ω~100Ω

5. Waveform recording time length: 300ms

6. Sampling rate: 30k

7. Time resolution: 0.1ms

8. Resistance resolution: 0.1Ω

9. Accuracy: Transition resistance: ±5% of reading ±0.1Ω Transition time: ±0.5% of reading ±0.2mS

10. Operating temperature: -10~40℃ Operating relative humidity: <85%RH

IV. Technical parameter


1. Three-phase constant current source charging, charging current: 3A/1A gear; 0.6A/0.2A gear

2. The maximum voltage of the port: 24V

3. The maximum range of transition resistance: 100Ω

4. Transition resistance measurement range: 1A range: 0.4Ω~20Ω 0.2A range: 10Ω~100Ω

5. Waveform recording time length: 300ms

6. Sampling rate: 30k

7. Time resolution: 0.1ms

8. Resistance resolution: 0.1Ω

9. Accuracy: Transition resistance: ±5% of reading ±0.1Ω Transition time: ±0.5% of reading ±0.2mS

10. Operating temperature: -10~40℃ Operating relative humidity: <85%RH

V.Matters needing attention during operation


1. The instrument can be measured with a coil, but it is strictly forbidden to measure with electricity, and disconnect the connection of the test terminal;

2. When testing with windings, the non-test terminal of the transformer should be grounded in a three-phase short circuit, and the O terminal of the instrument should not be grounded;

3. For the on-load switch that has not been moved for a long time, the switch should be changed many times before the test to remove the oxide layer on the contact surface and the impurities between the contacts;

4. Before use, the ground terminal of the instrument must be connected to the ground wire;

5. It is not possible to connect more than two sets of wires together as one measurement, and the unused wires should be opened;

6. During the test, the test wire is not allowed to be removed;

7. After the test is over, turn off the instrument first and then remove all wiring.


  Wuhan Goldhome Hi pot Electrical Co.,ltd(short for Goldhome Hi pot) was established in 2008, its predecessor was state-owned third industry enterprises, one of the earliest enterprises specially in develop, design and manufacture high voltage testing equipment in China.In 2016, merged with Wuhan Sang Electric Co., Ltd. , we realize advantageous compartmentalize and resources reorganization.Now it has become a high-tech enterprise integrating R&D, production, marketing installation and commissioning.1.our-historyOur FactoryGoldhome Hi pot is located in Huading Mould Industrial Park, Economic and Technical Development Zone, Wuhan City, Hubei Province, China, working area more than 4000 square meters.As a high-tech enterprise, we are supported by natural advantages from various research universities in Wuhan city. Goldhome Hi pot works closely with professors from State Grid Power Science Research Institute, Electrical Engineering Colleges of Wuhan University and other scientific research institutions, constantly improving technology and updating products . Now Goldhome Hi pot has more than 20 patented technologies, and many software Copyrights!2.our factory-1product and product applicationOur ProductOur advantage products included AC Resonant Test System, PD Free Test System, AC/DC Hi pot Tester, Primary Current Injection, VLF Hi pot Tester, transformer tester,impulse generator,Transformer oil tester,HV Switch gear Tester ,Insulation Tester,ground Resistance Tester,cable fault locator,relay test set,CT PT analyse,arr ester tester and sf6 gas analyzer,etc.Product ApplicationAll the performance indexes of above testing equipment can reach the leading level in China, widely used in power supply bureau, power plant, power construction, railway, petroleum, chemical industry, metallurgy, coal and other industries.In recent years,our factory continues to expand overseas markets, some competitive products are already exported to American and European countries, Africa, Middle East, etc , and well praised by customers.product applicationOur CertificateAll product process is strictly in accordance with international standards and power industry regulations. And the products are through the national, provincial power authorities testing, as well as CE certification! At present,0ur company has received ISO9001:2015 quality management system certification, ISO14001:2018 occupational health and safety management system certification, and ISO14001:2015 environmental management system certification,and also had got SGS certification.We has more than 20 patented technologies,such as The utility model patent of a frequency conversion series resonance test device,The utility model patent of Lightning impulse voltage testing equipment,The utility model patent of DC high voltage generator,The utility model patent of microcomputer relay protection tester,The utility model patent of High voltage switching characteristic tester., etc.4.certificateoverseas market & our serviceOverseas MarketOur products are sold to Europe, Asia, Africa, North and South America and Oceania, Middle East, etc.and are well received by customers.We had won the bids for the purchase of high-voltage no-partial discharge test equipment from the Polish state-owned insulator production plant, the Myanmar National Grid cable fault tester purchase project, and the high-voltage test equipment purchase project of a Russian power installation and test engineering company.We also sell to end customers, and a single device can also be sold. For example, there are power maintenance and installation companies in Indonesia, South Africa, Denmark, and South Korea, and universities and research institutions purchase and use our test equipment.At the same time, our sales targets also include agencies. At present, we already have cooperated with agents in Singapore, Israel, Mauritius , etc.We insist on providing customers with first-class products and first-class services with reliable product quality and perfect service team.5market-1Our service1.Strict factory testAll products will be assembled and test strictly accord with our product process standard. All qualified products will be issued factory release reports and certificate labels.Defect products or non-qualified products won’t be allowed to make deliver.2.Providing technical materialsDuring the product acceptance, we provide the related manual sheets, packing list,qualified certificate labels, factory test reports and other technical documents.3. Support technical guidanceWe also provide the training for the operators. Complete training includes the skilled operations of our equipment, maintenance and troubleshooting . it also ranges the commissioning and test of our products at site!After-sale service1.First-use responsibility systemAfter the product is delivered, the technician can guide the operation at site if the client requires, and be responsible for the first use of each part2.One year warrantyAll products warranty is 1year, life-time maintenance .During the warranty period, if any defects or damaged because of product’s quality, maintenance or replacement can be provided with free charge in order to let our client’s satisfied !3.TroubleshootingIf the troubleshooting is not difficult, and client can handle with it by themselves, we can offer the call-on line guide within 1 hour!If the troubleshooting is difficult to handle with for client, we can promise that the best solution can be provided within 24 hours!
Similar Product Recommend