Welcome Customer !

Membership

XwbooInstrumentationTesting MachineTransformer Testing MachineTTR Tester
  • $item.Title
  • $item.Title

TTR Tester

Wuhan Goldhome Hipot Electrical Co., Ltd.

Model
Nature of the Manufacturer
Manufacturer
Product Category
Transformer Testing Machine
Place of Origin
HuBei, WuHan
Range: 0.9-10000Accuracy:±(reading*0.1%+2 words) (≤500)±(reading*0.2%+2 words) (500≤3000)±(reading*0.3%+2 words) (≤3000)Resolution0.9-9.9999 (0.0001)10-99.999 (0.001)100-999.99 (0.01)1000-9999.99 (0.1)10000 and above (1)Conditions of UsePower supply: built-in lithium battery or external charger, charger input 100-240VAC, 50Hz/60HzCharging voltage: 8.4VCharging current: ≤2A
I. Introduction


The TTR tester is an innovative product that overcomes the shortcomings of traditional variable-ratio bridge testing. The screen uses a large-screen high-resolution LCD display, and the power supply uses lithium batteries, which is convenient for on-site use.

The product is mainly used in the transformation ratio group test of transformers, and the transformation ratio polarity test of PT and CT. The test speed is fast and the accuracy is high.


II. Package contents


After receiving the TTR tester box, open the box and check for damage.

If the shipping box is damaged, or the cushioning material is indented, please notify the shipping company and the sales office.

Please check if you have received the following items in the tester package:

1 tester

1 set of test wires (one set for red and black)

1 charger (8.4V)

1 copy of the printed user manual

1 certificate of conformity and factory test report


III. Features of TTR tester


uLithium battery power supply or 220V AC power supply self-adaptive, one charge, can continuously test more than 100 transformer ratio groups, the test process is simple and convenient.

uBlind test function, that is, the transformation ratio and group test are performed when the high and low voltage connection mode is not known.

uIn addition to the test of conventional transformers, Z-type transformers, and PT samples, the CT ratio polarity test function is added, and the application field is wider.

uWide measuring range, high precision, the measurement range of transformation ratio can reach 10000, and the test accuracy is guaranteed to be 0.3% when the highest value is 10000.

uIt has complete protection functions such as reverse connection protection and output short-circuit protection.

u5.6-inch large industrial-grade high-brightness color LCD screen, the display is still clearly visible under strong sunlight.

uEquipped with thermal printer for easy data printing.

uWith local storage and USB storage, it is convenient for data storage.

IV. Technical Specifications


Range: 0.9-10000

Accuracy:

±(reading*0.1%+2 words) (≤500)

±(reading*0.2%+2 words) (500≤3000)

±(reading*0.3%+2 words) (≤3000)

Resolution

0.9-9.9999 (0.0001)

10-99.999 (0.001)

100-999.99 (0.01)

1000-9999.99 (0.1)

10000 and above (1)

Conditions of Use

Power supply: built-in lithium battery or external charger, charger input 100-240VAC, 50Hz/60Hz

Charging voltage: 8.4V

Charging current: ≤2A

Charging time: about 3 hours

Use time:> 8 hours

V. Charging the battery

Before using the instrument for the first time or after a long period of storage or when the battery is low, please charge the battery for at least 3 hours with the included charger, and you can continue to use the tester while charging. After the battery is fully charged, the charger indicator turns from red to solid green.


VI. Function Module

High-voltage test terminal: yellow, green, and red three-color terminal blocks, corresponding to the three phases of A, B, and C, respectively, and correspondingly connected to the side of the red test line with the elastic rod. The other end of the test line has the yellow, green, and red test clamps. Correspondingly connect to the three phases A, B, and C on the high-voltage side of the transformer under test; connect the yellow and green test wires for single-phase testing.

Low-voltage test terminal: yellow, green, and red three-color terminal blocks, corresponding to the three-phase a, b, and c respectively, and are connected to the side of the black test line with the elastic rod. The other end of the test line has three-color test clamps of yellow, green and red. Correspondingly connect to the three phases a, b, and c on the low-voltage side of the transformer under test; connect the yellow and green test wires for single-phase testing.

Display: 5.6-inch large industrial-grade high-brightness color LCD screen, displaying operating menus and test results.


VII. Operating Instructions


Single-phase transformer or single-phase PT test wiring

The yellow and green test clamps of the red test line at the high voltage test end are connected to the high voltage end of the tested product; the yellow and green test clamps of the black test line at the low voltage test end are connected to the low voltage end of the tested product.

Single-phase CT test wiring

The yellow and green test clamps of the red test line at the high-voltage test terminal are connected to the secondary side of the tested product; the yellow and green test clamps of the black test line at the low-voltage test terminal are connected to the primary side of the tested product.

Three-phase transformer test wiring

The yellow, green, and red test clamps of the red test line at the high-voltage test end are connected to the A, B, and C phases of the high-voltage end of the test product; the yellow, green, and red test clamps of the black test line at the low-voltage test end are connected to a, b of the low-voltage end of the test product , C-phase.

Smart power management

When the instrument is not in operation for a long time, the LCD backlight will be automatically dimmed to save power; the instrument has a low-battery charging prompt function and over-discharge protection; when the power of the instrument is low, it can be charged with a charger, and the instrument can be used normally during the charging process .

Printer instructions

The printer buttons and printer indicator lights are integrated. After the printer is powered on, the indicator light is always on when it is normal, and the indicator light flashes when there is no paper. Press the button once and the printer feeds paper.

Printer paper change: pull out the rotating wrench and open the paper compartment cover; load the printing paper and pull out a piece (exceeding a bit of the paper tearing teeth), the direction of the paper is the liquid side (smooth side) upwards; close the paper Compartment cover, print head paper feed shaft press the printing paper, press the print head paper feed shaft back to the print head with a little force, and push the rotating wrench in to reset.


VIII. Precautions


uFor transformers with multiple tap positions, input the rated high and low voltage voltage values, tap spacing, and rated gears so that the test results can automatically calculate the error value and the tap position where the tap switch is located.

uFor transformers with 19 levels of on-load tap changer, if the taps of 9, 10, and 11 are the same value, the instrument should input 9 when inputting the rated tap position. At this time, after the 12 tap position, the instrument displays that the tap position is higher than the actual tap position. The location is small 2.

uThe tap position of this instrument is set according to the high-voltage side voltage regulation design, assuming that 1 tap is the highest voltage gear. If the voltage is reversed or the tap switch is on the low-voltage side transformer, the tap position and actual tap position will be displayed Upside down.

uThe transformation ratio on the nameplate of a three-phase transformer refers to the ratio of the line voltages of windings with different voltages. Therefore, for transformers with different wiring methods, the transformation ratio and the turns ratio have the following relationship: three-phase transformers with the same primary and secondary wiring The voltage ratio is equal to the turns ratio; when the primary and secondary wiring are different, the turns ratio of the Y--d wiring is equal to the transformation ratio divided by the turns ratio of the D--y wiring is equal to the transformati


  Wuhan Goldhome Hi pot Electrical Co.,ltd(short for Goldhome Hi pot) was established in 2008, its predecessor was state-owned third industry enterprises, one of the earliest enterprises specially in develop, design and manufacture high voltage testing equipment in China.In 2016, merged with Wuhan Sang Electric Co., Ltd. , we realize advantageous compartmentalize and resources reorganization.Now it has become a high-tech enterprise integrating R&D, production, marketing installation and commissioning.1.our-historyOur FactoryGoldhome Hi pot is located in Huading Mould Industrial Park, Economic and Technical Development Zone, Wuhan City, Hubei Province, China, working area more than 4000 square meters.As a high-tech enterprise, we are supported by natural advantages from various research universities in Wuhan city. Goldhome Hi pot works closely with professors from State Grid Power Science Research Institute, Electrical Engineering Colleges of Wuhan University and other scientific research institutions, constantly improving technology and updating products . Now Goldhome Hi pot has more than 20 patented technologies, and many software Copyrights!2.our factory-1product and product applicationOur ProductOur advantage products included AC Resonant Test System, PD Free Test System, AC/DC Hi pot Tester, Primary Current Injection, VLF Hi pot Tester, transformer tester,impulse generator,Transformer oil tester,HV Switch gear Tester ,Insulation Tester,ground Resistance Tester,cable fault locator,relay test set,CT PT analyse,arr ester tester and sf6 gas analyzer,etc.Product ApplicationAll the performance indexes of above testing equipment can reach the leading level in China, widely used in power supply bureau, power plant, power construction, railway, petroleum, chemical industry, metallurgy, coal and other industries.In recent years,our factory continues to expand overseas markets, some competitive products are already exported to American and European countries, Africa, Middle East, etc , and well praised by customers.product applicationOur CertificateAll product process is strictly in accordance with international standards and power industry regulations. And the products are through the national, provincial power authorities testing, as well as CE certification! At present,0ur company has received ISO9001:2015 quality management system certification, ISO14001:2018 occupational health and safety management system certification, and ISO14001:2015 environmental management system certification,and also had got SGS certification.We has more than 20 patented technologies,such as The utility model patent of a frequency conversion series resonance test device,The utility model patent of Lightning impulse voltage testing equipment,The utility model patent of DC high voltage generator,The utility model patent of microcomputer relay protection tester,The utility model patent of High voltage switching characteristic tester., etc.4.certificateoverseas market & our serviceOverseas MarketOur products are sold to Europe, Asia, Africa, North and South America and Oceania, Middle East, etc.and are well received by customers.We had won the bids for the purchase of high-voltage no-partial discharge test equipment from the Polish state-owned insulator production plant, the Myanmar National Grid cable fault tester purchase project, and the high-voltage test equipment purchase project of a Russian power installation and test engineering company.We also sell to end customers, and a single device can also be sold. For example, there are power maintenance and installation companies in Indonesia, South Africa, Denmark, and South Korea, and universities and research institutions purchase and use our test equipment.At the same time, our sales targets also include agencies. At present, we already have cooperated with agents in Singapore, Israel, Mauritius , etc.We insist on providing customers with first-class products and first-class services with reliable product quality and perfect service team.5market-1Our service1.Strict factory testAll products will be assembled and test strictly accord with our product process standard. All qualified products will be issued factory release reports and certificate labels.Defect products or non-qualified products won’t be allowed to make deliver.2.Providing technical materialsDuring the product acceptance, we provide the related manual sheets, packing list,qualified certificate labels, factory test reports and other technical documents.3. Support technical guidanceWe also provide the training for the operators. Complete training includes the skilled operations of our equipment, maintenance and troubleshooting . it also ranges the commissioning and test of our products at site!After-sale service1.First-use responsibility systemAfter the product is delivered, the technician can guide the operation at site if the client requires, and be responsible for the first use of each part2.One year warrantyAll products warranty is 1year, life-time maintenance .During the warranty period, if any defects or damaged because of product’s quality, maintenance or replacement can be provided with free charge in order to let our client’s satisfied !3.TroubleshootingIf the troubleshooting is not difficult, and client can handle with it by themselves, we can offer the call-on line guide within 1 hour!If the troubleshooting is difficult to handle with for client, we can promise that the best solution can be provided within 24 hours!
Similar Product Recommend